Work Study Prof. Dr. Orhan TORKUL Arş. Gör. M. Raşit CESUR Arş. Gör. Furkan YENER.

Similar presentations


Presentation on theme: "Work Study Prof. Dr. Orhan TORKUL Arş. Gör. M. Raşit CESUR Arş. Gör. Furkan YENER."— Presentation transcript:

1 Work Study Prof. Dr. Orhan TORKUL Arş. Gör. M. Raşit CESUR Arş. Gör. Furkan YENER

2 Work Design and Organizational Success Elementally, the ability of an organization to convert form input to output. Productivity = Effectivity Efficiency Quality Innovation Productivity Quality of business life Profitability (Organizational success) Output Input

3 Method Study Method study is a systematic approach to find out easier and better ways in order to be success in a task. 5 steps for systematic approach in Method study; 1. Select the work: Highest cost or lovest productivity works are prefered in generally. 2. Obtain and save the facts: Datas should save such as actual method and frequency of work 3. Examine the details: Actual method should examined, Some elemants could be removed or modified.

4 Method Study 5 steps for systematic approach in Method study; 4. Improve better method and make tests: New method should be improved based on changes and make tests. 5. Establish and sustain of the improvement: Improved method should be enhanced and implemented.

5 Flow Process Diagrams/Charts Flow work diagram contains all activities(operations, storages, inspection, carrying and delays) in a process. Process Start Specialist Actual_____Proposed______ Man____ or Material _______ Stop Date Steps 1. 2. 3. 4. 5... SymbolsExplanations Flow Process Charts

6 Two Handed Process Charts Two Handed Process Chart could be used for analyze of work made by someone at the spesific work center.

7 Two Handed Process Charts

8 Operation________ Name _________ Date ___________ Actual _______________ Proposed ____________ Work place layout and product drawing (if it is necessary) Left hand Activities 1. 2. 3. 4. 5... SymbolsRight Hand Activities Two Handed Process chart

9 Two Handed Process Charts Operation: (one) hand makes some efficient operation, Transport: (one) hand moves from one place to another, Delay: Hand does nothing, waits, Hold: Hand keeps an object.

10 Other Schemas Flow process chart : A flow diagram is basically a process flow diagram of the facility was drawn with the goal of the configuration. Multiple activity Schema: Multi - activity Schema shows at least two or more objects, man and machine activities simultaneously. Work Distrubition Schema: the list of everybody’s activities and responsibilities in a departmant or group. Operation Process Chart: Inessential work, inspection or storage are eliminated and to obtain proper sequences of the these. Gantt Schema: Gantt Schema is a horizontal timeline diagram which is used in scheduling and it shows relative timeline of various activities.

11 Principles of Movement’s Economy Thoughts and notions are proved of benefits when effective work procedure is planning. The following principles of movement’s economy list is taken from Mundel. 1. Remove 2. Combining 3. Redesign 4. Simplification

12 Human Engineering Workers and machines can work together as a system to ensure more effective and efficient human-machine interface design. Today, thanks to human engineering, machinery may lowered or set up higher position or completely re-designed and thus the worker and the machine can be provided as a single system work better. A good example of Human engineering is aircraft cockpit design.

13 Work Measurement Under normal operating conditions and at a normal pace, and trained an average person working 8 hours per day, a measure of the time required for the fulfillment of the task. 1. Normal Time 2. Normal tempo 3. Actual Time 4. Tolerances

14 Standart Time Calculation 1. Directly Time study 2. Time study’s standart datas 3. Pre-determined Time systems 4. Pre-determined Time systems standart datas 5. Work sampling

15 Direct Time Study The actual time required to do a job, taking into account the tolerance measure of the time directly.

16 Time Study Form

17 Performance Evaluation Calculations OPERATIONAVERAGE 115 27 35 48 Total Actual Time=15+7+5+8=35 Success Evaluation=%115 Normal Time=(35)(1,15)=40,25 Tolerances=%12 Standart Time=(40,25)(1,12)=45,08 Normal Time = Actual Time X Success Evaluation If operator performance is %90 or less than %10 from normal expectations, Normal time colculates as following solution. Normal Time = (35)(0,90) = 28,50 To suppose doing a study and personal needs constitute work days %4 and tiredness effects the performance %5 and unavoidable delays accure %3 at time. Tolerances = %4 + %5 + %3 = %12 We needs to add Tolerances to the Normal time in order to calculate the Standard time we may find Standart time as follows. Standart Time:(40,25)(1,12) = 45,08

18 Time Study’s Standart Datas Time study’s standart data’s using the worths which are obtained from normal time schedule previously. Y X6 cm8 cm10 cm12 cm 6 cm0,0250,026 0,027 8 cm0,026 0,027 10 cm0,0270,028 0,029 12 cm0,0270,0280,0290,030

19 Pre-determined Time Table Leave any parts of the job detail, various factors (weight, distance and etc.) previously created by taking into consideration, when utilized as reference values ​​table is called a pre-determined time table. Giving an object from one hand to another; weight > 2 lb. X 0,454 kg. DistanceTime 4 inch x 2,54 cm0,00412 min 8 inch0,00591 min

20 Work Sampling Rate for the time spent on a specific type of activity, instantaneous measurements made ​​using the calculation of random variables is called work sampling. Percentage of Occurrence A Facility Number of observations Accumulated percentage

21 Productivity Measurement

22 Normal Productivity Measurement Model 1. Quiet contemplation 2. Cyclically to express thoughts 3. Intra-group netting 4. Voting

23 Multi-Factor Productivity Measurement Model Basically, MFPMM have two ways that may affect the profitability of an organization. 1. Re-pricing 2. Productivity Variation

24 THANKS