Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tanzania and Namibia – Golden Opportunities. www.helioresource.com DISCLAIMER disclaimer tsx-v:hrc This presentation may contain forward-looking statements.

Similar presentations


Presentation on theme: "Tanzania and Namibia – Golden Opportunities. www.helioresource.com DISCLAIMER disclaimer tsx-v:hrc This presentation may contain forward-looking statements."— Presentation transcript:

1 Tanzania and Namibia – Golden Opportunities

2 www.helioresource.com DISCLAIMER disclaimer tsx-v:hrc This presentation may contain forward-looking statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of Helio to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward looking statements may include statements regarding exploration results and budgets, resource estimates, work programmes, strategic plans, market price of precious and / or base metals or other statements that are not statements of fact. Although Helio believes the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Various factors that may affect future results include, but are not limited to, fluctuations in market prices of metals, foreign currency exchange fluctuations, risks relating to exploration, including resource estimation and costs and timing of commercial production, requirements for additional financing, political and regulatory risks, and other risks described in Helio’s management discussions and analyses as filed on SEDAR. Accordingly, undue reliance should not be placed on forward-looking statements. All technical information contained within this presentation has been reviewed and approved for disclosure by Mr. C. MacKenzie, M.Sc., C.Geol, Helio’s COO and Qualified Person as designated by NI 43-101 slide 1

3 www.helioresource.com PROJECTS tsx-v:hrc slide 2 projects

4 STRATEGY AND FOCUS www.helioresource.com strategy and focus  Exploration for “World Class” gold deposits  Focus – Tanzania + Namibia  Political and economic stability  Under-explored regions  Excellent geological potential  Strong mining culture  Established legal code  Major mining companies active tsx-v:hrc slide 3

5 BOARD AND MANAGEMENT www.helioresource.com board and management MANAGEMENT / DIRECTORS / FOUNDERS Richard WilliamsCEO Chris MacKenzieCOO BOARD OF DIRECTORS Gren Thomas (Chairman) Founder of Aber Resources, Chairman of Strongbow Cliff Davis CEO of Nevsun Resources Stephen Leahy Chairman and CEO of North American Tungsten Corp. Colin JonesExec. VP Dundee Resources Ltd. tsx-v:hrc slide 4

6 www.helioresource.com CORPORATE INFORMATION corporate information  ListingTSX.V:HRC  Issued & Outstanding79,349,349  Management & Insiders~12.3% of I&O  Institutional Holdings~45% of I&O  Warrants13,053,610 @ $0.35-0.81 ~ $8,200,000 to Treasury 6,825,000 @ $0.60 (April 8, 2011) 478,610 @ $0.35 (April 8, 2011) 5,750,000 @ $0.81 (Feb 14, 2013)  Stock Options4,445,000  Fully Diluted96,847,959  Cash $3,000,000 no debt tsx-v:hrc slide 5

7 www.helioresource.com TANZANIA – SMP Gold Project tanzania – smp gold project tsx-v:hrc SMP Gold Project  Past mining district  Excellent infrastructure  Close to water source  Road accessible  Large land package  Power into property  No population pressure  Year-round exploration slide 6

8 www.helioresource.com LUPA GOLDFIELDS lupa goldfields Geology  Lupa Block located at triple junction of the Great Rift Valley  Major intrusive complex (gabbro / diorite / granite) - greenschist and lower amphibolite facies Arc – not Ubendian Mobile Belt  Main mineralised structures trend ENE and NW  Free gold occurs in mineralised zones up to 90m+ wide, with individual quartz veins up to 10m thick  New Re - Os date on mineralisation at SMP of ~1.93Ga tsx-v:hrc slide 7

9 www.helioresource.com SMP GOLD PROJECT smp gold project  750,000 ounces produced in Lupa Goldfields  New Saza Mine produced 270,000 ounces of gold @ 7.5g/t Au (1939 – 1956)  Project covers 5 licences / 23,800 hectares (238km 2 )  Option to earn 100% interest subject to royalty  Earn-in completed on 4 out of 5 licences  Control over 35km strike length of Saza Shear Zone tsx-v:hrc slide 8

10 www.helioresource.com SMP - HISTORIC GOLD MINES smp - historic gold mines  6 colonial-era gold mines  60km strike length of prospective auriferous structures tsx-v:hrc slide 9

11 www.helioresource.com SMP - PROSPECTS smp – prospects  Numerous Au occurrences and soil anomalies  Widespread historical and current artisanal mining activity tsx-v:hrc slide 10

12 SMP – DRILLING SUCCESS www.helioresource.com smp – drilling success Porcupine  52m @ 3.3 g/t Au  28m @ 5.1 g/t Au  53m @ 2.9 g/t Au Kenge Main  22m @ 7.0 g/t Au Kenge SE  22m @ 3.6 g/t Au Mbenge  48m @ 2.1 g/t Au Mbenge East  16m @ 3.8 g/t Au Snakebite  8m @ 20.8 g/t Au tsx-v:hrc slide 11

13 www.helioresource.com SMP TARGETS DRILL-TESTED smp targets drill-tested tsx-v:hrc  16 targets tested over a 20 km strike length (Mbenge and Snakebite now part of Kenge) slide 12

14 www.helioresource.com SMP – PORCUPINE DD SECTION smp – porcupine dd section tsx-v:hrc slide 13

15 www.helioresource.com SMP – PORCUPINE LONG SECTION smp – porcupine long section tsx-v:hrc slide 14

16 www.helioresource.com SMP – PORCUPINE NEW DRILLING smp – porcupine new drilling tsx-v:hrc slide 15

17 www.helioresource.com SMP – PORCUPINE NEW DRILLING smp – porcupine new drilling tsx-v:hrc slide 16

18 www.helioresource.com SMP – KENGE TARGET smp – kenge target  Numerous Au occurrences and soil anomalies  Widespread historical artisanal mining activity tsx-v:hrc slide 17

19 www.helioresource.com SMP – KENGE TARGET smp – kenge target tsx-v:hrc Slide 18

20 www.helioresource.com KENGE TARGET – RAZORBACK MINE kenge target – razorback mine tsx-v:hrc slide 19

21 www.helioresource.com METALLURGY metallurgy tsx-v:hrc PorcupineKenge Gravity Separation22.0%34.7% Whole Ore Flotation94.8%95.6% Gravity + Gravity Tailing Flotation93.4%95.6% Gravity + Flotation Concentrate Cyanidation91.9%93.3% Gravity + Gravity Tailing Cyanidation89.1%94.5% Whole Ore Cyanidation88.9%92.5% Heap Leach AmenabilityTBC70.0% Bond Ball Work Index15.715.0 Low Cyanide Consumption No “Preg Robbing” activity Non acid-generating tailings slide 20

22 www.helioresource.com SMP – NEW PROSPECTS smp – new prospects  Numerous Au occurrences and soil anomalies  Widespread historical artisanal mining activity tsx-v:hrc slide 21

23 www.helioresource.com SMP – TUMBILI TARGET smp – tumbili target tsx-v:hrc slide 22  RC drill programme to test all newly identified targets.

24 www.helioresource.com PROJECTS tsx-v:hrc slide 23 projects

25 www.helioresource.com NAMIBIA – DAMARA GOLD PROJECT namibia – damara gold project tsx-v:hrc slide 24 4 licences – 396,000 hectares

26 www.helioresource.com NAMIBIA – DAMARA GOLD PROJECT namibia – damara gold project tsx-v:hrc slide 25 Same geological terrain as AngloGold’s Navachab Mine

27 www.helioresource.com DGP – GOLD KOP DRILLING dgp – gold kop drilling tsx-v:hrc slide 26

28 www.helioresource.com DGP – WILHELMSTAL dgp – wilhelmstal tsx-v:hrc slide 27

29 www.helioresource.com PEER COMPARISONS peer comparisons tsx-v:hrc Slide 28 1

30 www.helioresource.com RECAP recap tsx-v:hrc slide 29  Tanzania + Namibia – countries with strong track record for investment and mine development  Tanzania - 4 th largest gold producer in Africa  Multiple drill targets in Tanzania and Namibia  Initial Resource Estimate by year end from the SMP Gold Project, Tanzania.  Excellent metallurgical results from the SMP Gold Project.

31 580 – 625 Howe Street, Vancouver B.C., V6C 2T6 Canada www.helioresource.com +1 604 638 8002


Download ppt "Tanzania and Namibia – Golden Opportunities. www.helioresource.com DISCLAIMER disclaimer tsx-v:hrc This presentation may contain forward-looking statements."

Similar presentations


Ads by Google