Implementation Project 5-6386-1 Proposed JCP Performance Prediction Models for PMIS 1.

Similar presentations


Presentation on theme: "Implementation Project 5-6386-1 Proposed JCP Performance Prediction Models for PMIS 1."— Presentation transcript:

1 Implementation Project 5-6386-1 Proposed JCP Performance Prediction Models for PMIS 1

2 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 2 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

3 JCP Distresses in PMIS Overview 3

4 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Methodology – Estimated age – Estimated treatments – Modeling groups – Recalibration 4 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

5 Original Models 5 χ=Traffic factor ε=Climatic factor σ=Subgrade factor=1 α,β,ρ control curve shape

6 Recalibration Objectives 6 2 1 Medium 3 2 JCP types 3 climatic zones 3 traffic levels 4 treatments: PM=preventive maintenance LR=light rehabilitation MR=medium rehabilitation HR=heavy rehabilitation For 5 JCP distresses and ride score, find {α,β,ρ} for: 23 HeavyLow PM LR MR HR TOTAL: 72 combinations

7 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 7 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

8 Available Data 8 30,831 records (1993-2010) Dallas:11,578 Houston: 10,754 Childress:713 Beaumont: 7,786 Classified into categories and utilized: 29,627 records Real age available for 2,750 records Estimated age

9 Data Treatment Objectives Minimize the influence of JCP distresses decreasing due to: – Maintenance policies and/or – Distress progression Estimate JCP age (not available in PMIS) Estimate JCP treatments (not available in PMIS) Determine significant modeling factors, grouping where applicable 9

10 Failure JCP Distress Progression 10 Failed Js&Cs Shattered slab Concrete patch Longitudinal crack other cracks

11 Effect of Maintenance and Distress Progression 11 Age JCP Distress

12 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 12 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

13 Estimated Age 13 Best estimate based on 2,750 real ages R 2 =56%, all coefficients’ P-values < 0.0001

14 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 14 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

15 Estimated Treatments 15

16 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 16 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

17 Significant Modeling Factors 17 2 1 Medium 3 2 JCP types  non-significant 3 climatic zones  non- significant for HR 3 traffic levels 4 treatments: PM=preventive maintenance LR=light rehabilitation MR=medium rehabilitation HR=heavy rehabilitation 23 HeavyLow PM LR MR HR TOTAL: 20 significant combinations

18 20 Modeling Groups 18 JCP 2=3

19 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 19 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

20 For Each Distress Type: 1.Test statistical significance of modeling factors, group when non-significant 2.Examine the data for adherence to the logical order of performance: HR > LR > PM Low traffic > medium traffic > heavy traffic 3.Examine statistical summaries and bubble plots of the data to determine seed values and boundaries for the model coefficients 4.Fit the HR model for the traffic level that best adheres to the data 5.Constrain the remaining HR model coefficients, fit the models and calculate the percent RMSE change with respect to the original model 6.Constrain the LR model coefficients, repeat steps 1 to 5 7.Repeat for PM Procedure: SAS proc nlin. If no convergence, fit based on RMSE reduction. 20

21 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 21 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

22 Failed Joints and Cracks 22

23 Failed Joints and Cracks Zone 1 23

24 Failed Joints and Cracks Zones 2 & 3 24

25 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 25 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

26 Failures 26

27 Failures Zone 1 27

28 Failures Zone 2 28

29 Failures Zone 3 29

30 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 30 Results – Failed joints and cracks – Failures – Concrete Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

31 Concrete Patches 31

32 Concrete Patches Zone 1 32

33 Concrete Patches Zone 2 33

34 Concrete Patches Zone 3 34

35 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 35 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

36 Longitudinal Cracks 36

37 Longitudinal Cracks Zone 1 37

38 Longitudinal Cracks Zone 2 38

39 Longitudinal Cracks Zone 3 39

40 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 40 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

41 Shattered Slabs 41

42 Shattered Slabs 42 Shattered slabs=0 for approximately 98% of the data

43 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 43 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

44 Ride Score Slab warping = JCP roughness (FHWA, 2010) Roughness = JCP condition (Lukefahr, 2010) Therefore: JCP ride score =f(random moist/temp gradients) 44 Ride score % Data

45 Ride Score 45 Conclusion: best prediction is last year’s measurement

46 Presentation Outline Overview of JCP distresses in PMIS Original models and recalibration objectives Available data Methodology – Data treatment – Estimated age – Estimated treatments – Modeling groups – Recalibration 46 Results – Failed joints and cracks – Failures – Patches – Longitudinal cracks – Shattered slabs – Ride score Conclusions

47  66 new JCP distress models  1 model = original  59 models—RMSE decreased (improvement)  6 models—RMSE increased (constrained models based on engineering judgment)  Average RMSE change = +27.72%  Ride score’s best prediction is previous year measurement 47