Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.

Similar presentations


Presentation on theme: "Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November."— Presentation transcript:

1 Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November 2010

2 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Overview Current status of CERN Computer Centre (CC) –Layout, powering and cooling Current issues and anomalies Aims of the upgrade project Proposed project –Layout, powering and cooling Project schedule and status Summary CERN Computer Centre Upgrade Project - HEPiX November 2010 - 2

3 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Overview Designed and built in early 1970s Fully refurbished around 2000 –Increased power and improved cooling Nominal current capacity: 2.5MW (including 240kW of critical power) Extended (usable) capacity: 2.9MW (including 340kW of critical power) forfeiting redundancy for all UPS systems On-going project to: –Increase the nominal capacity to 3.5MW/600kW with N+1 redundancy –Address some issues/anomalies CERN Computer Centre Upgrade Project - HEPiX November 2010 - 3

4 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Main Computer Room CERN Computer Centre Upgrade Project - HEPiX November 2010 - 4

5 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Cold aisle is cold! CERN Computer Centre Upgrade Project - HEPiX November 2010 - 5

6 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Current Status of CERN CC Main computer room (1600m²) –Air cooled racks –~1.9MW ‘Vault’ (1400m²) –Mixture of air cooled and water cooled racks + tape robots –~640kW Room for back up data in separate building (200m²) –Mainly tape robots with air cooling –~ 30kW Two Telecoms rooms –CERN Internet Exchange Point (CIXP) ~ 10kW Two types of equipment both on UPS –Physics with a single power feed but no diesel backup –Critical with dual power feeds and diesel backup CERN Computer Centre Upgrade Project - HEPiX November 2010 - 6

7 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Power and Cooling 3 physics UPS, each with 4*400kvA modules + 1 critical UPS with 2*300kVA modules Air cooled installations: –IT & Telecoms equipment (capacity up to ~2.5MW), technical areas (mainly UPS rooms)... and offices –(3+1) Chillers not secured by UPS nor diesel –Pumps and AHUs secured by diesel but not UPS –Water-tank for stored cooling capacity (a few mins) Water cooled installations: –For IT (physics) equipment (capacity up to 800kW) –(1+1) Chillers not secured by UPS nor diesel –Pumps secured by (physics) UPS –Water-tank for stored cooling capacity (~10 mins) CERN Computer Centre Upgrade Project - HEPiX November 2010 - 7

8 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Current Issues and Anomalies Cooling for critical UPS room insufficient Mixing of critical and physics equipment –Location and cooling No cooling of CC when running on UPS and insufficient stored cooling capacity when on diesel Insufficient critical power available Approaching the limit of available power for the building No redundancy for critical UPS Usage of full ‘available’ 2.9MW implies loss of redundancy for physics UPS A/C of CC coupled to adjacent office building CERN Computer Centre Upgrade Project - HEPiX November 2010 - 8

9 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Current Power Situation CERN Computer Centre Upgrade Project - HEPiX November 2010 - 9 IT Physics Equipment IT Critical Equipment Physics UPS (4*) Diesel Generator (N+1) Critical UPS (2) 340kW 2.56MW 2.9MW Normal Network *N+1 redundancy sacrificed to achieve 2.9MW

10 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Main Computer Room CERN Computer Centre Upgrade Project - HEPiX November 2010 - 10

11 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Vault CERN Computer Centre Upgrade Project - HEPiX November 2010 - 11

12 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Upgrade Project - HEPiX November 2010 - 12 Backup Building

13 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Primary Goals of the Upgrade Project Solve the cooling issue for the critical UPS room –New UPS systems in a different location Increase critical UPS capacity to 600kW Increase overall power capacity to 3.5MW Restore N+1 redundancy for both critical and physics UPS systems Secure cooling for critical equipment when running on UPS and extend stored cooling capacity for physics when on diesel Decouple the A/C for CC from the adjacent office building CERN Computer Centre Upgrade Project - HEPiX November 2010 - 13

14 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Power Requirements CERN Computer Centre Upgrade Project - HEPiX November 2010 - 14 IT Physics Equipment IT Critical Equipment Physics UPS (4+1) Diesel Generator (N+1) Critical UPS (3+1) 600kW 2.9MW 3.5MW Normal Network Cooling for IT Critical Equipment

15 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Approach Barn area of CC building to be converted to house: –3 Electrical rooms –An IT room with water cooled racks to house critical equipment (up to 450kW) –New ventilation systems for the critical area of the main computer room New ventilation systems for the Telecoms rooms will be installed in adjacent offices A new partially sunken building for additional chillers and a storage tank for the cooling of the critical areas An additional storage tank for extending the stored cooling capacity for physics equipment CERN Computer Centre Upgrade Project - HEPiX November 2010 - 15

16 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Areas Affected Presentation Title - 16 Barn Reduced Critical Area Telecoms Rooms New CV room Two new transformers Future expansion for Telecoms RoomsNew AHUs

17 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Layout - I CERN Computer Centre Upgrade Project - HEPiX November 2010 - 17

18 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Layout - II CERN Computer Centre Upgrade Project - HEPiX November 2010 - 18

19 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Layout - III CERN Computer Centre Upgrade Project - HEPiX November 2010 - 19

20 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Layout - IV CERN Computer Centre Upgrade Project - HEPiX November 2010 - 20

21 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Layout - V CERN Computer Centre Upgrade Project - HEPiX November 2010 - 21

22 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Layout - VI CERN Computer Centre Upgrade Project - HEPiX November 2010 - 22

23 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Layout - VII CERN Computer Centre Upgrade Project - HEPiX November 2010 - 23

24 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Schedule and Status All Market Surveys already launched RFPs in process of being released ‘Barn’ cleared of IT equipment end of October ‘Barn’ to be cleared of electrical and other installations end of 2010 Adjudication of contracts at March FC CE works to be completed July 2011 EL+CV installations Aug/2011-May/2012 Increased physics power available March 2012 and increased critical power June 2012 CERN Computer Centre Upgrade Project - HEPiX November 2010 - 24

25 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Summary CERN CC was not designed for today’s IT equipment Major upgrade already performed in 2000 Further upgrade in progress: –To maximize the capacity of the CC –To resolve some outstanding issues Increased capacity to be available mid-2012 Last increase in capacity foreseen with today’s technology Other solutions will be required for any future increases in required computing capacity CERN Computer Centre Upgrade Project - HEPiX November 2010 - 25


Download ppt "Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November."