Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fall 2002 Internet2 Member Meeting Remote Instrumentation WG T. Charles Yun Program Manager October 2002.

Similar presentations


Presentation on theme: "Fall 2002 Internet2 Member Meeting Remote Instrumentation WG T. Charles Yun Program Manager October 2002."— Presentation transcript:

1 Fall 2002 Internet2 Member Meeting Remote Instrumentation WG T. Charles Yun Program Manager October 2002

2 Internet 2 Remoe Instrumentation Working Group Slide 2 Outline Cross Disciplinary Remote Instrumentation Working Group Introduction Internet2 T. Charles Yun Last Year’s BOF Session WG Charter Initial Tasks Introduce speakers Introduction

3 October 2002Internet 2 Remoe Instrumentation Working Group Slide 3 Summary of past work BOF session in Arlington earlier this year Introduced concept of full working group and need for charter. Copies of draft of WG Charter available as handouts or online: http://www.internet2.edu/remote Introduction

4 October 2002Internet 2 Remoe Instrumentation Working Group Slide 4 Working Group Charter (1/2) Introduction Numerous communities and research fields are using remote instruments to assist their work as advanced networks allow much more sophisticated devices to be used. Groups are separately learning to use and optimize these instruments but, to date, have not effectively shared their experience and knowledge. The Cross- Disciplinary Remote Instrumentation Working Group's primary goal is to provide a forum through which these discussions can take place. Mission The proposed mission of the Remote Instrumentation Working Group is to: 1. Establish a community who create and use remote instruments. 2. Provide a forum through which knowledge can be shared. 3. Identify areas in which the community at large can benefit from shared work. Introduction

5 October 2002Internet 2 Remoe Instrumentation Working Group Slide 5 Working Group Charter (2/2) Goals- Technical - Survey and document existing remote instrument usage. Document locations, existing connectivity, type of equipment, usage, lessons learned, accessibility, etc. -Document lessons learned, hardware, cooperative vendors (hardware and software), etc. -Identify performance parameters and metrics (e.g., TCP/IP, E2E, latency wrt specific instruments, etc.) Goals- Community -Create opportunities through which researchers can discuss relevant topics -Document how remote instruments are currently being used. -Define "remote instrumentation" and sub-fields as useful to the working group. -How are instruments shared Introduction

6 October 2002Internet 2 Remoe Instrumentation Working Group Slide 6 First Steps Loose organization Approve charter Please consider items to add to the charter for the next meeting Identify activities and working group chair Agree to meet at the next Member Meeting Additional information: http://www.internet2.edu/remote/ remote@internet2.edu Introduction

7 October 2002Internet 2 Remoe Instrumentation Working Group Slide 7 Speakers Erik Hofer University of Michigan Social Ramifications Bob Bradford NASA Marshall Space Flight Center ISS Instrumentation Dan Wilson University of California, Davis NEES & Centrifuges Introduction

8 October 2002Internet 2 Remoe Instrumentation Working Group Slide 8 Activities for Next Meting Individuals interested in investigating social ramifications Ask Erik Hofer to lead discussions on mailing list List types of remote instruments that are currently being used Instruments Tools Identify challenges faced by community Large data volumes Target /requirements for throughput, latency, loss, environmentals What remote instruments can be used by the K-12 community Introduction

9 October 2002Internet 2 Remoe Instrumentation Working Group Slide 9 Last Items Attendee list Indicate if you want to be added to the remote instrumentation mailing list

10 October 2002Internet 2 Remoe Instrumentation Working Group Slide 10 www.internet2.edu

11 October 2002Internet 2 Remoe Instrumentation Working Group Slide 11


Download ppt "Fall 2002 Internet2 Member Meeting Remote Instrumentation WG T. Charles Yun Program Manager October 2002."

Similar presentations


Ads by Google