Presentation is loading. Please wait.

Presentation is loading. Please wait.

V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing.

Similar presentations


Presentation on theme: "V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing."— Presentation transcript:

1 V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing

2 RDMS CMS Participation in CMS Computing Activities during 2006 Participation in SC4 and SCA06: Russian sites follow the SC4-CSA06 chain; LCG installation of CMSSW; participation in Phedex data transfers (load test transfers and heart beat transfers) – permanently from May to September – volume of monthly data transferred – about 10 TB; SC4 production: participation in CMS event simulation 2 RDMS CMS sites (JINR and SINP) were ready and registered for CMS production – 500 000 events done – 1 % of total amount (~50 millions events) Job Robot (user analysis jobs) - 8.6% of total number of CMS jobs were submitted to three RDMS sites (ITEP,JINR,SINP) Phedex FTS T1-T2 transfers during October-November (IHEP, ITEP, JINR and SINP) – some problems with transfer due to not stable level of bandwidth and not quite proper settings at T1 FTS servers for RDMS institutes (CNAF-T1 served as FTS-server for JINR, FZK-T1 – for SINP, ASGC-T1 – for IHEP and IN2P3-T1 – for ITEP)

3 Usage of CPU resources at Russian Tier2 during 2006 IHEP INR ITEP JINR LPI PNPI RRC KI SINP MSU it is ~ 2 % of CPU resources used for all CMS jobs (production, Job Robot, analysis and private users jobs) in the LCG-2 infrastructure 32 members of CMS VO at RDMS - 5.3 % of a total number of CMS VO members: JINR – 15 IHEP – 6 Kharkov -4 SINP -3 INR -2 ITEP -2 CMS sw is installed at RuTier2 LCG-2 sites ~ 15 % of CPU resources at RuTier2 have been used for CMS jobs but more than 1% is private users jobs (running at PNPI and RRC-KI)

4 CMS PhEDEx file transfer statistics web-page (design of S.Belov, JINR) (http://rocmon.jinr.ru/scripts/phedex) (currently for IHEP, ITEP, JINR and SINP) up to 1.4 MBs up to 12 MBs 4 - 12 MBs 0.5 - 5 MBs all sites SINP The examples illustrating not-stable connectivity between CERN and RuTier2 sites 6 % files transferred 95 % files transferred

5 Current situation (March, 2007) CERN-T1 as FTS server for Russian sites (since February) ! It is the first step CERN-PROD to serve as T1 for RDMS We still have serious connectivity problems - we need a real support from Ru-Tier2 networking experts We couldn’t continue Phedex transfers to SINP and ITEP as there is no free space at SEs A full-range participation of RRC-KI, PNPI, INR and LPI in CMS computing activities can be accomplished only under existence of computing support groups (person) in each of the institutes New version of Phedex ( 2_5_0_1 ) has been installed RDMS Tier-2 has growing from 4 ( IHEP, ITEP, JINR and SINP) to 8 sites (RRC-KI, PNPI, INR, LPI added) – fixed in February

6 Request on Resources CPU KSI2Ktot ALICEATLASCMSLHCb 2007 5003203006001720 2008 100080083010003630 2009 16001550125015005900 2010 24002800225020009450 DISK TBtot ALICEATLASCMSLHCb 12515012050445 2503603201501080 4008004804502130 60018006307503780 Tape Active TB ALICEATLASCMSLHCb 100 200250400100 400530500300 2007 2008 2009 2010 We confirm our request based on detailed estimations; only slight corrections are expected accordingly the current situation with CMS computing plans

7 To follow CMS computing requirements we need: transfer rates to be at least not lower than 20 MBs (and support from RuTier2 network admins) reasonable ratio between CPU performance and disk space ( just now available CPU are at 25% of needed but available SE disk space is less then 10%!) system administrators support at all 8 RDMS CMS sites nomination of the responsible person for CMS software support in each of the participating institutes the important CMS milestone: Computing and Software Systems and Physics Procedures must be ready for CSA 07 - by the beginning of July 2007 Conclusions


Download ppt "V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing."

Similar presentations


Ads by Google