Presentation is loading. Please wait.

Presentation is loading. Please wait.

4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) Use of multi wires chambers in air for profile measurements.

Similar presentations


Presentation on theme: "4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) Use of multi wires chambers in air for profile measurements."— Presentation transcript:

1 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) Use of multi wires chambers in air for profile measurements of intensive beams at IHEP (Protvino)

2 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)2 YearsProton beam Neutrino beams Detector(s)Results 1974 - 1982 Up to 2x10 12, 30 bunches, 5s spill duration , anti-  focused beam; beam-dump ITEP Spark Neutrino Detector 1. -pairs in -interactions; 2. search for short-lived particles using nuclear emulsion; 3.  tot (N), quasi-elastic scattering, including limits on  -oscillation parameters,  e-scattering, etc. 4. prompt neutrinos (charm production in pFe-interactions) 1985 - 2003 Up to 1.4x10 13 (booster), 29 bunches, 5s spill duration , anti-  focused beam; beam-dump; short decay path SKAT Bubble Chamber (up to 1990); JINR-IHEP Neutrino Calorimeter 1. ( anti-)-inclusive scattering, structure functions, e -  universality, exclusive channels 2. prompt neutrinos 3. e -oscillations with Neutrino Calorimeter Neutrino beams at IHEP

3 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)3 Construction 116 wires 1 2 15 16 V bias 116 wires 1 2 15 16 Y profile Beam 3 mm V bias a bc d 1 16 X profile 120mm 156mm element a and d element b Mechanical construction of chamber (type A)

4 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)4 Construction - 2 Chamber AChamber B Signal electrode Construction 14 central + 2x12 wires connected in parallel, 38mm working area 16 strips, 140mm working area Materialberyllium-bronze alloy aluminum Size wire of  200  40  x 8mm Distance between wires/strips 0.8mm1mm Bias plane 116 wires, 1mm step, beryllium-bronze alloy Distance between signal and bias plane3mm Main parameters of chamber A and B

5 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)5 Electronics ADC + memory chamber 20m Schematic drawing Timing diagram   100s beam digitalization 5s5s5-10s5s5s Time Signal

6 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)6 Measurements (vacuum) Originally the chambers were used inside of beam pipe under a pressure of ~10 -2 torr Beam profile for focused (chamber A) and wide beam (chamber B) Channel number Channel number 16 mm 140 mm Beam profiles Chamber AChamber B Number of -electrons Number of  -electrons per proton (measured with V bias =0): chamber A – 0.03, chamber B – 0.01

7 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)7 Measurements (vacuum) - 2 Chamber signal, relative units 1.010 13 Beam intensity, protons/cm 2 Chamber A Linearity spill duration varied from 20 ns to 5  s chamber signal is a sum of 14 central wires signals intensity measured by BCT V bias = 0 the same dependency was observed for chamber B too

8 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)8 Measurements (vacuum) - 3 Dependence of signal on pressure and bias voltage chamber signal is a sum of all wires signals Bias voltage, V Chamber signal, relative units P ~ 1 Torr P ~ 2x10 -1 Torr P ~ 5x10 -2 Torr P ~ 5x10 -3 Torr for V bias =0 the signal is equal for all pressures after first 1-2 years of use all chambers were operated with V bias =0

9 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)9 The chambers in air Focused neutrino beam target beam ~5m~5-7m chamber 1985 - 1994 beam-pipe Short decay path beam targetabsorberchamberbeam-pipe ~10m ~ 1996 beam

10 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)10 Measurements (air) Linearity Proton intensity in 10 12 protons per spill (5  s) Chamber signal, relative units Chamber signal, relative units

11 4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)11 Summary The multi wires chambers were usefully used during many years in vacuum and air for profile measurements of intensive proton beams.


Download ppt "4 th workshop on NBI, 7-11 November 2003Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) Use of multi wires chambers in air for profile measurements."

Similar presentations


Ads by Google