Part 6 Synthesis of Heat Exchanger Networks. 6.1 Sequential Synthesis Minimum Utility Cost.

Similar presentations


Presentation on theme: "Part 6 Synthesis of Heat Exchanger Networks. 6.1 Sequential Synthesis Minimum Utility Cost."— Presentation transcript:

1 Part 6 Synthesis of Heat Exchanger Networks

2 6.1 Sequential Synthesis Minimum Utility Cost

3 Example 1 Fcp (MW/C) Tin (C) Tout (C) H11400120 H22340120 C11.5160400 C21.3100250 Steam: 500 C Cooling water: 20 – 30 C Minimum recovery approach temperature (HRAT): 20 C

4

5

6 Heat Balances around Temperature Intervals

7 Transshipment Model

8 Remarks LP for minimum utility consumption leads to the same results as the Problem Table in Pinch method. The transshipment model can be generalized to consider multiple utilities to minimize total utility cost. This model can be expanded so as to handle constraints on matches. This model can also be expanded so as to predict the matches for minimizing the number of units. We can embed the equations of the transshipment model within an optimization model for synthesizing a process system where the flows of the process streams are unknown.

9 Index Sets

10

11 Condensed Transshipment Model

12 Example 2 FCp (MW/K) Tin (K) Tout (K) H12.5400320 H23.8370320 C12.0300420 C22.0300370 HP Steam: 500 K, $80/kW-yr LP Steam: 380 K, $50/kW-yr Cooling Water: 300 K, $20/kW-yr HRAT: 10K

13

14

15 Sequential Synthesis Minimum Utility Cost with Constrained Matches

16

17 Basic Ideas

18

19 Heat Exchange Options Hot stream i and cold stream j are present in interval k (see figure in the previous page). Cold stream j is present in interval k, but hot stream i is only present at higher temperature interval (see figure in the next page).

20

21 Index Sets

22

23 Expanded Transshipment Model

24 Match Constraints

25 Example 1 Fcp (MW/C) Tin (C) Tout (C) H11400120 H22340120 C11.5160400 C21.3100250 Steam: 500 C, $80/kW-yr Cooling water: 20 – 30 C, $20/kW-yr Minimum recovery approach temperature (HRAT): 20 C The match between H1 and C1 is forbidden.

26 Condensed Transshipment Model The annual utility cost: $9,300,000.

27 Expanded Transshipment Model Annual Utility Cost: $15,300,000 Heating Utility Load: 120 MW Cooling Utility Load: 285 MW

28 Sequential Synthesis Prediction of matches for minimizing the unit number

29 Objective Function

30 Heat Balances The constraints in the expanded transshipment model can be modified for the present model: 1.The heat contents of the utility streams are given. 2.The common index i can be used for hot process and utility streams; The common index j can be used for cold process and utility streams.

31 Heat Balances

32 Logical Constraints

33 Solution

34 Example 1 Fcp (MW/C) Tin (C) Tout (C) H11400120 H22340120 C11.5160400 C21.3100250 Steam: 500 C Cooling water: 20 – 30 C Minimum recovery approach temperature (HRAT): 20 C

35 Condensed Transshipment Model

36

37 MILP (i)

38 MILP (ii)

39 Solution

40

41 Alternative Solution

42 Solve MILP without Partition

43 Only 5 units! One less than the previous two!

44 Sequential Synthesis Automatic Generation of Network Structures

45 Basic Ideas Each exchanger in the superstructure corresponds to a match predicted by the MILP model (with or without pinch partition). Each exchanger will also have as heat load the one predicted by MILP. The superstructure will contain those stream interconnections among the units that can potentially define all configurations. The stream interconnections will be treated as unknowns that must be determined.

46 Superstructure for one hot stream and two cold streams

47 Embedded Alternative Configurations H1-C1 and H1-C2 in series H1-C2 and H1-C1 in series H1-C1 and H1-C2 in parallel H1-C1 and H1-C2 in parallel with bypass to H1-C2 H1-C1 and H1-C2 in parallel with bypass to H1-C1

48

49 Parameters and Unknowns

50 Objective Function

51 Equality Constraints

52 Inequality Constraints

53 Example 3 StreamTin (K) Tout (K) Fcp (kW/K) h (kW/m^2K) Cost ($/kW-yr) H1440350222.0- C1349430202.0- C23203687.50.67- S1500 -1.0120 W1300320-1.020 Minimum temperature approach = 1 K Exchanger cost = 6600+670(Area)^0.83

54 Solution