1 SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC

2 THE SOUTHERN REGION IN BRIEF

3 INSTALLED CAPACITY OF SOUTHERN REGION IN MW 31,316 MW HYDRO THERMAL WIND IPP NUCLEAR GAS MICRO AND CAPTIVE CAPACITIES ARE NOT INCLUDED IN THE INSTALLED CAPACITY

4 SOUTHERN REGION:QUICK FACTS INSTALLED CAPACITY:31,316 MW MAX DEMAND MET:21,928 MW MAX CONSUMPTION: 457 MU KARNATAKA MAX DEMAND MET 5445 MW INSTALLED CAPACITY 5802 MW DAILY CONSUMPTION AVG 84 MU ANDHRAPRADESH MAX DEMAND MET 7441 MW 9515 MW INSTALLED CAPACITY DAILY CONSUMPTION AVG 130 MU TAMILNADU MAX DEMAND MET 7228 MW 7037 MW INSTALLED CAPACITY DAILY CONSUMPTION AVG 126 MU KERALA MAX DEMAND MET 2426 MW 2610 MW INSTALLED CAPACITY DAILY CONSUMPTION AVG 34 MU DAILY CONSUMPTION MAX 107 MU DAILY CONSUMPTION MAX 166 MU DAILY CONSUMPTION MAX 39 MU DAILY CONSUMPTION MAX 147 MU

5 GENERATING UNITS AND CAPACITY UNIT CAPACITYAPKARKERTNCGSTOTAL THERMAL(500 MW) 268 THERMAL (200-250 MW) 107131545 GAS/THER(100-150 MW) 9231024 HYDRO(>50 MW) 27 161585 TOTAL 48361938162

6 3500 MW TRANSFER CAPABILITY ON HVDC.ANOTHER 500 MW POLE TO BE ADDED AT GZK. TALCHER POLE CAPABILITY TO BE ENHANCED TO 2500 MW GRID MAP TYPICAL FLOWS ARE FROM NORTH TO SOUTH GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW

7 TRANSMISSION IN SOUTHERN INDIA VOLTAGE LEVELAPKARKERTNCGS TOTAL 400 KV20421614 846212118 220/230 KV1005075902650627036626926 132/110 KV123606060372010220 32360 TOTAL2371015110637016490689971404 ABOUT 2800 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS

8 LINK TO FOLDER 3D DEMAND, LOAD CURVES HOURLY AVERAGE DEMAND ETC

9 ABT @ WORK

10 AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS GRID SECURITY……RATHER THAN COMPROMISING IT !!! …..COMPLEMENTS GRID SECURITY……RATHER THAN COMPROMISING IT !!!

11 GRID OPERATION IN THE PAST  LOW FREQUENCY PROBLEMS –FREQUENCY REMAINED AT 48 HZ AND BELOW FOR MOST PART  LOW VOLTAGE OPERATION –VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 Kv!!!!  FREQUENT GRID DISTURBANCES –A DISTURBANCE ALMOST EVERY MONTH –IMMENSE FINANCIAL LOSSES FOR INDUSTRY –LOADS FREQUENTLY CUT OFF DUE TO RELAY OPERATION  INCREASED ELECTRICAL LOSSES –INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS  GRID OPERATION FOCUSSED ON FIRE- FIGHTING RATHER THAN OPTIMISATION AND ECONOMY

12 LANDMARK EVENTS  ADDITION OF GENERATING CAPACITY  TALCHER-KOLAR AND ASSOCIATED SYSTEM  UNIFIED LOAD DESPATCH SCHEME  TRANSMISSION SYSTEM AUGMENTATION  AVAILABILITY BASED TARIFF

13 IMPROVEMENTS IN GRID OPERATION  POWER SYSTEM PARAMETERS –FREQUENCY IMPROVED FREQUENCY IMPROVEDFREQUENCY IMPROVED –VOLTAGES STABLE ACROSS THE GRID VOLTAGES STABLE ACROSS THE GRIDVOLTAGES STABLE ACROSS THE GRID  OPTIMAL OPERATION –LOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRID –SAVINGS OF ABOUT Rs 450 CRORES EVERY YEAR! –MERIT ORDER OPERATION :- OPTIMISATION MERIT ORDER OPERATION :- OPTIMISATIONMERIT ORDER OPERATION :- OPTIMISATION  HYDRO CONSERVATION HYDRO CONSERVATION HYDRO CONSERVATION –HEALTHY RESERVOIR LEVELS –USE HYDRO GENERATION FOR PEAKING AND RESERVE –PUMP MODE OPERATION AT KADAMPARAI PUMP MODE OPERATION AT KADAMPARAIPUMP MODE OPERATION AT KADAMPARAI  TALCHER – KOLAR LINK –INTER REGIONAL POWER :- 9770MUs/1600MW MAX  UTILISATION OF COMMERCIAL MECHANISM –TURNOVER OF 4402 MU ON UI WORTH 800 CRORES –COSTLY GENERATION REDUCED.

14 FREQUENCY PROFILE 2002, 2003 & 2004

15 REALITY BITE: FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!. EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED! COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES

16 WATER SUPPLY TO BANGALORE LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED 400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID PUMPING LOSSES REDUCED ENORMOUS SAVINGS TO THE STATE MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY

17 600 300 150

18 DEMAND Vs FREQUENCY FOR 30-JULY-04 FREQ DEMAND

19

20

21 MERIT ORDER : UNITS BOXED UP POWER STATIONSTATE CAPACITY(MW) FUEL VARIABLE COST TATA DIESELKARNATAKA 79 DIESEL308 RAYALSEEMA DGPPKARNATAKA 27 DIESEL360 YELEHANKA DIESELKARNATAKA 128 DIESEL314 THANRBHAVIKARNATAKA 220 NAPTHA325 SUB-TOTAL 454 BRAHAMPURAM DPPKERALA 107 DIESEL275 BSESKERALA 157 NAPTHA308 KASARGODE PCLKERALA 22 NAPTHA298 KAYAMKULAMKERALA 360 NAPTHA322 SUB-TOTAL 646 BASIN BRIDGETAMIL NADU 120 NAPTHA584 P.P.NALLURTAMIL NADU 330 NAPTHA415 SUB-TOTAL 450 TOTAL 1550

22 OPTIMAL RESERVOIR UTILISATION LINGANAMAKKI IN KARNATAKA ENERGY STORAGE IN MU (THIS YEAR) :- 2473MILLION UNITS ENERGY STORAGE IN MU (LAST YEAR) :- 1689MILLION UNITS MORE THAN 400 MILLION UNITS OF ENERGY SAVED DUE TO IMPROVED OPERATIONAL EFFICIENCY AND OPTIMISATION THIS IS WORTH Rs 80 CRORES

23

24 UI DETAILS

25 APKARKERTN POND Y Total UI exported(-) / Imported(+) in MUs - 248 3 20611040648-48 Total amount paid in Crores Rs. - 469 354181161-7 Average rate of UI in paise/unit 18 9 17 2 174 24 8 142 SUMMARY OF UI – 78 WKS (FROM 01/JAN/03 TO 27/JUN/04)

26 UI IN SR (FROM 01/01/03 TO 27/06/04)  TOTAL UI TURNOVER :- 4402 MU  TOTAL CONSUMPTION OF SR :- 207136 MU  UI MARKET IS 2 % OF THE TOTAL ENERGY MARKET  TOTAL CGS GENERATION:- 54458 MU  UI MARKET IS 8% OF THE TOTAL ISGS ENERGY MARKET …..CONTD

27 UI IN SR (FROM 01/01/03 TO 27/06/04)  TOTAL UI AMOUNT DISBURSED:- 823 CR  INTER REGIONAL UI:- +876 MU - 151 MU  AVG WEEKLY TRANSACTION:- 57 MU  AVG WEEKLY UI AMT DISBURSED:- 10.5 CR  AVG RATE OF EXPORT TO WR IN PAISE/U –144 PS/U @SR –266 PS/U @WR  AVG RATE OF IMPORT FROM ER IN PAISE/U –144 PS/U @ ER

28 HVDC BHADRAWATI (WR-SR LINK)  TOTAL WR-SR IR LINK TRANSMISSION CHARGES (01/01/03 TO 30/06/04) :- 102.33CRORES  TOTAL AMOUNT IN IRE A/C TOWARDS SR BENEFICIARIES (01/01/03 TO 30/06/04) :- 23.05CRORES  23 % OF ANNUAL TRANSMISSION CHARGE

29