Presentation is loading. Please wait.

Presentation is loading. Please wait.

2006 AUSAC Meeting VLBI/eVLBI with the 305-m Arecibo Radio Telescope Arecibo VLBI Group Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman (Jon.

Similar presentations


Presentation on theme: "2006 AUSAC Meeting VLBI/eVLBI with the 305-m Arecibo Radio Telescope Arecibo VLBI Group Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman (Jon."— Presentation transcript:

1 2006 AUSAC Meeting VLBI/eVLBI with the 305-m Arecibo Radio Telescope Arecibo VLBI Group Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman (Jon Hagen)

2 2006 AUSAC Meeting VLBI Operations 2005-6 Telescope proposals: 28 (10 HSA, 15 Global/EVN, 3 e-VLBI) Observing Runs : 40 (14 HSA, 18 Global/EVN, 5 eVLBI, 3 NME) Standard Operations at 1Gbit/s from Feb-2005 Operations at 327 MHz, L-, C-, and X-bands No. of VLBI runs: 2001=12, 2002=15, 2003=16, 2004=24, 2005=36. eVLBI in 2005-6 eVLBI continuum demonstrator on March 05 Sustained operations at 32 Mb/s (occasional fringes at 64Mb/s) Joined EXPReS Consortium (funded Oct. 05) Demonstration of eVLBI to E.C. Science Commissioner, July 05

3 2006 AUSAC Meeting eVLBI Advantages No need for disks/tapes. Speed at which results are obtained. Target of Opportunity. Real-time monitor of Station reliability. Reduced manpower at VLBI station. No longer observing blind. Disadvantages Fear of single point failure. No multi-pass correlation. Loss of low bandwidth stations. Presently lower max bit rate than disks. Capital and recurring costs of links.

4 2006 AUSAC Meeting Data Path to JIVE  PRISANET (PR) of the Arecibo Obs./UPR.  AMPATH (US) of Florida Intl. Univ.  Abilene (US) of Internet 2.  SURFnet (NL) of SURFnet BV. Data rate: 32 Mbps. DAR/Formatter MK5 JIVE in2net

5 2006 AUSAC Meeting EXPReS Objectives: 1) Create production-level e-VLBI service. 2) Reliable telescope connection to the JIVE correlator via Internet. 3) Data flow of up to 16 Gb/s into correlator via infrastructure of trans-continental dimensions and capability of generating real-time cosmic radio source images. 4) Design and prototype hardware, software and data transport services to support future e-VLBI facilities with net data flows of hundreds of Gb/s.

6 2006 AUSAC Meeting e-VLBI Plans & Possibilities Need to upgrade Mark-5 system (~$5k). –Faster CPU –Gb/s ethernet Present link from AO is shared OC-3 (155 Mb/s) –Cannot sustain > 32 Mb/s to JIVE In near term focus on optimizing OC-3 link –Reserve bandwidth (at a cost) –More efficient protocols (TCP variants) Update observatory switch to be OC-12 (655 MB/s) compatible (~$20k). If available, OC-12 may cost $200k/month at present. Cheaper fiber expected after communication link to St. Croix established.

7 2006 AUSAC Meeting High-SensitivityVLBI Science - I D. Hough (Trinity U. Tx.) & C. Aars (Angelo State U, Tx) Search for pc-scale jets in extremely faint FRII Radio Galaxy Nuclei. RMS noise =10  Jy/beam Peak flux=1.5 mJy (3C34), 4 mJy (3C132)

8 2006 AUSAC Meeting High-Sensitivity VLBI Science - II Extragalactic Supernova Remnants SN2001em 18-cm eVLBI; Garrett et al. 3.5-cm HAS; Bietenholz & Bartel Odd SN thought possibly to be an off-axis GRB. VLBI shows this to be unlikely as source is not Expanding relativistically. SN1979C 6-cm HAS; Bartel & Beitenholz Shell structure revealed in this SNR for The first time. Peak brightness = 230  Jy/beam

9 2006 AUSAC Meeting High-Sensitivity VLBI Science - III Nuclei of ARP 220 18-cm Global; Lonsdale et al. RMS=5.5  Jy /beam; Linear resolution ~ 1 pc Detect 49 point sources with 60  Jy < S < 1.2 mJy. Four of the sources are new, implying an SN- rate of 4  2 per year in ARP220. 6-cm 1Gbps EVN; Parra & Conway Observed Arp220 for 10 min (rms=30  Jy/beam) as part of 100 source ULIRG sample. First two 5-GHz detections in Arp220, neither coincident with 18-cm compact sources. Western detection confirmed with VLBA archive data & 18-cm ToO data, believed to be ultra-luminous SNs similar to SN1986J.

10 2006 AUSAC Meeting Current & Near-Future Activities Continue support of HSA and Global/EVN arrays. For 2005, five e-VLBI tests scheduled, starting 16 March. Purchase more Mark-5 disc packs. Offer has been made to host the next EVN Technical Operation Group (TOG) meeting of EVN at Arecibo. When available, upgrade to Mark-5B. Explore options for a supplementary antenna to improve efficiency of phase-referenced VLBI, etc.

11 2006 AUSAC Meeting Timeline The post-upgrade 305 m Arecibo radio telescope became a part of the VLBI network in late 1990s for the HALCA mission of the Japanese VSOP project (S2 recorder). In 2001, Arecibo acquired its hybrid tape-based VLBA-Mark IV (VLBA4) recording system. In 2004, the Observatory procured its Mark 5A disk-based recording system, enabling the largest telescope in the world to become electronically connected to other radio telescopes in the world in real time via eVLBI observations.


Download ppt "2006 AUSAC Meeting VLBI/eVLBI with the 305-m Arecibo Radio Telescope Arecibo VLBI Group Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman (Jon."

Similar presentations


Ads by Google