1 EUDET Pixel-related activities @ DESY Tobias Haas 29 June 2006

2 Overview Pixel telescope activities –Sensors –DAQ –Infrastructure Magnet Test beam and general infrastructure

3 People @ DESY Ingrid Gregor Lukasz Maczewski (Warsaw University) Tatsiana Klimkovich Uli Kötz Tobias Haas Carsten Muhl

4 EUDET JRA1 Schedule Mech./Inf DESY JRA1 Demonstrator Telescope Construction and Integration Mechanics/ Cooling/ Infrastr. Design We are here  Intermediate Review October 2006

5 Telescope Chip Status Prototype telescope chip (MimoStar 2) at DESY since April Work on general understanding is ongoing. MimoStar 2 USB Imager Board

6 How ? MimoStar Test Bench

7 Ingrid-Maria Gregor, DESY Infrastructure Telescope Mechanics  Box 1:  fixed position, optical bench for three reference planes, temperature controlled  Wall to DUT can be removed  Box 2:  movable in z-direction, optical bench for three reference planes, temperature controlled  Wall to DUT can be removed  Box 3:  Gap between 2 and 3, closed by thermal cover  XY-table: external with “long” mechanical structure to locate the DUT between the reference planes (accuracy: 10um, repeatability: <0.5um per axis)  This “arm” is the interface for the different DUTs  Accuracy of mechanic: 0,1mm (alignment runs foreseen)  boxes can be placed into magnetic field, not the XYtable (cost reasons) z y

8 Ingrid-Maria Gregor, DESY Infrastructure 1 st Drawings in beam directionside view top view Very preliminary !!

9 Ingrid-Maria Gregor, DESY Infrastructure DAQ Infrastructure  2 PCs to be used for the testbeam have been ordered  One for data taking (Windows XP)  2 parallel ports  6 USB ports  Large disk (~0.5 – 1TB)  One for analysis (Scientific Linux 3)  Working on the optimal solution for data sharing and storing  NAS solution  PCI/VME interface ordered

10 Telescope Simulation

11 First Results

12 PCMAG Interface definitions between DESY and KEK are agreed Some savings due to reuse of HE tranfer line and power supply However, movable support will be more expensive than originally planned

13 Reuse from KEK

14 Test beam area 24 Shielding stones moved –to allow access for PCMAG –Improve the shielding Interlock rebuilt Holes for cables from chamber to counting room New lights are being installed General cleanup Whole area was painted

15 Test beam area 24

16 Test beam Operation @ DESY Discussion between U. Kötz and J. Maidment (M): –No changes in near future (→ 7/07) –Electrons, 6 Hz (160ms), 10 10 /bunch –7/07 → 12/07: positrons –*NO TESTBEAMS* for > 6 months in 08!!! –After that *ONLY POSITRONS* –Maximum energy: 6 GeV