Presentation is loading. Please wait.

Presentation is loading. Please wait.

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.

Similar presentations


Presentation on theme: "JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum."— Presentation transcript:

1 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum Geesthacht (HZG) Institute of Coastal Research

2 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects General Objectives: To provide a common base for the operational use of FerryBoxes, gliders, fixed platforms along European coasts To review the current status of existing systems in operational use in European seas To define the best technical practices for compatible, robust and cost-effective systems To define procedures for harmonizing and merging quality assessed FerryBox and Fixed Platform data at regional (ROOS) level To define procedures and technological solutions for integration and testing of new sensors on these systems

3 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.1 FerryBox Objectives: review current status of existing FB systems (e.g. sensors, quality control,data handling): review best technical practices of the existing FB systems harmonize the resulting data provide technological solutions to integrating new sensors (from WP10) into FBs define consensual procedures for using FerryBox data in validation of earth observation data Tasks: 3.1.1: Review current status of existing FB systems (flow-through systems, sensors, quality control, data handling) 3.1.2: Best practice of FB systems (flow-through system, sensors, operation procedures, antifouling, control mechanisms, data handling) 3.1.3: Harmonization and merging quality assessed data from FB systems in ROOS regions 3.1.4: Test and integration of new sensors and best practices (tightly linked to WP10.

4 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.2 Gliders Objectives: Review the current status of the existing glider fleet in operational use in European seas. Define the best technical practices for operation of a fleet of gliders (general strategies for glider operation in coastal and shallow areas, implementation of tools for path planning…) Tasks: 3.2.1 Review current status of glider operations in Europe (in coordination with the Gliding Observatories network) 3.2.2 Define the best technical practices for operation a fleet of glider

5 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.3 Fixed Platforms Objectives: reviewing the current status of existing systems in operational use in Europe defining best technical practices for compatible, robust and cost-effective systems on a variety of fixed platforms defining procedures for harmonizing and merging quality-assessed high- frequency in situ data across regional seas (e.g. the North Sea) identifying gaps in the present coverage proposing technological solutions for the integration and testing of new sensors on fixed platforms sharing data with mobile platforms and remote sensing to create new integrated products

6 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.3. Fixed Platforms (continue) Tasks: 3.3.1 Review of the current status of all existing fixed observing sites in European waters 3.3.2 best practice of fixed platform technology 3.3.3. Harmonization and merging quality assessed data from fixed platform systems in ROOS regions 3.3.4. Comparison of new sensors and assessment of their applicability for fixed platforms (strong relationship to WP10)

7 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Deliverables & Milestones Deliverables D 3.1: Report on current status of FerryBox systemsM09 D 3.2: Report on current status of gliders observatoriesM15 D 3.3: Review of current marine fixed instrumentationM21 D 3.4: Report on new sensor developmentsM36 D 3.5: Conclusion reportM42 Milestones: MS28Report on activitiesM42

8 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 Contributions of partners to WP3 partners in total: 17 budget: ~550 T€ total personal month: 105

9 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 Task leaders: Task 3.1 FerryBox: NERC (David) & NIVA & SYKE Dominique & Seppo Task 3.2 Glider:CSIC (Simon) Task 3.3. Fixed Platform: CNR (Stefania) Task 3.x.3 test & application of new sensors: HZG (Willi)

10 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.1 FerryBox Action (working plan) first year: FerryBox (responsible David Hydes): 1. review current status FerryBox : – questionnaire WP4 <> WP3 WP2 –  D 3.1. report status FerryBox (M09 = Jan 2012) 2. review best practise entire infrastructural chain of data acquisition from: sensor (performance, robustness, accuracy, etc.) to supporting system (cabling, electric and electronic components, critical sub systems such as debubbling, pumping, etc.). WP3 WP4 –First Workshop on 30 – 31. August 2011 (connected to 4 th FB- Meeting (1-2 Sept at HZG) Organizer: David, Willi, support by Seppo & George?

11 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.2 Glider Action (working plan) first year: Glider (responsible Simon Ruiz): Review current status of glider operations in Europe via questionaire, workshop? ( in coordination with the Gliding Observatories network)  D 3.2. report status glider (M15 = Jul 2012)

12 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.3 Fixed Platforms Action (working plan) first year: Fixed Platform (responsible Stefania Sparnocchia): review current status of all existing fixed observing sites –questionnaire (merged with the FB questionnaire) WP3 WP2 including stations outside of consortium subdivided by the different ROOS’s review best practise –Planning a Workshop WP3 WP4 (first months 2012?)  D 3.3. report status fixed platforms (M21 = Jan 2013)

13 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.3.4 New Sensors Action (working plan) first year: New Sensors (responsible Willi Petersen): Status of application of new sensors WP3 WP10 Output of questionnaire assessment of their applicability for FerryBox and fixed platforms (+ Gliders??). –Which new sensors are available –Suitability for unattended operation (sort of platform) –Requirements for unattended operation (power consumption, maintenance, data handling) – biofouling aspects (WP3 WP4)

14 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Time table for the entire project

15 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Time table until 2012

16 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: open questions Overlap WP3  > WP4 Connection to WP10 (e.g. defining standards, protocols, QA for new sensors)

17 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 First steps: 1st draft of a common (WP 2, 3 and 4) questionaire (together with WP2 and WP4) (first focused on FerryBox activities): WP2 : Institutions List of platforms (question: which stations should be involved (definition of what belongs to coastal systems) Contact Parameter Public access

18 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 cont. 1st draft questionaire WP3 & WP4: Standard Sensors/Parameter: –Type of sensors, experiences –Experimental parameter (new sensors  WP10) New Sensors/Parameters –parameter –status (experimental, pre-operational…) –experiences Resolution in space and time –FB: –frequency of data sampling  spatial resolution (in case of FB) –repetition rate of transects on the route –Fixed stations –frequency of data sampling –covered time period

19 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 cont. 1st draft questionaire Quality assessment (sorted by parameter) methods of QA frequency of calibration checks frequency of taking reference samples real-time (automatic) data quality checks (e.g. tests of outlier, gradient ….) post processing, how data are corrected visibility of QA for external users (e.g. flags and/or metadata) Data handling: data transfer (real time or in harbour, automatically, manually …) data storage (files, database …) public access of data, WP4 specific: Calibration Facilities …

20 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Personal month per partner

21 JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3 Links


Download ppt "JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum."

Similar presentations


Ads by Google