Enterprise Integration Project 1 Enterprise Integration Project Proof of Concept I Review Daryl Shing December 5 th, 2006.

Similar presentations


Presentation on theme: "Enterprise Integration Project 1 Enterprise Integration Project Proof of Concept I Review Daryl Shing December 5 th, 2006."— Presentation transcript:

1 Enterprise Integration Project 1 Enterprise Integration Project Proof of Concept I Review Daryl Shing December 5 th, 2006

2 Enterprise Integration Project 2 The Goal of Proof of Concept I Perform a complete RUP Iteration within the EIP team. Develop iteration one of the core integration approach. Develop iteration one of the MMS to Settlements and Billing integration (subset of billing determinants). Develop iteration one of the Common Services. Establish the Development Environment. Requirements DesignDevelopmentTestDemo

3 Enterprise Integration Project 3 Overall Integration Conceptual Architecture Application Layer: Operation/Admin MMSEMS Business Logic Layer : Design/Build Designer IDE Schema Process Definition Event Test cases Business Process Layer: Presentation Layer: Portal Application Server Legacy System Business Works Web Server Business Works Process Engine AJAX Client (GI) Internal/External User: Web Client Application CS NMMS XML Canon Version Control EMS (JMS)/RV Transportation Common Services Notification Auditing Scheduling Exception Transformation Validation Meta Data WSDL Hawk Monitoring Rules Engine Recovery Administrator Monitoring Deployment Operation Ctrl Security Browser MIS

4 Enterprise Integration Project 4 Settlement Integration Conceptual Architecture Interface requirements and a high degree of complexity dictated that an interface application that uses a staging approach was required to “bridge the gap” between MMS/CRR and Settlements Source Systems (MMS, CRR, etc..) Lodestar System Bill Determinant Pre-Processor Operator UI TIBCO Integration Layer Integration Layer Staging Integration Layer

5 Enterprise Integration Project 5 Logical Process Flow CreatedExtractedValidatedProcessedVerifiedExported All Extracts Successfully Completed For Market All Extracts Successfully Validated For Market All Bill Determinants Created For Market All Bill Determinants Verified For Market All Bill Determinants Exported For Market Extract Errors Validation Errors Process Errors Verify Errors Export Errors

6 Enterprise Integration Project 6 POC Screens

7 Enterprise Integration Project 7 POC Screens

8 Enterprise Integration Project 8 Process Orchestration

9 Enterprise Integration Project 9 Monitoring & Management High availability with distributed architecture Monitors run time integration components (TIBCO, DBs, web- servers, HW/OS) Proactive event driven custom rules (shutdown/restart, send email/SMS alerts) Integrates with enterprise monitoring tools (i.e. HP OpenView) via SNMP Integration Server Hawk RV Messaging Bus Business Works Messaging Server Hawk JMS OS Rules

10 Enterprise Integration Project 10 Next Steps The next Iteration of the MMS to Settlements integration is being planned. Six iterations covering most of the major systems will be completed between now and March 31st, 2007. The team is incorporating lessons learned from POC I. Requirements DesignDev.TestDemo Requirements DesignDev.TestDemo Requirements DesignDev.TestDemo Requirements DesignDev.TestDemo Requirements DesignDev.TestDemo Requirements DesignDev.TestDemo

11 Enterprise Integration Project 11 Questions