Download presentation
Presentation is loading. Please wait.
Published byGeorge Copeland Modified over 8 years ago
1
CIS 598 Progress Report Will Strohmeier
2
Outline Action Items Project Plan Productivity Deliverables Cost Estimates Architecture Design Test Plan Questions
3
Action Items No actions Items came up since my Overview and Requirements
4
Project Plan: Productivity ActivityTime (hours)QuantityProductivity Research/Setup15-- Project Dev30~1125~35 lines/hr Total:45--
5
Project Plan: Deliverables Working web app Final Source Code and git repository Testing evaluation References Project evaluation Final Presentation
6
Project Plan: Cost Estimates ItemEstimate (hours)Comments Code to Develop50~1750 lines 35 lines/hr Testing15-25Includes one LAN party Doc/Paper/Presentation10 Total:70-85
7
Architecture Design 1 * 1 * 1 Api bracket thing 2 Account username email Tournament id Match Id participant1 participant2 p1Score p2Score winner Participant id
8
Test Plan I will be using black box testing while developing the application. I will then have a test run with the app on April 27 th at the last console LAN of the semester. This will give me something to talk about in my final presentation/give me ideas for future work.
9
Questions?
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.