Presentation is loading. Please wait.

Presentation is loading. Please wait.

Interoperability Rudy van Beurden GTE ExCom member GTE+ Workshop on GTE+ Work Programme 24 June 2008.

Similar presentations


Presentation on theme: "Interoperability Rudy van Beurden GTE ExCom member GTE+ Workshop on GTE+ Work Programme 24 June 2008."— Presentation transcript:

1 Interoperability Rudy van Beurden GTE ExCom member GTE+ Workshop on GTE+ Work Programme 24 June 2008

2 IT & Communications Roadmap GTE+ Workshop on GTE+ Work Programme 24 June 2008

3 Lack of coordination re data exchange and IT related matters Inconsistent adoption of existing industry standards Growing need for coordination and harmonization at EU level Requirement for interoperability re data & communications Need for common reference source for development of technical codes Drivers

4 Deliver EU wide guidance plan on: –Data exchange principles & criteria –Could include “duty to inform” & restrictions on use of data –Rules for data exchange –Recommended data formats & exchange protocols –Consultation process for new formats and protocols –Adoption principles and implementation Produce “Handbook” for use in technical code development Objective of “IT and Communications Roadmap”?

5 1 st Phase: –Information gathering, analysis of commonalities and differences –Coordination of activities with other stakeholder bodies 2 nd Phase: –Key issues and requirements identified through consultation and analysis 3 rd Phase: –Development of Guidance plan (delivery in 2010) Draft Plan for Roadmap

6 Procedure on Harmonisation of Maintenance Publication GTE+ Workshop on GTE+ Work Programme 24 June 2008

7 Drivers Planned maintenance periods are already published by the TSOs (website, bulletin board, …) or made available through ad-hoc documents BUT… Publication is not harmonised (timing, access to information, nature of works performed, impact, communication channel)

8 Objective To streamline the communication about planned maintenance amongst TSOs and between TSOs and market participants By providing market participants with a standardized planning of works and interventions (impact, file format, communication channel…)

9 Planning 1st phase: drafting of a document stating the current practices with regards to maintenance publication by GTE Business Rules sub- Working Group. To do this, a questionnaire will be drawn up and sent to the GTE members 2nd phase: gather the feed-back from market participants collected either through a workshop or via a consultation process 3rd phase: develop and valide a final version of the procedure on harmonisation of the maintenance publication

10 Discussion


Download ppt "Interoperability Rudy van Beurden GTE ExCom member GTE+ Workshop on GTE+ Work Programme 24 June 2008."

Similar presentations


Ads by Google