1 Outline: Update on muon/dimuon AOD production (R. Arnaldi/E. Scomparin) Other ongoing activities: MUON correction framework (X. Lopez) MUON productions.

Similar presentations


Presentation on theme: "1 Outline: Update on muon/dimuon AOD production (R. Arnaldi/E. Scomparin) Other ongoing activities: MUON correction framework (X. Lopez) MUON productions."— Presentation transcript:

1 1 Outline: Update on muon/dimuon AOD production (R. Arnaldi/E. Scomparin) Other ongoing activities: MUON correction framework (X. Lopez) MUON productions in PDC09 (N. Bastid) presentations can be found at: http://indico.cern.ch/conferenceDisplay.py?confId=54589 http://indico.cern.ch/conferenceDisplay.py?confId=52721 N. Bastid (LPC Clermont-Fd) ALICE Offline Week, CERN, March 17 th, 2009 PWG3 Analysis Code Status for the Forward Muon Spectrometer

2 2 Update on muon/dimuon AOD production (I) R. Arnaldi, E. Scomparin Dimuon PWG3 Evo Meeting, February 16 th 2009

3 3 Update on muon/dimuon AOD production (II) R. Arnaldi, E. Scomparin Dimuon PWG3 Evo Meeting, February 16 th 2009

4 4 Update on muon/dimuon AOD production (III)

5 5 Update on muon/dimuon AOD production (IV) note: technical compatibility problems due to the Muon/Dimuon AOD production together w/ the other analysis tasks are solved selection of muon events based on AOD tag files: AliAODTagCuts::SetNFWMUONRange()

6 6 Update on muon/dimuon AOD production (V)

7 7 Update on muon/dimuon AOD production (VI)

8 8 Update on muon/dimuon AOD production (VII)

9 9 Status of the MUON correction framework (I) X. Lopez

10 10 Status of the MUON correction framework (II) in progress: analysis task for single muons (AliCFMuonSingle.cxx (.C)) fit functions to extract resonances to-do: CF for dimuon continuum (to be moved in PWG3/muon) X. Lopez

11 11 MUON productions within PDC09 concerning pp @ 10 TeV (I) proposal: minimum bias production several productions with dimuon trigger @ generation: different conditions for alignment (ideal / residual mis-alignment / full mis-alignment) & secret dead maps / cross-sections / polarization motivations: main goal is still to test: the whole analysis framework including the production & analysis of muon/dimuon AOD the HLT (not present in previous productions) min. bias production:  measurement of charm & bottom x-section in a wide p t range (up to about 10 GeV/c) & including the low p t range (  ←  & K needs to be subtracted) dimuon productions:  J/  yield & efficiency measurement  charm & bottom x-section measurement in the US dimuon channel

12 12 MUON productions within PDC09 simulation framework (II) full simulation: generation  reconstruction  production of ESDs cocktail (AliGenMUONCocktailpp class): charmonia & bottomonia according to parameterizations open heavy flavours from fast generator (AliGenCorrHF class) min. bias PYTHIA event (kPyMb, heavy flavour production switched off) detector configuration: MUON + ITS (SPD) + VZERO + FMD HLT included both in simulation & reconstruction standalone MUON trigger LuT: all p t & low p t geometry: ideal / residual mis-alignment / full mis-alignment secret x-sections for HF & quarkonia and secret dead maps for tracking & trigger & polarization trigger @ generation for dimuon productions (at least 2  in spectro. w/ p t > 0.5 GeV/c)

13 13 MUON productions within PDC09 for pp @ 10 TeV: status (III) fast generator of heavy quark pairs not yet available: should be ready by end of April (S. Grigoryan @ LPC in April) resonances: parameterization available for J/  (see S. Grigoryan talk @ Oct. PWG3-MUON-EVO) & needs to be done for other quarkonia, x-sections have been calculated strategy: wait until end of April in order to have parameterizations for both open heavy flavours and quarkonia or use PYTHIA (charm x-section underestimated, bottom x-section overestimated) and ready to ask for dimuon productions  one will need to commit a new version for AliGenMUONCocktailpp, AliGenCorrHF & AliGenMUONlib classes  a new aliroot version is needed for the final productions on the GRID

14 14 MUON productions within PDC09 requirements for dimuon prod. (IV) cocktail: PYTHIA (kPyMbMSEL1) + quarkonia (param. @ 10 TeV for J/  ) trigger @ generation: at least 2  with pt > 0.5 GeV/c (in spectro. acceptance) 12350 events (3.68. 10 8 Pythia events) 8236  +  - J/ ’’  ’’  (  b) 39.146.040.6580.2180.122  (res.) 10 =  (QQ) 10 x  (res.) 14 /  (QQ) 14 requirements (for each dimuon production): statistics: 2. 10 6 dimuon events (~ 1. 10 5 J/ , i.e. 1 month at L = 10 30 cm -2 s -1 ), 40 runs (1 run = 1. 10 3 sub-runs & 1 sub-run = 50 events) CPU-time: ~7.2. 10 3 days (~ 1 week w/ the GRID) storage: ~0.5 TB (archive of files needed for analysis) cross-sections

15 15 Backup slides

16 16 MUON productions in PDC09