Presentation is loading. Please wait.

Presentation is loading. Please wait.

Network Technology Area Network (APAN) 19 th APAN – Bangkok, Thailand January 2005 By Assoc. Prof. Dr. Sureswaran Ramadass.

Similar presentations


Presentation on theme: "Network Technology Area Network (APAN) 19 th APAN – Bangkok, Thailand January 2005 By Assoc. Prof. Dr. Sureswaran Ramadass."— Presentation transcript:

1 Network Technology Area Network (APAN) 19 th APAN – Bangkok, Thailand January 2005 By Assoc. Prof. Dr. Sureswaran Ramadass

2 Network Technology Area Meeting Minutes : 1. New proposed WG guidelines 2. Working Group update 1.Satellite (Lim Seow San/TP) 2.Measurement (Yasuichi Kitamura/CRL) 3.Multimedia (Omar A. Abouabdalla/USM) 4.IPv6 (Yan Ma/BUPT) 5.Security Bof (Rahmat Budiarto/USM) 6.SIP Bof (Stephen Kingham/AARNET) 7.Lamda Bof (Jysoo Lee/KISTI & Akira Kato/JAIRC) 3. Action Plan / Milestones / Terms

3 Working Groups update 1.Satellite (Lim Seow San/TP) To propose to let AI3 handle this WG. 2.Measurement (Yasuichi Kitamura/CRL) BoF (January 25th, 1300-1400) Session (January 27th, 1600-1730) Issues : Chair (remains with Kitamura) Collaboration with Internet2 Relationship between this wg and noc -> Engineering is better? 3. Multimedia (Omar A. Abouabdalla/USM) Issue on the technology area – to move to application To create new BoF called Collaborative tools. Remote Presentation by speaker on new file transfer protocol Encourage more active participations from other countries

4 4. Security BoF Bangkok Meeting 2005.01.26 (12.00 noon – 1.00 pm) Minutes: 1.Presentations from Larry Yang Liu, and Usman Sarwar 2.Discussion on Internet Worm Detection and Defense 3.Discussion on the draft charter by making the changes on the activities and milestones charter 4.Proposal on Working group formation - Participants agreed on establishing APAN Security Working Group 5.Discussion on implementation of future plan Participants: 25+ Committee members : Chair: Rahmat Budiarto/ NRG – USM Deputy Chairs: Yoonjoo Kwon / KISTI - KR Nittida Nuansri / UNINet -TH Secretary: Larry Yang Liu/ CNCERT/CC - CN

5 Milestones/ Actions Meeting, Busan APAN Meeting ( 2003.7) Working group’s mailing list (2003.10) Working group’s website (2003.10) Workshop & Meeting, Honolulu APAN Meeting (2004.1.29) Meeting, Bangkok APAN Meeting (2005.1) Draft of Security Policy of APAN network (on Routers and Servers) 2005.5 Tutotial & Meeting, Taipei APAN Meeting (2005.8) Implement distributed IDS in the APAN network 2005.11 Draft of the Working Group Charter (2005.01) Plan 1 Day Tutorial on Defense and detection strategies against internet worms (2005.8 – APAN Meeting, Taipei) Collaborate with US-CSIRT, TF-CSIRT (Europe) and APCERT in workshops/tutorials Implementation of a security system in APAN network (2005.11) Distributed DDS/IDS (need resources support from NOC) Anti SPAM, viruses/worms Inetmon (Donation from iNetmon Company MY) Security Policies for APAN servers (support from APAN Sec.)(2005.05) Joint meeting with NOC working group, and IPv6 Task force (2005.8) 4. Security BoF Bangkok Meeting 2005.01.26 (12.00 noon – 1.00 pm)

6 5. SIP - H323 WG Email list established. Assist SIP Development in APAN (achieved and continuing): –Tutorials are very popular –Web Page. Done 2004, needs more. Co-ordinate SIP Peering due July 2005. See proposed projects. Assist migration from H.323 to SIP –Tutorial on H.323 Gatekeeper –Gateway between H.323 and SIP discussed, dialplan needs work. –Guidelines. Due Jul 2005 Co-ordinate Services (MCU and Gateways to PSTN), due July 2005. Promote QoS between APAN Members. Formalise requirements and liaise with NOC. Progress On Goal

7 Proposed Projects : 1.SIP Peering between APAN 2.SIP IP Telephone systems for APAN Management 3.Propose SIP-H323 Working Group be accepted as a Working Group at Bangkok APAN Meeting. Chair: Stephen Kingham, Co-chair: Quincy Wu Secretary: Ruston Hutchens Key Members: Singapore, Australia, Taiwan, Sri Lanka, Malaysia. 5. SIP - H323 WG

8 Working Groups update 4.IPv6 (Yan Ma/BUPT) A B C D 5.Lamda Bof (Jysoo Lee/KISTI & Akira Kato/JAIRC) - 3 Presentations. - Stay as BoF

9 2. Action Plan / Milestone / Terms Required and proposed from APAN NOC one technical staff to be allocated (update presentations, monitor milestones) Possible joint research work / projects 3. Area of Collaborations Collaborate with NOC WG (conducting tutorial / workshop) / Application group 4. New Proposed WG guidelines Proposed to set up standard time line for every proposed projects Monitor the proposed projects


Download ppt "Network Technology Area Network (APAN) 19 th APAN – Bangkok, Thailand January 2005 By Assoc. Prof. Dr. Sureswaran Ramadass."

Similar presentations


Ads by Google