1 PROJECT ADVISORY COMMITTEE June 19, 2012. 2 3.

Similar presentations


Presentation on theme: "1 PROJECT ADVISORY COMMITTEE June 19, 2012. 2 3."— Presentation transcript:

1 1 PROJECT ADVISORY COMMITTEE June 19, 2012

2 2

3 3

4 4 2040

5 5

6 6

7 7 Tools in the Toolbox Source: Project Connect, Dec. 2

8 8 North Central (NC) Southwest (SW) Northeast (NE) Southeast (SE) South Central (SC) Northwest (NW) Central (C) West (W) East (E) 15 20 25 30 35 10 5 0 Source: Project Connect

9 9 West Austin ROW Preservation Source: Project Connect DRAFT

10 10 Traffic congestion in central Texas is a serious problem and must be addressedTraffic congestion in central Texas is a serious problem and must be addressed Because of central Texas’ growth and constraints to expanding highways alternative transportation options should be exploredBecause of central Texas’ growth and constraints to expanding highways alternative transportation options should be explored High capacity transit can be an effective part of the solution for improving mobility in central TexasHigh capacity transit can be an effective part of the solution for improving mobility in central Texas Source: Project Connect, TWG, Dec. 2012

11 11 Source: Project Connect, Jan. 2012

12 12

13 13

14 14

15 15

16 16 LPA Alternative A Alternative F Alternative D Alternative C Alternative B Alternative E Alternative A Alternative C Alternative F Initial and suggested alternatives identified Evaluation criteria identification and screening Remaining alternative(s) carried forward for detailed evaluation. Selection of a Locally Preferred Alternative (LPA) Screening Project Development Detailed Screening

17 17

18 18 Conventional Bus Conventional Bus Express bus in managed lanes MetroRapid MetroRapid Bus Rapid Transit Bus Rapid Transit (BRT) (BRT) Urban Rail Light Rail Commuter Rail (MetroRail) Regional Rail

19 19 Preliminary Schedule

20 20 Todd Hemingson, Capital Metro, VP Strategic Planning – – todd.hemingson@capmetro.org todd.hemingson@capmetro.org – – (512) 369-6036 John-Michael Cortez, Capital Metro, Manager - Community Involvement – – john-michael.cortez@capmetro.org john-michael.cortez@capmetro.org – – (512) 369-6201 Lynda Rife, Rifeline, LLC, Principal – – lrife@rifeline.com lrife@rifeline.com – – (512) 797-9019 Reed Lee, HDR Engineering, Inc., Project Manager – – reed.lee@hdrinc.com reed.lee@hdrinc.com – – (210) 260-452

21 21 QUESTIONSANSWERSDISCUSSION

22 22 CentersCoreConstraints CongestionGrowth