MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze.

Similar presentations


Presentation on theme: "MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze."— Presentation transcript:

1 MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze Pinkel/Klymak (tent) 15 Lee/D’Asaro Stewart Johnston/Rudnick THOMPSON Cowles D’Spain Davis (when needed) Gregg/Miller Chavez CYPR. SEA Healey

2 Sanctuary Boundary Nominal ASAP Box Nominal DORADO Line

3 Flight Path Comparison

4 Issues to Resolve What are the dates for the experiment? What are the dates for the experiment? Ship Surveys Ship Surveys Dates Dates Survey Area Survey Area What to Sample What to Sample Can Rudnick/SeaSoar do final survey? Can Rudnick/SeaSoar do final survey? Demand for a final survey? Demand for a final survey? Aircraft Surveys Aircraft Surveys Large scale/model initialization Large scale/model initialization Small scale/fluxes/model updates Small scale/fluxes/model updates

5 Issues to Resolve - 2 DORADO Surveys DORADO Surveys Do from POINT SUR? Do from POINT SUR? Where/What to Survey Where/What to Survey Treat all propeller-driven assets as a group Treat all propeller-driven assets as a group (“surging”) (“surging”) Northern Line (Half Moon Bay) Northern Line (Half Moon Bay) For model initialization For model initialization How to cover How to cover Space Space At the MBARI Control Room At the MBARI Control Room Who needs to be in control room this time? Who needs to be in control room this time? On board ships at sea On board ships at sea

6 Issues to Resolve - 3 Communications Communications Ship to Ship Ship to Ship Ships to Shore Ships to Shore Coordination with other programs Coordination with other programs AESOP AESOP PLUS PLUS AWACS AWACS LOCO LOCO Optics (HES/OS?) Optics (HES/OS?) Hyperspectral Flights Hyperspectral Flights Scofield AUV Scofield AUV

7 Issues to Resolve - 4 Acoustic Issues Acoustic Issues Need to be up front Need to be up front Do Assessment, hopefully not full EIS Do Assessment, hopefully not full EIS PLUSnet vs. SeaWeb “integration” PLUSnet vs. SeaWeb “integration” (or at least not interference!) (or at least not interference!) Public Relations Public Relations Generate excitement at all levels Generate excitement at all levels K-12 K-12 General Public General Public Science Community Science Community Need to work this in advance Need to work this in advance Coordinate between institutions Coordinate between institutions Don’t miss big opportunity Don’t miss big opportunity

8 Issues to Resolve - 5 Gliders Gliders Number available Number available SPRAY - 4 SPRAY - 4 SLOCUM – minimum 6 SLOCUM – minimum 6 Seaglider (PLUSnet) – 5 Seaglider (PLUSnet) – 5 The Seahorse The Seahorse Ralf Coming? Ralf Coming? Initial Deployment Pattern Initial Deployment Pattern Etc. Etc.

9 Issues to Resolve - 6


Download ppt "MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze."