CON 4003 Construction Estimating Prof R. V. Locurcio.

Similar presentations


Presentation on theme: "CON 4003 Construction Estimating Prof R. V. Locurcio."— Presentation transcript:

1 CON 4003 Construction Estimating Prof R. V. Locurcio

2  Famous structures  Where does it come from?  Types of Steel  Shapes  Units of Measurement  Estimating  Connections  Problems

3

4

5

6  Fabricated at steel fabrication shop  Assembled and erected on site  Often design of the connections is left up to fabricator as shop drawings

7

8  Fabricator submits shop drawings to the structural engineer  Usual charge +15% over price of raw steel  Add transportation cost from fabricator to site  Engineer then will check to make sure the connections are adequate  Will either approve or make changes to the drawings

9

10

11  A36 carbon steel (most common)  A529 carbon steel  A440 high strength steel  A441 high strength, low alloy steel  A588 corrosion-resistant, high strength, low alloy  Etc…

12 WF Beam AS Beam AS Channel Structural Tee WF Beam AS Beam AS Channel Structural Tee Angle Structural Tubing PipePlate Angle Structural Tubing PipePlate

13

14  W18 x 55 Grade 50  W is the shape of the beam W= wide flange or WF  18 is the depth in inches Depth is the “web”  55 is the weight or number of pounds per LF  50 is 50,000psi

15  Estimate total linear feet  Categorize each beam shape  Size and weight  Each shape beam has a different weight  Structural-Steel handbook  RS Means  Buyer pays for ACTUAL weight

16 structural steel members weight of each. When estimating beams, girders, and columns, it is important to estimate not only the number of structural steel members needed but also the weight of each. Do not round up quantities until the final step

17  Two key types of connections…  Bolted  Welded  Determined by structural engineer  Shown in construction docs or  Shop drawings  Read the drawings  Special requirements  Welding certification  Bolt torque specs

18

19

20

21

22

23

24

25

26

27

28  One (1)C12x30 (10ft)  Four (4)W12x45 (28.5ft)  Six (6)W12x45 (29.583 ft)  Two (2) W18x86 (39.33 ft)  One (1)W18x175 (39.167 ft)  Four (4)15 ft C1 columns (40lb per ft)  Two (2)15 ft C2 columns (53 lb per ft)

29

30

31

32

33

34

35 Price from RS Means = 15.51T x $2250/T = $34,897.50 mat. + 50%= $17,448.75 x $273/T = $4234.23 lab. + 25%= $1058.56 x $251/T = $3893.02 equip. Total = $61,532.06

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55 1.Fabricated & primed at a steel fabrication shop 2.15% Fabrication charge 3.Pay for shipping to site… depends on location 4.Many shapes 5.Estimation is by weight… lbs or tons 6.Use Means for labor & equipment charges

56 Handout assignment Due Tuesday, Sept 22 nd

57

58 CON 4003 Construction Estimating Prof R. V. Locurcio

59

60

61

62

63

64

65

66

67

68

69

70

71

72