Final Year Dominic Maina Mechanical Engineering Student
2
Resulting on more vehicles on our infrastructures As of 2012, the Australian motor vehicle fleet had 16.7 million registered vehicles compared to 14.8 million in 2007 - increase of 13.3% - passenger vehicles 11,462 400 – 12,714 235 increase of 10.9% - Motor cycles 511,966 – 709 288 increase of 38.5% Vehicles are becoming more affordable and readily accessible compared to 10years ago. According to the Bureau of Statistics website
3
Don’t you hate it, when you find this and the fuel light is showing ? Traffic on the Southern Expressway. Picture: Simon Cross Source: The Advertiser
4
There is a new technology being implemented in hybrid cars to help you relax a bit, to get to the petrol station There is a new technology being implemented in hybrid cars to help you relax a bit, to get to the petrol station
5
“Development of a Fuel Saving Start and Stop System for two wheelers” Project Title ;
6
Why for two wheelers, you may be asking? Three main reasons Don't always have room They use Petrol Produce CO 2
7
How is it going to work Switch Speed sensor ECU (microcontroller) Throttle sensor - Position sensor - Gyroscope Sensors
8
Speed sensor ECU Mode Activation Switch Throttle sensor Engine Start Engine Stop Key Position
9
Drawbacks Budget of $200 Not having an electric start Being manual Not being roadworthy
10
What have I been doing so far Ownership Survey Solutions
11
What do I aim to achieve Develop the Start & Stop System Save fuel
12
How do I plan on doing this Project Planning. Type of bike Project Definition. Aims to achieve Conceptual Design. To find what works best with what Product Development. Putting my designs into practice Testing. Measuring fuel before and after
13
Durations TaskStart Duration (Days) End Project Planning 25-Feb ( S1 W1) 20 16-Mar (S1 W2) Project Definition 16-Mar (S1 W2) 48 3-May (S1 W7) Conceptual Design 22-Apr (Mid-Break) 88 19-Jul (S1 W14) Product Development 19-Jul (S1 W14) 77 4-Oct (S2 W9) Testing 4-Oct (S2 W9) 35 8-Nov (S2 W13)
14
Any Questions?