Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Similar presentations


Presentation on theme: "Update of master schedule and report from SLAC G. Riddone 2008.10.08."— Presentation transcript:

1 Update of master schedule and report from SLAC G. Riddone 2008.10.08

2 Master Schedule See EDMS#844300, v3 -Status -Master schedule by test station and by types -Rf components

3 T18 - Alignment Optical measurement (from two sides) ex. T18#4 (OD 45 mm)

4 T18 - Bonding T18_vg2.4_disk_4 Before bonding - OD 45 mm - 2 tuning holes per cell only Then - Brazing of the couplers - Brazing of the studs

5 Tuning C10 – KEK drawing

6 Tuning C10 2. stud: the disk is systematically equipped with studs 3. The tube ends at the tread part of the stud. TK of the tube is not defined

7 Tuning C10 Test set-up for tuning Position for “pulling” Test set-up for tuning Position for “pulling” Sliding hammer to push and pull Disks with tuning studs

8 Structure cell with 45° WG

9 Symmetrical disk No tuning was implemented

10 NLCTA – T18 reverse and T26