Presentation is loading. Please wait.

RedStone Highlights For Website 7/20/2015. RedStone Highlights Drag Conveyor drive sprocket Usually have to change out the sprocket & chain every 6 months.

Similar presentations


Presentation on theme: "RedStone Highlights For Website 7/20/2015. RedStone Highlights Drag Conveyor drive sprocket Usually have to change out the sprocket & chain every 6 months."— Presentation transcript:

1 RedStone Highlights For Website 7/20/2015

2 RedStone Highlights Drag Conveyor drive sprocket Usually have to change out the sprocket & chain every 6 months. $15K expense. Customer believes they will get 2 years out of it now. Traverse Conveyor

3 Batched Gates

4 RedStone Key Points: 64 bearings & 2 Chains 140 feet up Hard to reach bearings are now being greased properly Safety System never takes a day off Proper amount of grease overtime

5 RedStone Pump & Controller Giving each bearing the right amount of grease overtime Grease drum will last months

6 RedStone Silo #2 Clean system layout Injectors can be adjusted Injectors show a lube event has taken place

7 RedStone Grease ring is perfect. Bearing is protected from outside elements System can easily move with machine