Presentation is loading. Please wait.

Presentation is loading. Please wait.

19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.

Similar presentations


Presentation on theme: "19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test."— Presentation transcript:

1 19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test

2

3 19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB1- –GERB has been returned for modifications and recalibration. –Re-calibration first at Imperial –Battery mods, TBC tomorrow.

4 19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB2 –In orbit –Switched off for eclipse season –Back on 28 th April –Off again now

5 19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB3 –Delivered to Alcatel in June –Now integrated onto MSG 3 –Will be returned for battery modifications and calibration check

6 19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB4 –ATP received from Eumetsat for 70% funding to match the approval by Eumetsat council. –Some activities started, parts procurement, detector blacking. –Some electronics manufacture will start at RAL. –Most subsystems will kick of Jan 04.

7 19th GIST 27 th -29 th August 2003 E Sawyer RAL Battery Proposals have been discussed with ESA that enable safe switch down without battery power, these have been assessed by Alcatel. Agreement has now been reached on the implementation, a kick-off meeting for GERB 1 will be held tomorrow. Relatively simple modifications will be incorporated and the unit re-qualified. GERB 3 will undergo similar treatment.

8 19th GIST 27 th -29 th August 2003 E Sawyer RAL Battery continued GERB on MSG1 has no battery assisted power down capability GERB software patch has been coded to detect sun close to the field of view and perform safe switch down, first test failed, some more work to do. Eumetsat may be able to modify MSG software to minimise risk to GERB in the event of a spacecraft emergency. The schedule for this is not defined

9 19th GIST 27 th -29 th August 2003 E Sawyer RAL Eclipse First Sun avoidance period started 12 February No battery safe switch down GERB switched to SAFE mode No MSG modified software There was one unplanned switch off of GERB during this period Strategy for next eclipse period (end August to end Oct) is to switch down to SUNBLOCK mode Current plan is that during eclipse periods, GERB will be in SUNBLOCK mode for approximately 5 hours.

10 19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Two issues –Contamination when sun is close to FOV –Contamination due to sun illumination of Black Body.

11 19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Close to FOV +/- 20 degrees 16.2 degrees

12 19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Contamination of blackbody signal

13 19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Contamination of blackbody signal

14

15 19th GIST 27 th -29 th August 2003 E Sawyer RAL Evolution of GERB One in orbit, data is now available Two complete instruments on the ground One more to build Minor hardware or software mods, no redesign No funding, but potential opportunity Inputs sought from the GIST and GOT


Download ppt "19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test."

Similar presentations


Ads by Google