1 SoLID review DAQ recommendations Alexandre Camsonne

2 Recommendations 2c 1.The plans for the High Level Trigger and the needs for slow control need to be worked out in detail and the implications for resources need to be evaluated. 2.The implications of the need for these resources in the context of availability of resources at the laboratory need to be understood. 3.Closer communication with the other JLab experiments and the JLab computing center is strongly encouraged. 4.Having a functional simulation and reconstruction routines as soon as possible should be a high priority in the software effort. Such software will pay off many times over in experimental design and avoiding pitfalls.

3 DAQ observations

4 Dead time correction PVDIS 1b.2 Test with small scale setup Simulation Discuss with DAQ group for particular features needed – Example : helicity gated deadtimes

5 L3 trigger 2c1 Test on small scale L1 trigger L3 farm : collaborate with Hall D, try to test simulated data on their setup Need simulated digitized data and tracking algorithm to test online Need to figure out funding

6 Ressources 2c2 Computing ressources needed for L3 Tape SILO needs, network Manpower

7 L3 trigger 2c2 Test on small scale L1 trigger L3 farm : collaborate with Hall D, try to test simulated data on their setup Need to figure out funding

8 Communication with other groups 2c3 Try collaborate with Hall D Constant communication with JLAB DAQ and electronics group Hall C interested in using VETROC for logic and readout check experience with APV and FADC from HPS – Already planning to reuse HPS trigger scheme

9 Recommendation 2c4 See software talk

10 Forgotten recommendation Bunker design – Radiation – Cooling of bunker to be evaluated / design

11 Pre R&D Test trigger rate capability ( 3 months + 1 JLAB ) Test triggering schemes ( implementation 3month / test 6 month + 1 person JLAB) GEM APV rate capability ( before end of August : 3 months +1 person (UVA+Stony Brook) MRPC : high resolution timing L3 : performance tests and data reduction ( 6 months / 1 student or postdoc and JLAB staff) – Need simulated data ( software ) – Reconstruction algorithm to test ( software )

12 Hardware FADC availables VXS crates and Intel CPU GTP borrowed VETROC available R&D need – Individual FADC reading – Trigger setup – Deadtime measurement for PVDIS – ( High resolution TDC )

13 Manpower JLAB : – Alexandre Camsonne – Robert Michaels ( Compton development ) – Electronics group – DAQ group Stony Brook – Seamus Riordan – Krishna Kumar – Postdoc – Student Need to make detailed manpower and task schedule for R&D and experiment

14 Timeline Summer SBS projects – GTP : calorimeter – VETROC : used by Compton – FADC : FADC counting DAQ deployment – L3 farm test will Hall D – GEM : MPD test Development : – Deadtime mesurement – FADC readout and trigger serialization ( could be used by other experiments NPS, SBS )

15 Conclusion L3 needs addressed with Hall Slow controls being addressed Several tests this summer can address recommendation Working on detailed man power loaded schedule