Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.

Similar presentations


Presentation on theme: "Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève."— Presentation transcript:

1 Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève o Introduction o Mice Control and Monitoring o Detector DAQ o Trigger and data volume o What happened since the DAQ workshop o What will happen next o Summary

2 Mice CM Oct 2005Jean-Sébastien GraulichSlide 2 Introduction  Some Definitions: DDAQ: Detector Data Acquisition Deals mainly with data from detectors Exception for RF phase and amplitude Starts when the data is accessible on the VME bus DAQ ≠ Detector Front End ! In particular, the choice of FEE belongs to the detector! DAQ ≠ Trigger System Ends when the data is on local disk What is after (Remote Storage) is not covered MCM: Mice Control and Monitoring Should run constantly, giving status of MICE beam line, cooling channel and detector condition. Related to safety Long parameter list with very different hardware (from simple temperature probe to the status of standalone control subsystems)

3 Mice CM Oct 2005Jean-Sébastien GraulichSlide 3 DAQ Workshop (Daresbury)  Took place at Daresbury, Aug 31 – Sept 1  14 people registered  Workshop goals Overview MICE needs and main issues Decide general orientations for MCM and DDAQ  Key Issues for CM Safety Guarantee the stability of Beam line, including target system RF system Absorbers  Key Issues for DDAQ Guarantee stability of data taking (no data loss nor data taking time loss) Guarantee the data quality (integrity and relevance)

4 Control System Equipment Monitoring & “Control” System Human Interface may not need to be present (all the time) could be buttons/lamps/local mimic /plug-in terminal user/global expert/local DAQ Generic Control & Monitoring paul drumm daq&c-ws august/september 2005

5 Mice CM Oct 2005Jean-Sébastien GraulichSlide 5 About MCM  EPICS has been presented (Brian Martlew) Experimental Physics and Industrial Control System Software framework for control and monitoring Free, Open Source Based on Channel Access protocol Large user community in physics : Advanced Photon Source (Argonne), PSI, DESY, LBL, LANL, Jefferson Lab, KEK B-Factory Expertise available Daresbury and D0 at FNAL  EPICS was found complying with MICE requirements and has been adopted  MCM update rate should be > 1 Hz

6 Mice CM Oct 2005Jean-Sébastien GraulichSlide 6 To Be Done for MCM  Refine list of parameters Was a goal of WS but not really discussed See talks in CM 11  In particular, from detector groups: It’s time to think about: HV system Interface with EPICS might take some time Tracker Control interface with EPICS No problem expected but Should be assigned to someone

7 Mice CM Oct 2005Jean-Sébastien GraulichSlide 7 About DDAQ (1)  Main Requirement from the MICE proposal The system should allow the acquisition of about 1000 muons/Spill (1 ms Spill per second) Already reduced to 600 muons/Spill (originally because of expected beam problems)  -> First Principle: This is because the readout of 1 event takes several 100 µs… (20 kB of tracker data to transfer) Detector data Readout must be performed at the end of the spill Data has to be buffered in the FEE

8 Mice CM Oct 2005Jean-Sébastien GraulichSlide 8 About DDAQ (2)  -> ADC problem Average Time between 2 muons is 1.7 µs Conversion time for conventional ADC > ~3 µs Critical for EmCal, worrying for Tracker Possible Solution: Flash ADC after Signal stretching Flash ADC already available from TPG R&D (40 MHz) Even if the event buffer is large enough, conventional ADC can NEVER collect 600 muons/ms

9 Mice CM Oct 2005Jean-Sébastien GraulichSlide 9 Trigger Issues  There is an urgent need for a more precise Particle-trigger scheme New task for the same working group  Clarification is needed The word “trigger” is used for 3 different things RF trigger ≠ Readout trigger ≠ Particle trigger Particle trigger = Digitisation trigger

10

11

12 Mice CM Oct 2005Jean-Sébastien GraulichSlide 12 Trigger Issues  Main Requirements on DAQ-Trigger Should be flexible (allow calibration, cosmic events, etc…) Should allow partitioning (Data acquisition only from a subsystem)  For Particle-Trigger a natural t 0 is Zero Crossing of RF signal Make sure we can we get that signal with a 60 ps resolution.

13 Mice CM Oct 2005Jean-Sébastien GraulichSlide 13 Data Volume  Data Volume: 40 kB/μ (2 kB/μ if zero suppression in the tracker) ~25 MB/spill or 40 GB/run ~ 100 TB/year (2500 runs)  Online Storage capacity: ~10 TB Easy to set up Allow keeping 1 month of data taking on local disk  Remote storage Not discussed

14 Mice CM Oct 2005Jean-Sébastien GraulichSlide 14 DAQ Architecture Proposal Trigger distribution Optical link Online Monitoring TrackerEmCalTOF Trigger + Ckovs Ethernet Linux PCs GigaBit Switch Run Control Event Builder Online Storage VME Crates Remote Storage

15 Mice CM Oct 2005Jean-Sébastien GraulichSlide 15 DAQ Software  UNIDAQ has been presented (M. Yoshida) Works very well for Test Beam Would require to write an Event Builder (a lot of work)  LHC DAQ software have been reviewed (E. Radicioni) CMS system is not importable Alice system (DATE) has nice functionalities: Run control (state machine) with GUI Allows to Configure DAQ topology, select trigger, communicate with Slow Control Allow Partitioning of Event Building DAQ performance check with GUI Framework for online monitoring Logging of DAQ-generated messages  No decision yet

16 Mice CM Oct 2005Jean-Sébastien GraulichSlide 16 About CM DDAQ  Integration/Interaction between the two {has been/is/will be} heavily discussed No Decision yet Data from each single spill should be validated by the MCM system MCM should be able to interrupt data taking Many data values don’t have to be archived. For many parameters, an “all OK” tag is enough Environment data needed for detector calibration require special attention Included in the data file ? Or logged elsewhere and linked by time stamp?  De facto, separated in the skill space… And also by geography

17 Mice CM Oct 2005Jean-Sébastien GraulichSlide 17 What Happened since Then  DDAQ Testbench Started in Geneva Hardware ordered It will probably fixed the choice of VME-PCI interface: CAEN V2718 Crates delivery in February  EPICS Training has started at RAL distribution Trigger Optical link + Online Monitoring Crate1 Crate2 Linux PCs Office Switch Run Control + Event Builder VME Crates

18 Mice CM Oct 2005Jean-Sébastien GraulichSlide 18 What happened since Then  Test beam in KEK (See Makoto’s talk) Half tracker FEE electronics -> Good Estimation of readout time of the tracker > 6.5 ms per event (10 kB) ! (x 2 for full tracker) Average transfer rate: 1.5 MB/s SBS Bit3 interface should be able to do better -> Slowed down by Unidaq ? Can be improved: - CAEN interface - DMA transferHowever Event by event readout -> Not a First Principle validation Only one VME crate -> Not an architecture validation

19 Mice CM Oct 2005Jean-Sébastien GraulichSlide 19 What will happen next  Finalise Mice Note on Terminology  DAQ Test bench in Geneva will start in in Feb05  Next DAQ workshop around CM14 in Osaka ? Agreement on DDAQ requirements Agreement on DDAQ MCM integration  Test beam in Frascati integrating TOF and EmCal (Mai06?)

20 Mice CM Oct 2005Jean-Sébastien GraulichSlide 20 Conclusion  Decisions taken in Daresbury MCM will be based on Epics DAQ will be based on VME bus We’ll use PC under Linux Detector Readout at the end of the spill The same group will work on the trigger system  To be done first Obtain a solid proposal for FEE Specifications for DDAQ, including trigger system -> Choice of DDAQ software framework Finalise discussion on DDAQ/CM interconnection

21 Mice CM Oct 2005Jean-Sébastien GraulichSlide 21 Seeds for Discussion  How many events do we really need? N acq ~ 1/(t av +t dead ) ; t av = average time between two µ t av is limited by rate in TOF0 and by the probability to have 2 muons in the same burst: t av > 1 µs (1000 good µ) Example: t dead =2.8 ms -> N acq =~240  Which Monitoring data might have an impact on Physics Analysis ? Environment: P, T Magnetic fields Low level alarms: Some parameter (like HV) slightly out of range. Not serious enough to stop the run but we could want to veto the spill offline Target depth ? Other ?  How much data with Beam ON/RF OFF ? 1/1, 1/2, 1/4 w.r.t. Beam ON/RF ON?  How much data with Beam OFF/RF ON ?

22 Mice CM Oct 2005Jean-Sébastien GraulichSlide 22 Resting slides

23 Mice CM Oct 2005Jean-Sébastien GraulichSlide 23 On the Agenda  Talks on Control and Monitoring (CM)  Talks on Detector DAQ (DDAQ)  Talks on integration between CM and DDAQ

24 Mice CM Oct 2005Jean-Sébastien GraulichSlide 24 Workshop Goals (A. Bross)  Refine “Physics” parameter List  Further develop an understanding of the D/C/M needs for Beam Line Cooling Channel Detectors  Produce Baseline Proposal for DAQ Online System Controls system Monitoring system  Produce Outline for Comprehensive MICE D/C/M specification document Start from MICE-NOTE-GEN-097 (Draft01/JSG) Goal to have draft (0/1?) ready for collaboration meeting  GIVE SERIOUS CONSIDERATION TO EXISTING SYSTEMS/SOLUTIONS

25 Mice CM Oct 2005Jean-Sébastien GraulichSlide 25 DDAQ Roadmap  Ideally Identify constraints and needs List Use Case and User requirements Write Specification Choose Adapted Hardware and Software Set up a test bench Check performance

26 RF Phase and Particle detection 201.25 MHz 5 ns flat top 10V pulse 16 bits: 1bit~1in 10 4 triggerTOF 0 & 1 : 6m@c = ~20ns TOF 2 : +10m@c = ~50ns Proposal: Each cavity generates a Zero crossing point (e.g. -ve slope): TDC between TOF1 & next Z/C resolution ~ 5ns/360=14ps/degree Calibration: Single cavity: find E max & E min Possible 2  phase ambiguity but does it matter? Paul Drumm


Download ppt "Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève."

Similar presentations


Ads by Google