Presentation is loading. Please wait.

Presentation is loading. Please wait.

ASIPP HT-7 Daily Operation Report Operation Team I X. Gong, J. Zhao, H. Wang, S. Lin Q.S. Xu, B.J. Ding May 12, 2006.

Similar presentations


Presentation on theme: "ASIPP HT-7 Daily Operation Report Operation Team I X. Gong, J. Zhao, H. Wang, S. Lin Q.S. Xu, B.J. Ding May 12, 2006."— Presentation transcript:

1 ASIPP HT-7 Daily Operation Report Operation Team I X. Gong, J. Zhao, H. Wang, S. Lin Q.S. Xu, B.J. Ding May 12, 2006

2 ASIPP HT-7 Experimental Topic 1 ITB formation by means of current ramp-up assisted with LHCD (proposal from 丁伯江 ) Shot No. 86372-86467 time : 9:30(a.m.)~18:00(p.m.) plasma discharge : LHCD I t : ~ 4040A, I p : ~120kA(Ohmic)+  I p (LHCD), n e : 1.0/1.5 ×10 13 cm -3, P LHW :100kW~370kW,  LHW (N ∥ )0°, ∓ 90°,-150°,180°,270°

3 ASIPP HT-7 I p ramp-up by LHCD Shot No. 86372~86397;  LHW ~0° 86422~86430;  LHW ~-90° 86431~86435;  LHW ~180° 86436~86438;  LHW ~-150° 86439~86440;  LHW ~90° 86441~86442;  LHW ~270° 86443~86466;  LHW ~0°

4 ASIPP HT-7 I p ramp-up by LHCD MHD mode-locking disruption frequently at ne~1.0

5 ASIPP HT-7 I p ramp-up by LHCD Current ramp-up  Ip~90kA by LHCD at ne~1.5;

6 ASIPP HT-7 I p ramp-up by LHCD Current ramp-up vs  ; 86420(0 0 ),86427(-90 0 ), 86435(180 0 ),86436(-150 0 ),86440(90 0 ), 86441(270 0 ) 修改图

7 ASIPP HT-7 I p ramp-up by LHCD Current ramp-up vs P LHW 86372(100kW),86394(200kW),86420(310kW),86452(370kW) 修改图

8 ASIPP HT-7 I p ramp-up by LHCD Current ramp-up vs the time of LHW launch

9 ASIPP HT-7 Experimental Topic 2 Experiment investigation the ZonalFlow on HT-7 (proposal from 刘阿棣 ) Shot No 85198-86242 time : 18:00(p.m.)~22:00(p.m.) plasma discharge : Ohmic It: ~4000A, Ip: 80/120kA, ne: 2/1.5/1×10 13 cm -3

10 ASIPP HT-7 Ohmic discharge for Ohmic discharge for the ZonalFlow investigation Shot No. Ip(kA) ne(×10 13 cm -3) probe position(cm) 86468~86472; 80 2.012 86473~86487; 80 2.00~-4 86488~86499; 80 1.00~-4 86500~86502; 120 2.0-3 86503; 120 1.00 86504~86510; 80 1.50~-4 86511~86513; 80 2.0 gas pump reciprocated probe

11 ASIPP HT-7 Ohmic discharge for Ohmic discharge for the ZonalFlow investigation Low density

12 ASIPP HT-7 Ohmic discharge for Ohmic discharge for the ZonalFlow investigation High density

13 ASIPP HT-7 Routine Ohmic plasma discharge compare with the standard plasma discharge Morning shots Compare with the end of yesterday : 86367→86366; 86370 →86365; 86371 →86364

14 ASIPP HT-7 Routine Ohmic plasma discharge compare with the standard plasma discharge The end of shots Compare with the yesterday: 86514→85853; 86515 →85852; 86516 →85849

15 ASIPP HT-7 compare with the standard plasma discharge

16 ASIPP HT-7


Download ppt "ASIPP HT-7 Daily Operation Report Operation Team I X. Gong, J. Zhao, H. Wang, S. Lin Q.S. Xu, B.J. Ding May 12, 2006."

Similar presentations


Ads by Google