2 Activities of our FTIR group within HYMN: 1.Coordination of WP 4 (UB) 2.Perform solar absorption measurements in the mid-infrared spectral region at the 7 European NDACC stations (all, Year 1-3) 3.Perform solar absorption measurements at Ile de La Réunion during a 8-months campaign (3 months originally proposed) (BIRA, month 15) 4.Campaigns in Paramaribo or onboard Polarstern (UB, year 1) 5. Historical data set (ULg IMK-IFU, CH4 and N2O month 12) 6.a) Cell measurements (Bremen – university Karlsruhe, year 1-2) b) Optimise the retrieval of CH 4 in mid-infrared region (Chalmers, year 1-2) c) Evaluate error budget of CH 4 and N2O vertical profile data (IMK-FZK,y.1-2) 7.Provide current consistent set of total column densities and vertical profiles of CH 4 and N 2 O for model evaluation and satellite validation (ULg, month 12-36) 8.Validate and calibrate the SCIAMACHY and infrared satellite measurements (IMK-IFU, BIRA, month 24-36). 9.Model-observation comparison group (coordinator, UB and BIRA, year 1-3)

3 - pT-files (NCEP) - surface pressure (~ every 10 min ?) - data format (HDF ? Wait for IRWG meeting May 2007) - A priori-profiles optimization (from models and HALOE ?)

4 Objectives -To perform solar absorption measurements in the mid-infrared spectral region at the 7 European NDSC stations spanning latitudes from 28°N to 80°N, throughout the duration of the project, at a minimal frequency of about 1 meas./week provided clear sky conditions occur. -To perform solar absorption measurements at Ile de La Réunion (France) in the tropics during a 3-months campaign. -To optimise the retrieval of CH4 in the mid-infrared spectral region. -To evaluate the error budget of CH4 and N2O vertical profile data. -To provide a consistent set of total column densities and vertical profiles of CH4 and N2O for model evaluation and satellite validation. -To validate and calibrate the SCIAMACHY and infrared satellite measurements.

5 Description of work 1. The FTIR measurements at the 7 European NDSC stations will be continued at all sites for the duration of the project. 2. A three months measurement campaign will be performed at Ile de La Réunion (France) 3. Optimize the retrieval strategy for CH4 in terms of precision and consistency among the measurement stations. Extent the optimized retrieval strategy for N2O, developed for the European NDSC within the EU project UFTIR, to the tropical stations. Among the most important retrieval parameters are: the selection of spectral microwindow(s) and associated spectroscopic parameters, the instrument line shape function, a priori profiles and parameters and associated error covariance matrices, choice of ancillary data (p, T, a priori profiles of interfering species), fitting options, etc. 4. At all stations, the retrieval strategy developed will be applied to retrieve CH4 and N2O from the spectra. This includes all available time series of FTIR spectral measurements, back at least to the mid-nineties. 5. Perform a detailed error analysis. 6. Determine a common strategy to validate CH4 total columns of SCIAMACHY as well as the infrared satellite instruments 7. Validate the satellite measurements of CH4 total columns

6 Deliverables D4.1 Report on common measurement strategy (month 8, partner 6) D4.2 For all FTIR stations: preliminary historical time series of total column abundances and vertical profiles for CH4 and N2O (for model evaluation and satellite validation) (month12, partners 6-11) D4.3 Assessment report of associated retrieval error budget (month 20, coordinated by partner 6) D4.4. Report on optimized retrieval strategy (month 20, coordinated by partner 10) D4.5 For all FTIR stations: revised historical time series of total column abundances and vertical profiles for CH4 and N2O (for model evaluation and satellite validation) (month 24, partners 6-11) D4.6. Preliminary results on the validation of the satellite data with FTIR observations from all sites. At all sites solar absorption measurements extent back several years, hence the validation can be done for the lifetime of SCIAMACHY, IMG and first years of IASI. (month 24, coordinated by partner 7) D4.7 For all FTIR stations: time series of total column abundances and vertical profiles for CH4 and N2O, extending to the last year of the project (month 36, partners 6-11) D4.8. Final results on the validation of the satellite data with FTIR observations from all sites. (month 36, coordinated by partner 7)