Proposed Demolition Processing Pilot Project. Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed.

Similar presentations


Presentation on theme: "Proposed Demolition Processing Pilot Project. Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed."— Presentation transcript:

1 Proposed Demolition Processing Pilot Project

2

3 Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed 2006 to Present All Concrete, Brick and Blacktop processed as aggregate 2006 - Present Shingles Re-use 2007 – 2011 NMR Pilot Project 4 weeks - 2008

4 Waste Categories Wood – shipped to Minnesota Power – Biomass Metal – marketed by contractor Aggregates – separated, crushed marketed/utilized locally Shingles – separated, processed work with Public works and MNDOT Cardboard – marketed through recycling center Residuals – landfilled at RLF, General Waste and Waste Management

5

6

7

8 Project Location

9

10 Recommendation Request SWSC approval Request Board approval Proceed with 3 Month Pilot Project Evaluate numbers/success weekly Continue for additional 3 months based on numbers Review Contractor Report Get MPCA permit modification/approval Draft Request for Bids after 6 month project for long term program development.