CCLRMP and CIT Management Committee Service Agreement Coast Information Team (CIT)

Similar presentations


Presentation on theme: "CCLRMP and CIT Management Committee Service Agreement Coast Information Team (CIT)"— Presentation transcript:

1 CCLRMP and CIT Management Committee Service Agreement Coast Information Team (CIT)

2 What the Service Agreement defines The products to be delivered by the CIT to the CCLRMP Chair. The feedback to be provided by the CCLRMP Completion Table to the CIT. The information to be provided by the CCLRMP Technical Planning Team to the CIT.

3 Products from the CIT to the CCLRMP Chair (1) ProductDelivery EBM Framework discussion paper7 July 2002 EBM Framework30 October 2002 Ecosystem Spatial Analysis (ESA)20 January 2003 Cultural and Social Spatial Analysis (CSSA)20 January 2003 Economic Gain Spatial Analysis (EGSA)20 January 2003 Hydroriparian Decision Tool20 January 2003 Other Ecosystem Management ToolsTBD

4 Products from the CIT to the CCLRMP Chair (2) ProductDelivery Wellbeing Assessment (WA) framework of elements and objectives 20 February 2002 WA draft human indicators30 April 2002 WA draft ecosystem indicators15 May 2002 WA draft performance criteria8 October 2002 WA draft analysis of results16 December 2002 Completed Wellbeing Assessment20 January 2003 Options and Scenarios17 Feb.-13 Mar. 2003 Institutional Analysis24 Feb.-7 Apr. 2003

5 Feedback from the CCLRMP Table to the CIT ProductDelivery Performance criteria and evaluations of irreplaceabilty and vulnerability in the ESA 15-24 October 2002 Evaluations of irreplaceabilty and vulnerability in the CSSA 15-24 October 2002 Evaluations of irreplaceability and vulnerability in the EGSA 15-24 October 2002 WA framework of elements and objectives28 February 2002 WA draft human and ecosystem indicators15 May 2002 WA draft performance criteria15-24 Oct. 2002 WA draft analysis of results7-9 January 2003 Options and Scenarios17 Feb.-6 Apr. ’03

6 Input from the CCLRMP TPT to the CIT (1) ProductDelivery Input on performance criteria and evaluations in the ESA 30 Sep.- 3 Oct. 2002 Input on evaluations of irreplaceability and vulnerability in the CSSA 30 Sep.- 3 Oct. 2002 Input on evaluations of irreplaceability and vulnerability in the EGSA 30 Sep.- 3 Oct. 2002 Input on the WA framework of elements and objectives 10 February 2002 Input on the WA draft indicators8 May 2002 Input on the WA draft performance criteria30 Sep.-3 Oct. 2002

7 Input from the CCLRMP TPT to the CIT (2) ProductDelivery Government held data for the ESA, CSSA, and EGSA 1 May - 1 Sep. 2002 Government held data for the WA1 May - 1Sep. 2002 Government held data for the Options and Scenarios and Institutional Analysis 30 Sep.- 3 Oct. 2002 Temporal and spatial habitat supply modelling 1 May - 1 Sep. 2002 Ecosystem management tools TBDTBD Administrative and logistical support for CCLRMP reviews of CIT products ongoing

8 Progress So Far Wellbeing Assessment (WA): data being gathered. Ecosystem-Based Management (EBM) Framework: discussion paper being prepared. Cultural and Social Spatial Analysis (CSSA): methodology being developed. Economic Gain Spatial Analysis (EGSA): RFP issued; due to start 1 August.

9 EBM Framework: Product Strategic direction: what EBM aims to achieve (goals, objectives, indicators, etc.). Implementation procedures and tools: how to achieve EBM (decision making principles, planning activities and products, analytical tools, etc.).

10 EBM Framework: Process To be prepared by an EBM specialist group and a reference group drawn from CIT and pilot project teams. EBM Framework Discussion Paper + Gitga’at- Kitasoo/Xaixais Pilot Project EBM Framework + two North Coast LRMP papers on EBM: July 23. Specialist and reference group comments: by August 16. CCLRMP participant comments: by August 20. Draft EBM Framework document: by September 17. Specialist and reference group workshop: by October 15. Final EBM Framework: October 30.

11 WA performance criteria and ESA targets CIT WA team drafts performance criteria: September 17-20. LRMP TPT/CIT WA team/CIT ESA team joint review of WA performance criteria and ESA targets: Sep. 30-Oct. 3. CCLRMP participant feedback on ecosystem performance criteria and ESA targets: October 15-17 (Port Hardy) [Thanksgiving Oct. 14]. CCLRMP participant feedback on human performance criteria: October 23-25 (Bella Coola).

12 CSSA: key points for the Central Coast What places are culturally or socially important and why? Compilation and review of existing data: August. Bob Lee meetings with community sages to identify community components and sources (NE Vancouver Island and Central Coast: contacts?): August. Arrangements with First Nations: July-August. Data gathering: September-October. FN and CCLRMP reviews of preliminary analysis: late November or early December.

13 Other Evaluation Sessions CCLRMP participant feedback on ESA evaluations: early-mid November. CCLRMP participant feedback on EGSA evaluations: mid-late November.

14 Session Questions SessionTimeQuestion WA ecosystem performance criteria and ESA targets Oct. 16-18 (Port Hardy) confirmed WA human performance criteria Oct. 23-25 (Bella Bella) confirmed ESA evaluationsNov. 7-8 or Nov. 14-15 joint Central & North Coast? location? EGSA evaluationsNov. 14-15 or 21-22 joint Central & North Coast? location? CSSA evaluationsNov. 28-29may be Dec. 12-13 location?