Update on Module Mounting on Staves and Stavelets 25/8/11 1.

Similar presentations


Presentation on theme: "Update on Module Mounting on Staves and Stavelets 25/8/11 1."— Presentation transcript:

1 Update on Module Mounting on Staves and Stavelets 25/8/11 1

2 2 Pipe clamps Stavelet clamps two flavours for US and UK stavelets lid All items electrically connected Stavelet test/shipping box. Two lengths, one for the stavelet with long pipes, 2 for standard length pipes Construction based around ‘ideal’ aluminium extrusion

3 Frame for light curtain support and overhead cable gantry 3 Overhead gantry is being constructed Awaiting material for frame. Expected WB 22/8/11 Simple bolt together system. Fits standard current table and granite up to 2.5m x 1.2m Prototype runners

4 4 Granite table (2.5m x 1.2m) Main access door

5 infrastructure 5 Work to reduce distance from stages Add rotating head for camera

6 Room Status New fire alarms installed. (but not yet in the electronic room) and not tested. Extra mains sockets installed. Lighting replaced. Awaiting replacement ceiling tiles. (done 23/8/11) Awaiting coupling for vacuum system and final connection into existing system. (done 23/8/11) Discussion about how to move the new granite into position has started with RAL heavy gang. Stages now on temporary table and being wired up. 6 Adhesive Se 4445 delivered 23/8/11 (but note DOM was June 2011) and it’s out of date in December 2011. Second batch ordered (with usual 8 /10 week delivery) as this is only made to order. On the question of Intertronics 2125.. No manufactures value for the thermal conductivity.