1 CEDAR Support Structure Peter Sutcliffe 24 th January 2011

2 Proposed CEDAR Concept Design Existing PMT Head Insulation (all yellow parts) New Detector Support Detector Frame Cooling and Electronics Light Guide Mirror N2 Environmental Casing Existing 1251mm (to be shortened) PMTs

3 Light Guide Assembly Update RF Screening

4 Details of Concept

5 PMT and Cooling assembly

6 Light Guide

7 Non Overlapping Light Guide 18mm PMT Pitch

8 Installation Head assembly will be in place at time of beam line installation. Frame and Environmental casing is split. Each half will be pre-assembled and tested. Cooling will be fixed in place and electronics, pmt’s and light guide can be replaced by sliding a complete assembly out and repairing and replacing faulty components. Tapes and cooling tubes to be fed out at the bottom, through the environmental casing.