1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.

Similar presentations


Presentation on theme: "1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013."— Presentation transcript:

1 1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013

2 Creating a new Irish Water Industry Presentation Title Michael Quinn Change Manager CCMA Water Services Transition Office

3  LA concerns  How are these being addressed  Changes for LA Water Services  Preparation for Day 1  Opportunities Service Level Agreement LA Perspective

4  Full Cost Recovery  LA can’t afford to subsidise Water Services  Ensure that all costs incurred are recovered from IW  Loss of efficiency in support services as a result of activities migrating to IW  Limited Resources available for Water Services  23% reduction in LA staff over the past four years  Under resourcing of some LA activities  No capacity in LAs to take on additional work  Further loss of resources as key staff move to IW LA Concerns

5  Capacity of LAs to implement the scale of change  Many other demands on LAs including  Introduction of Shared Services  Putting People First  Restrictions on replacing staff  Alignment with the Forward Planning process  IW’s capital program should align with the needs of  National Spatial Strategy  Regional Planning Guidelines  County and Local Development Plans  Loss of control over infrastructure investment to facilitate economic development LA Concerns

6  The Annual Service Plan will identify  All staff involved in the provision of Water Services  Activities which are not being done or where they are being done below the standard required  Additional activities required by Irish Water  Infrastructural performances issues  Headcount and budget impact of new initiatives  Definition in the SLA of all Reasonable Incurred Inputs  The SLA has a dispute resolution process How are these being Addressed

7  Change Management Proposal  Pilot Impact Assessment in 8 LAs  Joint IW/LA Program Management structure  Local Steering Committee in each LA  Change Management Team with 4 full-time resources  IW will fund 2 resources under the SLA to support the change management process until 2017  IW will also provide a change manager and a LA secondee until March 2014 How are these being Addressed

8  Memorandum of Understanding (MoUs) to be developed on Forward Planning  MoUs will also be developed to cover  Flood Management  River Basin District Management  Major Emergency Management  Submission made to the DECLG to include the alignment of IWs Capital Plan with the Forward Planning Process in the Water Services Legislation How are these being Addressed

9 Changes to Expect on Day 1  EPA and HSE will liaise with IW as the Water Utility  EPA reporting to be done through IW  All incidents will be reported to IW  Changes in responsibility for H&S  Caretaking, network maintenance and leak repair to continue as normal  Media management will be the responsibility of IW  LAs will have to invoice IW for the costs of providing services  IW will be responsible for managing the Capital Program  Budget management will be with IW not within the LA

10 Changes to Expect on Day 1 It is proposed that  All customer contact will be through the IW Call Centre  LAs will use Maximo to receive and resolve customer issues  Procurement of a number of Product Categories will be through IW’s System. These include  Chemicals  Energy  Sludge Management  Plant Hire  Pipes & Civil Works  LAs will process Non Domestic meter readings and IW will issues the Bill

11 Preparation for Day 1  Protocols have been developed by LAs and IW  An impact Assessment of the protocols with 8 LAs  Document the level of impact on staff in LAs  Scope the level of resources required to implement the changes required  Develop an implementation plan for LAs for 1/1/14  Training requirements and schedules  System roll-out plan  Communications plan  Support documentation

12 Preparation for Day 1  Align the LA cost structure to Water Supply Zone and Agglomeration  Work related to transfer of assets and liabilities  Preparation of Annual Service Plan and Budget  Valuation of rateable water services assets  The scale of change must match the capacity LAs to implement the changes

13  Service Performance Improvements  Workflow Management system  Customer Contact Management System  Improvements in GIS and Network Management Systems  Targeted funding of infrastructure improvements  Shared Services opportunities  GIS  Laboratories  Training Centres  Procurement Opportunities


Download ppt "1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013."