1 Videoconferencing @ CERN: Plans to the future Joao Fernandes IT-UDS-AVC

2 1 st RCTF Meeting – 21 st March 2006Objective  Following an internal discussion and considering the last RTAG 12 report, one finds a large and growing gap between LHC requirements and the current available collaborative facilities at CERN  Objective: Correct and invert this situation by turning CERN videoconference rooms in High- Quality collaborative endpoints UDS - AVC

3 1 st RCTF Meeting – 21 st March 2006 Current Status (I)  16 rooms/auditoria installed -7 H.323 Polycom endpoint based -9 PC based ( with old obsolete H.323/IDSN client software) -4! more projected (H.323 based): - CMS Tracker in Bldg. 28; 40-RB-10 also requested by CMS - TOTEM room in Bldg. 555 - AB division room request in Prevessin  Both point2point and multipoint videoconference -VRVS/EVO ( ~ 80% of the total meetings) -point2point and ESnet MCU (20%) -ISDN multipoint disappeared; ISDN point2point almost -HERMES service in production since Jan 06  Manpower at UDS-AVC -1 FTE (20%) -1 technical staff retiring soon -1 Outsourced Data-aid for assistance to users in VC rooms -1 Caltech Project Associate responsible for VRVS/EVO production and integration UDS - AVC

4 1 st RCTF Meeting – 21 st March 2006 Current Status (II) Meetings Number for HEP Collaborations up to Jan 31 st, 2006 (VRVS only) Collaboration (keyword) 20042005 CMS7581676 ATLAS336357 LHC339400 GLAST216364 D0467251 PHOBOS218225 CLEO193189 KOPIO119150 ALICE46129 *2 weekly meetings a year would represent roughly 100 meetings! **Computing, Networking and Grid projects (i. e. EGEE) not taken into account on the table  Some statistics ()  Some statistics ( based on meeting keyword title )  current resources are not increased for more than 4 years! Insufficient for the upcoming needs and major facility upgrade! UDS - AVC

5 1 st RCTF Meeting – 21 st March 2006 Our Dream (I) GOAL: Turn CERN videoconference rooms in High-Quality Collaborative Endpoints, Self-Service with a Simple Setup As result, reduce at the minimum the operator intervention  Video & Audio conference (1) -Find an integrated and simple solution -H.323 based with SIP support -Full compatibility with the multipoint platforms used at CERN (VRVS/EVO, EsNet MCU and the new HERMES MCU service) -One unique integrated solution for video, audio and data sharing -The same unique solution for phone conference (collaboration with CS group for PABX usage for phone conference) UDS - AVC

6 1 st RCTF Meeting – 21 st March 2006 Our Dream (II)  Automate the most the videoconference room equipment (2) -CMF for the room NICE PCs -Acquisition of a framework for endpoint management (TMS from Tandberg under study) - for endpoint management (central software update, troubleshooting, etc.) - monitoring, booking and Statistics - Good flexibility (Webservices API) and possibility to manage almost any device that understands SNMP -Investigate the integration possibilities of this framework with the relevant CERN systems (Indico Outlook) -Include also local projection equipment in the automation when relevant UDS - AVC

7 1 st RCTF Meeting – 21 st March 2006 Our Dream (III)  Focus on the local facility (3) -Investigate the recommendations from vendors for local acoustic and lightning conditions (may include carpeting, painting, etc.) -Compulsory local equipment (NICE PC, 2 projectors or LCD/Plasma screens) -NICE PC compulsory for data sharing in all the collaborative platforms - has to be seen as part of the endpoint core setup; placed where users can really use it! -Possibility of having the audio system integrated with codec endpoint to significantly reduce the efforts of installation/integration in the local facility - up to now there is a significant effort of installation/integration by the technicians as a consequence of purchasing the videoconference stations and peripherals (projectors, auxiliary cameras, etc. ) each from the cheapest provider. UDS - AVC

8 1 st RCTF Meeting – 21 st March 2006 Extension to Related Activities  Desktop VC -Investigate the video/audio hardware solutions on the market -Testing of videoconference desktop clients/applications -Standardize the obtained results and distribute it in CERN stores -Centrally support the chosen standard (for Windows, Linux and Mac)  Audioconference -Find an unique solution for videoconference and phone conference -Close collaboration with IT/CS PABX service  Webcast -Study of the replacement/improvement of the existing CERN webcasting infrastructure UDS - AVC

9 1 st RCTF Meeting – 21 st March 2006 New Plan CERN PABX service H.323 H.323 or SIP Point2point Messenger PSTN CERN Integrated Collaborative Facility (Audio, Video & Data sharing) HERMES, EsNet or other H.323 MCU services SIP VRVS/EVO UDS - AVC

10 1 st RCTF Meeting – 21 st March 2006 What we are already doing (I)  Forming RCTF (Remote Collaboration Task Force) with the representatives of the Experiments -Financial support needed -Manpower needed -Discussion of the direction to take  Close contact with the main vendors in the market (Tandberg, Polycom and Aethra) -detailed analysis of the endpoint proposals -find a solution that meets the quality of service needed and the budget limitations for each case, taking into account the requirements established UDS - AVC

11 1 st RCTF Meeting – 21 st March 2006 What we are already doing (II)  Technical specification for standard room -First Target room refurbished (Atlas 40-4C) will be ready at the end of April 2006 -Test and validate the selected model (1-3 moths period time to “try before buy”)  Testing of Desktop VC equipment -Major HW improvements have been done the last few months pushed by the VoiceOverIP market (ex. Skype and others) -List of recommended Desktop VC hardware (webcams/headsets) and software clients (Polycom PVX) already sent to CERN stores -Hardware recommended for all the platforms (Windows, Linux and Mac) -New USB computer speakerphones with echo cancellation and noise suppression tested with very good results (also a very good alternative for small rooms) UDS - AVC

12 1 st RCTF Meeting – 21 st March 2006 What should be the next steps (I)  Make the same technical preliminary approach for auditoria -Audio in general is the most critical part -Audio setups are necessarily different for larger rooms and further testing is needed  Adopt a management framework flexible, scalable and of easy integration -to finally have a consistent tool for overall management and statistics -Evaluate the integration scenarios with CERN systems  Start endpoint test with PABX system -To find an unique system for both video and audio conference -In general increase the collaboration with IT/CS UDS - AVC

13 1 st RCTF Meeting – 21 st March 2006 Next Steps (II)  Provide Indico with a integrated room booking facility -VRVS/EVO booking API already included; HERMES booking API in development; CERN PABX integration also projected -in the future replace CRBS by an Indico Module for room booking  Review all the online documentation -standardization with IT website made at the end of 2005  Tutorials for the new systems when in place -not only for users but also for the internal staff and room operators -Provide dynamic and intuitive Tutorials (using Camtasia Tool) UDS - AVC

14 1 st RCTF Meeting – 21 st March 2006Conclusions  Collaborative tools start to be a topic of growing importance -CERN situation starts to be critical -People starts to realize that CERN collaborative tools have to be prioritized  CERN facilities refurbishment costs! -Probably not significant when compared to LHC collaborations costs due to absence or inadequacy of facilities -A Major Upgrade needs both financial and manpower resources UDS - AVC

15 1 st RCTF Meeting – 21 st March 2006Future What should be the future of remote collaboration? UDS - AVC