MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES.

Similar presentations


Presentation on theme: "MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES."— Presentation transcript:

1 MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES BOARD MONITORING AND LABORATORY DIVISION VAPOR RECOVERY CERTIFICATION SECTION

2 June 20, 2001MLD - Proposed TP-201.42 PRESENTATION AGENDA TEST METHODOLOGY TEST EQUIPMENT COMPLIANCE TESTING QUESTIONS, COMMENTS & SUGGESTIONS

3 June 20, 2001MLD - Proposed TP-201.43 TEST METHODOLOGY Includes All Test Methods Used For Certification and Compliance Tests Modification includes 6 Test Methods

4 June 20, 2001MLD - Proposed TP-201.44 TEST METHODOLOGY - CONTINUED Method 1 –standards imposed from nozzle to UST –no remote vapor check valve installed Method 2 –Phase II balance and Hirt VCS 200 systems –standards imposed from nozzle to UST –remote vapor check valve installed –vapor check valve cannot be disabled

5 June 20, 2001MLD - Proposed TP-201.45 TEST METHODOLOGY - CONTINUED Method 3 –Phase II balance and Hirt VCS 200 systems –standards imposed from nozzle to UST –remote vapor check valve installed that can be disabled by removing the poppet on the fuel side Method 4 –standards imposed from Phase II riser to UST –no vacuum-producing device between riser and UST

6 June 20, 2001MLD - Proposed TP-201.46 TEST METHODOLOGY - CONTINUED Method 5 –bellows-equipped Phase II systems –standards imposed at the nozzle/fillpipe interface during vehicle fueling Method 6 –verifies proper drainage of gasoline from the base of vent pipe to the UST –used after compliance established for system using appropriate of Methods 1-4

7 June 20, 2001MLD - Proposed TP-201.47 TEST EQUIPMENT Methods 1, 2, 3 Dynamic Back Pressure Test Assembly

8 June 20, 2001MLD - Proposed TP-201.48 TEST EQUIPMENT - CONTINUED Methods 1, 2, 3, 4, 6 Dynamic Pressure Release Assembly

9 June 20, 2001MLD - Proposed TP-201.49 TEST EQUIPMENT - CONTINUED Methods 2, 4 Capped “T” Assembly

10 June 20, 2001MLD - Proposed TP-201.410 TEST EQUIPMENT - CONTINUED Method 5 Donut Pressure Test Assembly

11 June 20, 2001MLD - Proposed TP-201.411 TEST EQUIPMENT - CONTINUED Method 6 Vent Pipe Pressure Assembly

12 June 20, 2001MLD - Proposed TP-201.412 COMPLIANCE TESTING Compliance Tests = Certification Tests Option to Waive Requirement to Introduce Gasoline into Phase II Risers for Existing Stations Procedure Bias Created by Excessive Initial Flowrate Addressed

13 June 20, 2001MLD - Proposed TP-201.413 QUESTIONS, COMMENTS & SUGGESTIONS Written Comments Due by July 9, 2001 Send Comments To: –Paul Marzilli Air Resources Board 1900 14th Street Sacramento, CA 95812 or –pmarzill@arb.ca.gov


Download ppt "MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES."