Presentation is loading. Please wait.

Presentation is loading. Please wait.

LEA Transportation Funding 2009-2010 DPI Transportation Services Derek Graham, Section Chief.

Similar presentations


Presentation on theme: "LEA Transportation Funding 2009-2010 DPI Transportation Services Derek Graham, Section Chief."— Presentation transcript:

1 LEA Transportation Funding 2009-2010 DPI Transportation Services Derek Graham, Section Chief

2 Agenda Estimating Transportation Allotment for 2009-2010 TIMS Service Indicators Routing strategies / review of applicable laws and policies

3 Estimating Transportation Allotment for 2009-2010 What you will need: –2008-2009 transportation funding information sheet dated November 27, 2008 –Number of buses operated 2008-2009 –Student Count, October 2008 –Expenditure Information –Budget Rating Simulator Software

4 PRC 56 Allotment (Transportation) Funding Base Reduction for fuel costs Multiply by Budget Rating Reduction for legislative cuts Increase for higher ADM

5 ADM increase Most LEAs will not see an ADM increase for 2009-2010 because an increase in enrollment may be offset by a decrease in the Kindergarten class, resulting from the change in the applicable birth date for enrollment For those that will have a projected increase, a 1.6% increase (for example) will result in a 1.6%$ allotment increase

6 Funding Base = Total Eligible State and Local Expenditures (PRC 56) for 2008-2009 1.Start with line 1 (1a+1b) of your transportation info from Nov. 27, 2008 2.Add additional funds for ADM increase (line 9) 3.Add additional funds for salary increases (line 10) 4.Subtract Line 12a to reduce fuel from $2.90 (2007-08 actual) to $2.40 (2008-2009 allotted) 5.Subtract: Multiply Line 12a by 0.7 to reduce fuel from $2.40 to $2.05 for 2009-2010

7 CALCULATE SIMULATOR RATING 1.Update Number of Students Transported from TD-2, October 2008 2.Update Number of Buses Operated for 91+ Days, 2008 – 2009 3.Update State Expenditures from 2008 – 2009 1.Total Eligible State Expenditures 2008-2009, PRC 56 2.Add State Funds that would have been spent if no freeze 3.Add Total Eligible Local Expenditures, PRC 56 (to be reported on TD-1) 4.Subtract Local Expenditures spent only because of freeze 5.Add Fuel Offset Due to Falling Fuel Prices ===>Multiply Line 12a by 1.38 6.DIVIDE ALL EXPENDITURES BY 2 FOR SIMULATOR

8 Estimate Transportation Funding Funding base for 2009-2010 x Simulator Rating (-) Legislative Cut (+) ADM Increase (if applicable) ( )Salary/Benefits Adjustments = Estimated Transportation Funding for 2009 - 2010

9 TIMS Service Indicators Developed by the TIMS project staff Rob Hamby, UNCC Urban Institute Statewide Data for LEA Planning Indication of compliance www.ncbussafety.org - TIMS

10 A Guide to Better Compliance with North Carolina State Rules, Regulations, Guidelines, Policies and Laws Governing Bus Routing and Scheduling www.ncbussafety.org

11 TIMS A helpful tool in times of budget cuts.

12 SUMMARY ** There will be a statewide budget cut ** There likely will not be enough funding for full reimbursement of early college ** There likely will not be additional state funding if fuel rises above $2.058 per gallon ** Efficiency measures are in order ** Student Safety is ALWAYS in order

13 LEA Transportation Funding 2009-2010 DPI Transportation Services Derek Graham, Section Chief


Download ppt "LEA Transportation Funding 2009-2010 DPI Transportation Services Derek Graham, Section Chief."

Similar presentations


Ads by Google