REMONDIS GmbH Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 The EU-Project RECOFUEL Part 1:Production of SBS ® Part 2:Use of SBS ® in.

Similar presentations


Presentation on theme: "REMONDIS GmbH Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 The EU-Project RECOFUEL Part 1:Production of SBS ® Part 2:Use of SBS ® in."— Presentation transcript:

1

2 REMONDIS GmbH Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 The EU-Project RECOFUEL Part 1:Production of SBS ® Part 2:Use of SBS ® in PC and CFB-plants

3 REMONDIS GmbH Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Part 1: Production of SBS ®

4 REMONDIS GmbH 3 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Brennstoff aus produktionsspezifischen Gewerbeabfällen BPG ® Source seperated wastes / production residues High calorific fractions (HCF) sorted out from poste-use waste SBS ® Substitutbrennstoff Two quality groups, two trade marks since 1995/1998

5 REMONDIS GmbH 4 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 paper wastes as BPG 1, plastics - resins - polyacrylic - polyester - polyolefine - PUR - etc. fibre fabrics carpets etc. BPG 2 cement kilns BPG 1 power plants residues from paper production rejects, punchings, photography paper, blocks, wet-strength paper, cellulose cloths etc. BPG 3 lime kilns low ash plastics - resins - polyacrylic - polyester - polyolefine - PUR - etc. SBS 1 power plants lignite different high-calorific fractions from -MSW -demolition wastes SBS 2 cement kilns hard coal see SBS 1 5 different qualities for different customers

6 REMONDIS GmbH 5 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Input materials for SBS ® SBS ® -production SBS ® construction and demolition wastes LFP-sorting mechanical-biological treatment plant bulky wastes commercial wastes composting high calorific fraction (HCF2) high calorific fraction (HCF3) high calorific fraction (HCF6) high calorific fraction (HCF1) high calorific fraction (HCF5) high calorific fraction (HCF4) Quality Assurance of HCF`s QA of SBS ®

7 REMONDIS GmbH 6 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Specifications for BPG ® and SBS ®

8 REMONDIS GmbH 7 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Waste treatment center VZEK, Erftstadt Flow-sheet (12/2005) MSW Bulky/Commer- cial waste New plant (ABA) feeding screening Fe-/ NF- seperation Fe-/ NF- seperation Fe-/ NF- metals biol. dryingresidues/ MSWI NIR- seperation water feedingbiomass SRF-plant (AKEA) Production wastes feeding size reduction Prior size reduction- windshifting disturbent materials Fe-seperation NF-seperation fine grinding SRF`s: BPG ® and SBS ® storage/ loading Fe-/ NF- metals HCF LFP-residues, production w. feedingNIR-seperationresidues

9 REMONDIS GmbH 8 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Feeding Acceleration conveyor Sorting residues Positive fraction Computer Near Infrared-System (NIR) Nozzles Nozzle Pipes Control System Positive fraction  SBS ® Sorting residues  MSWI Camera HCF-Sorting with NIR-systems positive separation

10 REMONDIS GmbH 9 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Development of input materials for SBS ® 1 E [weight %]

11 REMONDIS GmbH 10 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Extended QMS for the production of SBS ® Acceptance area Positive sorting of HCF SBS ® -Production Process-chain SBS ® -Storage QA-chain Input control Process control Product control: Internal and external ISO 9001  EFB  RAL-GZ 724  CEN TC 343 

12 REMONDIS GmbH 11 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Quality/product control Regular sampling during production Analysis of H 2 O in the plant Single samples are combined to 500-Mg-mixed-samples,.... Delivery to the customer Sampling behind last step of size reduction Every 1.500 Mg additional parameters are analysed: Analysis report – Number... 1.500-Mg-analysis for BPG  and SBS  Parameter: ds, H 2 O, Cl, Ash, NCV, F,... HM Group I-III: As, Be, Cd, Co, Cu, Hg, Mn, Mo, Ni, Pb, Sb, Se, Sn, Te, Tl, V, Zn Ash: Al 2 O 3, CaO, Fe 2 O 3, K 2 O, MgO, Na 2 O, P 2 O 5, SiO 2, SO 3, TiO 2, ZnO... and are analysed by an external laboratory : Analysis report – Number... 500-Mg-analysis for BPG  and SBS  Parameter: ds, H 2 O, Cl, Ash, NCV + 2 HM (changing monthly)

13 REMONDIS GmbH 12 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Development of SBS  1 Erftstadt -quality Short analysis and elementary analysis

14 REMONDIS GmbH 13 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Development of Cl-values of SBS ® since 1997 (n = 919, 10/2007) First trials with NIREffect of German landfill-directive

15 REMONDIS GmbH 14 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Development of parameters with slagging, fouling- or corrosion-potential for SBS ® 1 (08/2007)

16 REMONDIS GmbH 15 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Biogenic share of SBS ® 1 Erftstadt Results Dissolution method (prCEN/TS 15440)

17 REMONDIS GmbH 16 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 16 Energy specific CO 2 -emissions of different fuels t CO 2 /TJ BPG  2 Lignite Hard coal Heavy fuel oil Light fuel oil Natural gas SBS  1 CO 2 -reduction: 0,75 (HC) - 1 (BC) t CO 2 /SBS  (with 50% biomass content ) 40 50 60 70 80 90 100 110 120 30 realistic fossil share realistic fossil share

18 REMONDIS GmbH Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Part 2: Use of SBS ® in P ulverized C oal- and C irculating F luidized B ed-plants within the RECOFUEL-project

19 REMONDIS GmbH 18 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 term  duration36/48 month  startJune 2004 partner  consortium12 partner of 6 EU-states  coordinatorREMONDIS issues 1.sustainable production of SRF`s suitable for power plants 2.environmental acceptability and technological feasibility 3.accompanying research 4.european technology transfer EU-Project RECOFUEL Production of SRF (SBS ® ) and use in lignite boilers

20 REMONDIS GmbH 19 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Project RECOFUEL main issues of the partners REMONDISSRF-production + coordination RWE Powerlarge-scale demonstration co-combustion University Stuttgartlab tests + simulation INFAbalances of SRF-production KEMAash properties + corrosion TAUWquality control in the power plant CESIcorrosion Åbo Akademi Process SFR properties + ash University of Athenscombustion model VINCAmill measurements ESSENTtechnology transfer PPCtechnology transfer

21 REMONDIS GmbH Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 PC-plant of RWE Power in Weisweiler Source: RWE Power

22 REMONDIS GmbH 21 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 PC-plant of RWE Power in Weisweiler Feeding device for paper sludge (incl. 3 hoppers) Source: RWE Power

23 REMONDIS GmbH 22 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Co-combustion of SBS ® with lignite in Weisweiler SRF delivery hopper lignite supply 1200 Mg/h 8 coal mills electrostatic filter boilers with primary DENOX: 2 x 600 MW el cooling tower SBS-delivery: average 20-25 Mg/h maximum 50 Mg/h REA desulphorisation Fluff Source: RWE Power

24 REMONDIS GmbH 23 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Trials at Weisweiler PP in 2005 SBS ® 1:4200 Mg, 12,5 Mg/h (up to 4% thermal share) Paper sludge during SBS ® 1:ca. 13000 Mg Lignite during SBS ® 1:ca. 345 000 Mg Steam data:530°Cel., 169 bar Test and measurement plan: Input and output analysis of SBS ® 1 production Fuel input analysis at the power plant Analysis of the biogenic content Investigation of fuel preparation and mill behaviour Emission measurement in flue gas - Flue gas composition - HCl-measurement in the raw gas Furnace measurements O 2 - and temperature meas. before/after mill Analysis combustion residues First investigations of the corrosion potential Source: IVD, University Stuttgart

25 REMONDIS GmbH 24 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Direct co-combustion of SBS ® 1 in Weisweiler Source: RWE Power

26 REMONDIS GmbH 25 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 quality of SRF (SBS ® ) delivery and transfer feeding and dosing combustion behaviour (ignition and burnout) fixing of heavy metals etc. in ash and gypsum flue gas cleaning system emissions according 17. BImSchV (WID) landfilling characteristics of combustion residues Co-incineration of SBS ® in lignite power plants is technically and environmentally feasible Evaluation of SBS ® -co-incineration in Weisweiler Source: RWE Power

27 REMONDIS GmbH 26 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Extension of the project to a new power plant and a duration of 48 months  Motivation:  Missing longterm permission in PC-plant of Weisweiler  Existing feeding technology in CFB/CHP-plant Berrenrath  Existing longterm permission for SBS ® -use in Berrenrath  Consequences:  Additional administrative work (Consortium and EC)  Increased knowledge about corrosion risk with respect to two technologies  Use of the potential of lignite burning PC-power plants in West- Germany postphoned  Use of the potential of CFB-plants stabilized

28 REMONDIS GmbH 27 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Berrenrath Power Plant Source: RWE Power

29 REMONDIS GmbH 28 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Co-combustion installations of the Berrenrath Power Plant sewage sludge SBS ® 1 run-of-mine- lignite pulverized lignite coke (activated carbon) Source: RWE Power

30 REMONDIS GmbH 29 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 BERRENRATH CFB (ca. 300 MW therm ) Steam data : 77.8 kg/s 510 ºC 90 bar Fuels : Lignite Sewage sludge Lignite sludge Demolition wood SRF (up to 25% thermal share) SUPERHEATER 4 SUPERHEATER 3 SUPERHEATER 2 ECONOMIZER AIR PREHEATER CFB boiler (CHP) in Berrenrath Source: RWE Power

31 REMONDIS GmbH 30 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Summary part 1-2  NIR-technology is the key to select suitable high calorific fractions from MSW, bulky waste and mixed commercial wastes  NIR-technology in development (improvements of selectivity)  Modern treatment-technology is the basis for good chemical und physical fuels properties  QMS according RAL-GZ 724/CEN TC 343 can improve the reliability of fuel properties  Improved SBS ® 1-qualities even after effectiveness of landfill directive  Very low Cl-values (mean of 3 assays < 0,5% of d.s., max < 0,7% of d.s.) requested by RWE Power  New location for longterm-tests: CHP-plant in Berrenrath (CFB-techn.)  Interesting CO 2 -reduction potential: 1t CO 2 /t SBS ® 1

32 REMONDIS GmbH 31 Dr.-Ing. Th. Glorius, QUOVADIS-Workshop, Rome, 23.-25.10.2007 Acknowledgment The RECOFUEL-project is funded by the European Commission under the Sixth Framework Programme European Commission Directorate-General for Energy and Transport and Intelligent Energy Europe Thank you!