Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mod.EEM Modular Energy Efficiency Model Step-by-step implementation of energy management systems in enterprises EnergieAgentur.NRW, Dipl.-Ing. Gerald Orlik.

Similar presentations


Presentation on theme: "Mod.EEM Modular Energy Efficiency Model Step-by-step implementation of energy management systems in enterprises EnergieAgentur.NRW, Dipl.-Ing. Gerald Orlik."— Presentation transcript:

1 mod.EEM Modular Energy Efficiency Model Step-by-step implementation of energy management systems in enterprises EnergieAgentur.NRW, Dipl.-Ing. Gerald Orlik

2 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 2 Project Background Latest developments mod.EEM

3 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 3 E nergy Concept of the German Government Decision adopted by the Federal Government on 28 September 2010 The programmes subtopic entitled Energy efficiency as the key factor focusses on utilising the industrys efficiency potential (see p. 12): The European Commission has approved relief from the eco-tax for German industry up to 31 December 2012. The relevant Directive requires that companies receiving tax relief – such as the energy tax rebate – contribute something appropriate in return. From 2013 the German government will continue to grant eco-tax relief to energy-intensive companies – which is to be adopted as part of the Budget Support Act – only if companies contribute towards energy savings. Proof of savings can be provided through certified logging in energy management systems or through other equivalent measures. With regard to other tax relief, the German government will consider which measures can satisfy the requirements of the Directive in terms of appropriate action by companies in return. In future, this requirement is to be linked to the operation of energy management systems in accordance with international standards (EN 16001, ISO 50001). This will flag up relevant efficiency potential so that it can then be exploited. This is a low-cost approach which above all does not place undue strain on small and medium-sized businesses while nevertheless systematically exposing opportunities for improvement.

4 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 4 Requirements DIN EN 16001:2009 / ISO 50001 These norms describe requirements applicable to an energy management system (EnMS) that enables a company to continuously improve its energy performance by adopting a systematic approach to energy management and at the same time to meet legal requirements and other obligations. Incorporating experience from EMAS, ISO 14001, ISO 9001 as well as from emissions trading. Background

5 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 5 Project Introduction mod.EEM

6 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 6 mod.EEM – Pilot project for the step-by-step implementation of EnMS in enterprises Initiative by the Federal Ministry for the Environment, the MKULNV NRW and the EnergieAgentur.NRW The Mod.EEM has been designed as a pilot project for 100 companies from North-Rhine Westphalia for a period of three years with the objective to apply the system throughout Germany. The Mod.EEM creates prerequisites for introducing an EnMS in a step-by- step approach thus granting eligibility for future electricity and energy tax relief. Depending on potentially existing systems, the structure of the Mod.EEM is based on DIN EN 16001: Energy Management Systems in Practice – A Guide for Companies and Organisations / ISO 50001.

7 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 7 mod.EEM – Project organisation Federal Ministry for the Environment Client EnergieAgentur.NRW GmbH Project management Hochhardt & Partner Companies participating in the project Companies participating in the project TÜV Rheinland Cert DIHK Fraunhofer ISI VDI TÜV Rheinland Cert DIHK Fraunhofer ISI VDI Collaboration Software development MKULNV.NRW Dr. Glatzner Project consulting econius GmbH Energy-measurements 100 in NRW Energy providers Engineering agencies Energy providers Engineering agencies Others involved Partners

8 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 8 In addition to a status analysis, the Basic package comprises a comprehensive inventory of a companys energy flows together with a systematic documentation of results and action plans. The Advanced package has been designed to implement the results of the basic package in a structured way. Essential building blocks of this package comprise Part I including guidelines on implementation and operation, and Part II including an assessment of the EnMS performance. The Consolidation package provides elements for setting up a continuous improvement process to ensure that the EMS is suitable, appropriate and efficient. This package aims at certifying the EMS according to DIN EN 16001 / ISO 50001. Set-up of the mod.EEM

9 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 9 Project Structure mod.EEM

10 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 10 Management system check/comparison (DIN EN 16001 / ISO 50001 requirement) Management system check/comparison (DIN EN 16001 / ISO 50001 requirement) mod.EEM – Check Company data Basic energy data (questionnaire) Basic energy data (questionnaire) Benchmarking (parameters) Benchmarking (parameters) Climate protection (CO 2 emissions) Climate protection (CO 2 emissions) Trend analysis (Basis: 3 year energy data) Trend analysis (Basis: 3 year energy data) Web-based Energy tax status STATUS report Basic energy consumption (status analysis) Basic energy consumption (status analysis)

11 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 11 Objectives Action plans Objectives Action plans Mod.EEM web application Tools Documentation of Basic package Calculation tools Information / form archive, e.g. energy data registration, tips for saving energy, energy policy, statutory framework conditions mod.EEM Chart – Basic package Energy management light mod.EEM check EnergieAgentur.NRW Status meeting mod.EEM check EnergieAgentur.NRW Status meeting Analys. of energy usage Analys. of en. consump. Analysis of en. savings Analys. of energy usage Analys. of en. consump. Analysis of en. savings Baseline Energy perf. parameters (EnPIs) Energy perf. parameters (EnPIs) KfW energy consulting / independ. energy consulting KfW energy consulting / independ. energy consulting Company decision Balance limits Energy policy Energy manager Environmental legislation Company decision Balance limits Energy policy Energy manager Environmental legislation * Focus: Energy controlling Energy flow chart (e-sankey) Energy flow chart (e-sankey) * EnergieAgentur.NRW will perform this step during the pilot phase. Afterwards it may be performed in-house or externally, e.g. by external energy consultants. Requirement by the Federal Office of Economics and Export Control Measuring technology

12 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 12 mod.EEM chart – Advanced package I Focus: Implementation and operation Implementation and operation of the energy management system Implementation and operation of the energy management system Training, raising awareness Documentation Implementation management Communication Set-up Procurement mod.EEM web application Tools Documentation of advanced package I Calculation tools Information / form archive e.g. model process instructions Mission E by EA.NRW optional Moderation Project support EnergieAgentur.NRW

13 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 13 mod.EEM chart – Advanced package II Focus: Performance assessment Assessing the performance of the energy management system Assessing the performance of the energy management system Monitoring Measuring Analysis Monitoring Measuring Analysis Compliance assessment Internal audit Corrective action Steering of records mod.EEM web application Tools Documentation of advanced package II Calculation tools Information / form archive e.g. model documents/protocols Determining the target path Determining the target path Devising an efficiency factor Devising an efficiency factor Target agreement Voluntary target agreement optional Moderation Project support EnergieAgentur.NRW

14 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 14 mod.EEM chart – Consolidation package Input parameters Focus: Continuous improvement Assessing the energy management system Assessing the energy management system Outcomes Results of the management reviews Results of the management reviews Energy efficiency Change of Energy policy Energy efficiency parameters Strategic goals Operative targets Provision of raw material Energy efficiency Considering (e.g.) Energy policy Legal requirements Corrective measures Recommendations Results of audits Certification DIN EN 16001 / ISO 50001 Certification DIN EN 16001 / ISO 50001 Moderation, project support EnergieAgentur.NRW

15 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 15 Introducing energy management systems Continuous improvement as the EnMS driving force Act Management assessment (incl. discussion of data and results) Making decisions to: - improve organisation and communication - set up new objectives and implement new measures Plan Energy strategy (policy) of the management Management programme and energy saving targets (based on data and cost analyses) Do Energy organisation (Officer, management representative, energy team) Regular communication among all parties involved, Documentation Tracking objectives and activities Check internal (energy) audits - visits/inspections, - data, facts, documents - talks with staff members (if required, external assessment and further recommendations)

16 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 16 Business overview Structural data mod.EEM

17 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 17 Classification of companies according to sectors As of Jan. 25, 2011 Currenctly participating businesses: 67, statistically evaluated: 63 Statistics may deviate from this number since the companies processing status differs.

18 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 18 Classification of companies based on number of employees As of Jan. 25,.2011 Currently participating businesses: 67, statistically evaluated: 55 Statistics may deviate from this number since the companies processing status differs.

19 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 19 Classification of companies acc. to consumption of electricity and natural gas As of Jan. 25,.2011 Currenctly participating businesses: 67, statistically evaluated: 32/38 Statistics may deviate from this number since the companies processing status differs.

20 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 20 Classification of companies according to current certification As of Jan. 25, 2011 Currenctly participating businesses: 67, multiple answers possible. Statistics may deviate from this number since the companies processing status differs.

21 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 21 Classification of companies according to current management system check/comparison As of Jan. 25, 2011 Currenctly participating businesses: 67, statistically evaluated: 61 Statistics may deviate from this number since the companies processing status differs.

22 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 22 Participating companies Distribution throughout North-Rhine Westphalia

23 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 23 Public Relations Examples mod.EEM

24 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 24 mod.EEM Public Relations Examples Workshops Events organised by EnergieAgentur.NRW Events organised by cooperation partners Publications in specialised publications Internet Participating in the NA 172-00-09 AA working committee Working group on energy management and energy efficiency

25 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 25 Energy Concept Tailor-made options – mod.EEM mod.EEM

26 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 26 The German governments Energy Concept Modular concept – mod.EEM Excerpt / links to the energy concept …certified logging in energy management systems or through other equivalent measures …the German government will consider which measures can be linked to (EN 16001, ISO 50001)… DIN EN 16001 ISO 50001 mod.EEM LIGHT mod.EEM EASY Target group: Small enterprises ADVANCED Package I ADVANCED Package I Target group: medium-sized to large enterprises BASIC Package BASIC Package ADVANCED Package II ADVANCED Package II Consolidation Package Consolidation Package Target group: All enterprises

27 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 27 Declaration of Conformity TÜV Rheinland Cert mod.EEM

28 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 28 Conformity DIN EN 16001 / ISO 50001 Certifying conformity (declaration of conformity) of the MOD.EEM with regard to all elements of DIN EN 16001 by TÜV Rheinland Cert Certifying conformity (declaration of conformity) as regards Federal Office of Economics and Export Control (BAFA) requirements (EEC) Objective: Providing security for all participating companies in terms of conformity

29 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 29 Option for small enterprises mod.EEM EASY mod.EEM

30 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 30 mod.EEM easy Option for small businesses Source: Source: European Commission Objectives and responsibilities Developing a creative tool Using mapping methods Objective: to be certified according to ISO 50001 (TÜV Rheinland Cert – Declaration of conformity) Visual, simple, easy-to-use and free tools Target group: small enterprises

31 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 31 Comparing Potentials Efficiency factor method mod.EEM

32 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 32 Potential Assessment Efficiency factor method Setting up company-specific objectives based on the initial situation in terms of energy efficiency Setting action-oriented targets within action categories (e.g. production technology, building shell, behaviour) The factor method considers energy efficiency and CO 2 intensitiy A companys energy efficiency becomes evident by comparing improved energy efficiency as a result of implemented measures to the situation without special action. Objective from a business perspective: fair assessment of future potentials by taking into account the existing efficiency standard

33 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 33 Next steps Objectives, methods and results mod.EEM

34 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 34 Next steps – Outlook until 2012 Objectives, methods and results Next steps and key issues: publishing a standard version for Germany in 2011 improving the standard version according to plan by 2012 developing an easy option for small enterprises getting missing companies on board regular exchange of experience with the LEEN project exploring opportunities for application throughout Europe creating interfaces (automatic reporting system) to processes based on the energy concept (main customs office, Federal Office of Economics and Export Control)

35 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 35 EnergieAgentur.NRW Kasinostraße 19 - 21 D-42103 Wuppertal/Germany Project manager Dipl.-Ing. Gerd Marx Phone: ++49 (0) 202 / 24 55 2 35 marx@energieagentur.nrw.de Deputy project manager, Project coordinator Dipl.-Ing. Gerald Orlik Phone: ++49 (0) 202 / 24 55 2 33 orlik@energieagentur.nrw.de EnergieAgentur.NRW Haroldstr. 4 D-40123 Düsseldorf/Germany Project coordinator Dipl.-Ing. Thomas Gentzow Phone: ++49 (0) 211/86642 - 295 gentzow@energieagentur.nrw.de

36 MOD.EEM Modulares EnergieEffizienzModell Fassung vom 21. Januar 2011 Folie 36 the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety and the Ministry of Climate Protection, Environment, Agriculture, Nature Conservation and Consumer Protection of the German Federal State of North-Rhine Westphalia mod.EEM Modular Energy Efficiency Model Gradual implementation of energy management systems in businesses On behalf of...


Download ppt "Mod.EEM Modular Energy Efficiency Model Step-by-step implementation of energy management systems in enterprises EnergieAgentur.NRW, Dipl.-Ing. Gerald Orlik."

Similar presentations


Ads by Google