Presentation is loading. Please wait.

Presentation is loading. Please wait.

Elisa Rapisarda, CERN, PH Division

Similar presentations


Presentation on theme: "Elisa Rapisarda, CERN, PH Division"— Presentation transcript:

1 Elisa Rapisarda, CERN, PH Division
CERN ISOLDE The Isotopes Separator Online DEvice Elisa Rapisarda, CERN, PH Division

2 The Nuclear Chart periodic stable b+ decay b- decay decay p decay
82 50 20 126 28 8 system periodic stable b+ decay b- decay decay p decay fission predicted Closed Shells atoms: noble gas nuclei: magic numbers 8

3 Production of Radioactive Ion beams
Nuclear Reaction: proton (1.4 GeV) + 238U (1012 atomen per seconde) Purification: Separation in mass number (A) Separation in proton numbers/ element (Z): lasers Transport of the ion beam (sometimes 1 atom per second) to the measurement setup Acceleration in order to induce a new Nuclear Reaction 126 82 50 50 20 28 8 28 20 8

4 CERN It all starts with a bottle of hydrogen …

5 CERN … followed by the LINAC2 …

6 CERN … and the 4 rings of the PSBooster

7 ISOLDE targets Service Robots

8 ISOLDE target In position

9 ISOLDE target Proton on target or on the neutron converter

10 Research with Radioactive Beams
Why? cosmology Existence of the elements Particle physics (standaard model) Astrophysics 0=>1028 cm Oerknal 1022 cm Sterrenstelsels Quarks, leptonen <10-19 cm 1018 cm Supernova Hadronen <10-13 cm 1011 cm De zon Energy Kernen <10-12 cm Nuclear Physics 106 cm AMS in het klimaat 102 cm Geneeskunde Gevangen atomen 10-8 cm 10-3 cm Gemerkte cel Kanalisatie cm Climate atomic Physics v Medicine Solid State Physics Biology

11 CERN ISOLDE Isotope Separator On-Line DEvice MEDICIS WITCH:
Laser spectroscopie Collaps - CRIS HIE-ISOLDE-acceleration (REX) MINIBALL WITCH: fundamental interaction Solid State Research MEDICIS IDS: Decay study

12 Courtesy of T.E.Cocolios
-spectroscopy: Previuos Experimental Setup Courtesy of T.E.Cocolios Annular Si Si pure 30 keV Tl beam from RILIS+ISOLDE Intensity = 104 pps C-foils 20 mg/cm2 Si detectors Si Annular Si ff a 30 keV beam from ISOLDE C-foil Ge detector #1 Windmill Chamber

13

14 Possible Projects Installation of the apparatus started in Feb 2014
Beam line modification is going on; AUTOCAD technical drawing of the new beam line and the experimental area Beam optical simulations of the latest part of the beam line (Switchyard + three quadrupoles) (MADX and Simion software) Ongoing work in coming months: Install detectors frame (hands on) Install an automatic Refill system of Liquid Nitrogen for the Germanium detectors (hands on) Test Germanium detectors (set up a simple 1-channel data acquition system) Commission Tape station and ancillary detectors (hands on) Team: you will join a small group of 3 to 5 persons (locally 2 Senior Post-Doc, 1 PhD student) goal: be ready for first decay experiment end July 2014


Download ppt "Elisa Rapisarda, CERN, PH Division"

Similar presentations


Ads by Google