Presentation is loading. Please wait.

Presentation is loading. Please wait.

Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.

Similar presentations


Presentation on theme: "Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group."— Presentation transcript:

1 Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group

2 The Glass RPC SDHCAL prototype 40 1m 2 layers of – steel absorber (1,5cm) – 6mm thick glass RPCs in 5mm thick steel cassettes Total of 5 λ I Avalanche mode TFE (94.5% Isobutane (5%), SF6 (0.5%) Multiple thresholds to allow for the recognition of the dense shower center. 1 cm 2 charge collectors with 3 thresholds Power-pulsed electronics Requires no cooling ! 221/10/10IWLC 2010

3 3 Cross-section of GRPCs PCB support (FR4 or polycarbonate) PCB (1.2mm) Mylar layer (50μ) Readout ASIC (Hardroc2, 1.4mm) PCB interconnect Readout pads (1cm x 1cm) Mylar (175μ) Glass fiber frame (1.2mm) Cathode glass (1.1mm) + resistive coating Anode glass (0.7mm) + resistive coating Ceramic ball spacer (1.2mm) Total thickness including embedded electronics: 5.825mm Gas gap 21/10/10IWLC 2010

4 Resistive coating 4 CoatingResistivityMultiplicityHV ConnectionApplication Graphite 400 kΩ/ □ >1.6 @ 7.4 kV ✓ Licron >20 MΩ/ □ ✓ ✗ LostSpray Statguardfew M Ω/ □ ✓✓ Roll (liquid paint) Colloidal graphite few M Ω/ □ ✓✓ Silk screen printing 21/10/10IWLC 2010

5 GRPC read-out 3 DIFs (Detector InterFace boards) 144 ASICs (HARDROC2 chips) reading 64 1cm 2 PADs each 21/10/105IWLC 2010

6 Cosmic test bench 6 Up to five 8x32 cm Chambers for tracking Trigger scintillator 21/10/10IWLC 2010

7 Efficiency homgeneity vs HV scan 3 different areas HV scan on 3 different areas. Statguard coated chamber. 7 Top-Right Top-Center Down-Left Results obtained using tracking DIF6 DIF9 DIF10 21/10/10IWLC 2010

8 Beam tests 1 m 2 Statguard chamber tested @ CERN-PS in May 2010 – 10 GeV  2 1m 2 colloidal graphite chambers inserted @SPS H4 (150 GeV  ) in September 2010 Beam 21/10/108IWLC 2010

9  HV: 7.5 kV  Position scan area  Homogeneous  >95% 1m 2 GRPC map Efficiency homogeneity studies 9 Results obtained using time selection only 21/10/10IWLC 2010

10 Multiplicity homogeneity studies 21/10/1010  HV: 7.5 kV  Multiplicity highly depends on threshold level  Homogeneous  <1.3 for threshold ~0.25 MIP Results obtained using time selection only 1m 2 GRPC map IWLC 2010

11 Principle of power pulsing Power On Period: 10ms (100 Hz) DutyCycle: 2/10 2 ms Enable Acquisition Trigger for chip readout Injecting on falling edge through a 2pC build in capacitor Scintillator Coincidence « In Spill » Signal & Veto From Acquisition DIF Trigger Power On 24 Hardroc2 Busy Trigger Enabling Power Pulsing: consumption goes from 2A to 0.7A 21/10/1011IWLC 2010

12 Beam conditions: 80GeV @ High Rate Aim: PowerPulsing tests using B field. Beam Beam 32x48 cm 2 GRPC field B field 3T Magnet Power Pulsing Test Beam 21/10/1012 IWLC 2010

13 Power Pulsing 1ms after power-ON : no efficiency loss 1ms after power-ON : no efficiency loss. Studies are still ongoing to reduce waiting time to 0.1 ms 3T B field 21/10/1013IWLC 2010

14 Analysis Summary Efficiency more than 95%. Multiplicity < 1.3 Pad/MIP (must be re-defined using the 3 thresholds) Detection rate: Steady up to 100 Hz/PAD Noise rate: ~0.1 Hz/cm² Detector working in a 3 Telsa field Good efficiency/multiplicity homogeneity on large chamber Validity of power pulsing concept proven. 21/10/1014IWLC 2010

15 15 The ASICs are ready for the 40 layers. Currently under test, using a robot. Max test time : 10 minutes/ASIC using Labview-based application Electronics: ASICs test facility 21/10/10IWLC 2010

16 Towards 1m 3

17 17 Final total thickness 11 mm aperture 12.5 mmSuccessful insertion from above Chamber assembly going on 21/10/10IWLC 2010

18 Test bench for production 1821/10/10IWLC 2010 2x2 X-Y scintillator planes Cosmic rate 200Hz Gas+HV/LV supplies for up to 7 gRPCs that can be tested in few hours Gas mixer

19 Mechanics Self supporting structure Spaced using bolted spacers ANSYS simulation of stress and deformation : <150µm 21/10/1019IWLC 2010 Plate assembly under test

20 Summary 1 m 2 glass RPCs have good efficiency, multiplicity, power pulsing works. – Not detailed but under control: ageing, gas flow, HV & gas services 1 m 3 construction ongoing to be finished first term 2011 Ongoing; – threshold calibration using charge injection – Latest Colloidal graphite testbeam result analysis 21/10/10IWLC 201020


Download ppt "Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group."

Similar presentations


Ads by Google