Presentation is loading. Please wait.

Presentation is loading. Please wait.

HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk (CERN) 29 th September 2009.

Similar presentations


Presentation on theme: "HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk (CERN) 29 th September 2009."— Presentation transcript:

1 HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk (CERN) 29 th September 2009

2 HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Committees: steering committee changes Gijs de RijkCERN Francois KircherCEA-Irfu Pascal TixadorCNRS Grenoble * Simona BertaCOLUMBUS (to be replaced)DESY (stepped out) Andre AubeleBHTS Mathias NoeFZK Giovanni VolpiniINFN-LASA Maciej ChorowskiPWR Yifeng YangUniv. Southampton Jim ClarkeSTFC-DL Antti StenvalTU Tampere Rene FlukigerUniv. Geneve 2

3 HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Committees: ESAC External Scientific Advisory Committee will be finalized when Francois and me can meet the candidates: MT21 Proposed names: Akira Yamamoto (ok) Arup Ghosh (tbc) Shlomo Caspi (tbc) Giorgio Ambrosio (tbc) Lucio Rossi (ok) yukikazu Iwasa (ok) Pasquale Fabbricatore (tbc) 3

4 HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Reporting The 6 – monthly activity report: Sequence of events: Task leader reports: 10 October (10 days after the end of the semester)  Work Package leader Work Package leader report: 20 October (20 days after the end of the semester)  Project Coordinator 4

5 HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Instructions were send by Svet to the TLs Deadline for WP7 is 7 Oct at 9h00 (meeting between Francois and me at CEA to put the report together) 5


Download ppt "HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk (CERN) 29 th September 2009."

Similar presentations


Ads by Google