Avoided Cost Calculator Workshop Day 2 October 4, 2005 Energy and Environmental Economics, Inc.

Similar presentations


Presentation on theme: "Avoided Cost Calculator Workshop Day 2 October 4, 2005 Energy and Environmental Economics, Inc."— Presentation transcript:

1 Avoided Cost Calculator Workshop Day 2 October 4, 2005 Energy and Environmental Economics, Inc.

2 Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance DEER lighting error coprrection (SDG&E only) SCE motor summer peak kW correction Allocation of gas program savings between years Revision to accommodate decimal EULs. Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data Other ideas?

3 Counting Issues What is the question?  Energy Savings for a Year How much reduction did I see this year? (what did I harvest?) How much reduction will I see because of what I did this year? (how much did I plant?)  Peak reductions How much reduction at a certain point in time (e.g., for procurement) How much reduction implemented (to gauge progress toward long term goals)

4 Counting Issues How do I treat measures with short lives?  Assume I install a widget that lasts one year, and I repeat this every year for 2006 through 2008. Assume this widget gets me 1kW. Do I claim 3kW of installed devices? I did put in three 1kW devices. Do I claim 1kW, since I only saw 1kW of load reduction due to that widget in any year? How do I count committed versus realized measures?

5 Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance Correct DEER lighting error (SDG&E only) SCE correction of summer peak kW application for motor Allocation of gas program savings between years Accommodate decimal EULs. Size reduction Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data

6 Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance DEER lighting error coprrection (SDG&E only) SCE motor summer peak kW correction Allocation of gas program savings between years Revision to accommodate decimal EULs. Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data Other ideas?

7 Consistent across IOUs

8 Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance DEER lighting error coprrection (SDG&E only) SCE motor summer peak kW correction Allocation of gas program savings between years Revision to accommodate decimal EULs. Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data Other ideas?

9 Longer Term Items Recap of Draft Report Recommendation Requirements (Feb 20, 2006 draft report)  The definition of peak demand reductions Common definition Agreed upon calculation  Refinements to avoided cost methodology and tie in with other proceedings  Consistency in underlying load shape data and the methods by which that data is translated into peak savings estimate  Display of load shapes

10 Longer Term Items continued Cross walk to other proceedings such as resource adequacy and procurement Availability and sufficiency of load data going forward Acquisition and allowance for new load shapes EUL updates Size reduction

11 Update on DR methodology work


Download ppt "Avoided Cost Calculator Workshop Day 2 October 4, 2005 Energy and Environmental Economics, Inc."