Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks."— Presentation transcript:

1 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [LB2 Results] Date Submitted: [6Mar00] Source: [Ian Gifford] Company [M/A-COM, Inc.] Address [1011 Pawtucket Boulevard Lowell, MA USA 01853-3295] Voice:[+1 978 442 4650], FAX: [+1 978 442 5442], E-Mail:[giffordi@ieee.org] Re: [] Abstract:[The results of the Letter Ballot #2 held from 23Feb00 to 3Mar00.] Purpose:[Provide TG1 with a detailed analysis of the LB2.]] Notice:This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

2 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 2 IEEE P802.15 Working Group for Wireless Personal Area Networks TG1 LB2 Report March 2000, Albuquerque, NM USA

3 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 3 Contents LB2 Summary TG1 Ballot Roadmap LB2 Background/Flowchart LB2 Results –Balloting –Commenting Next Steps

4 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 4 LB2 Summary Opened 23Feb00 closed 3Mar00, noon to noon EST LB2 MOTION: “Submit the contents of -99/173r5 [99173r5P802-15_TG1-LB1-Comments-Resolution- Worksheet.xls] to the P802.15 WG for approval to apply the TG1 Comment Resolutions to the current P802.15.1 Draft Standard.” LB2 RESULT: Motion passed with 34/1/2 or 92% (- 99/173r5a) LB2 yielded 20 Reply Comments to be resolved against –99/173r5a

5 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 5 TG1 Ballot Roadmap 19992000 9/99 Today 11/99 8/99 12/99 WG Balloting 2/00 3/00 4/005/006/00 7/00 8/00 9/0010/0011/0012/00... 10/99 Sponsor Balloting HICAILNMWACATNFL Meetings/ Events WG Letter Ballot #1 WG Letter Ballot #2 Sponsor Plan IEEEETSI? Sponsor Ballot #1 Sponsor Ballot #2 WG LB #1 TG 1 Plan WG LB #2 WG LB #3 Option TG 1 Actual WG LB #1 WG LB #2 Sponsor LB #1 WG LB #(3)

6 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 6 TG1 Draft Standard Flowchart This graphic is provided to indicate the chain of custody for the Specification to Standard. The v1.0A was submitted 4Nov99, v1.0B was submitted on 1Dec99 And the v1.1 is expected in May00. V1.2 is just a place holder. Bluetooth v1.0 A Bluetooth v1.0 B Bluetooth v1.1 Bluetooth v1.2?

7 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 7 Letter Ballot #1 Comment DB TG1 Draft Standard Flowchart - 1 Draft Standard Submission V0.6 (v1.0A) 4Nov99 Draft Standard Submission V0.6 4Nov99 23Dec99 Letter Ballot #1 Comment DB 27Dec99 11Nov99 *Letter Ballot 1 Ballot Results & Comment Prep. { 27Dec99 * All comments are loaded into the database. Any Bluetooth comments are also loaded. Draft Standard Submission (v1.0B) 1Dec99

8 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 8 TG1 Draft Standard Flowchart - 2 (cont.) Letter Ballot #1 Comment DB 27Dec99 Bluetooth Response 20Jan00 P802.15 Interim Meeting 10-13Jan00 27Jan00 -99/173r5a Letter Ballot #1 Comment DB 3Mar00 Letter Ballot #2 23Feb00 { P802.15 Interim Meeting 6-10Mar00

9 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 9 Letter Ballot #2 Comment DB TG1 Draft Standard Flowchart - 3 (cont.) Draft Standard Submission updated to V1.0 Letter Ballot #2 Comment DB 6Mar00 Letter Ballot #2 Ballot Results & Comment Prep. 3Mar00 Letter Ballot #2 23Feb00 { Bluetooth Response Letter Ballot #1 Comment DB May00 { Bluetooth Errata Process P802.15 Interim Meeting 8-12May00 Draft Standard Submission (v1.1) May00

10 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 10 23Feb00 the P802.15 Working Group was comprised of 43 voting members: 1Mr. Houman Alborzivoter 2Mr. Dimitri Alexandrouvoter 3Mr. Simon Baatz (Simon)voter 4Mr. Edul Batliwala (Edul)voter 5Mr. Alan Bien (Alan)voter 6Dr. Chatschik Bisdikianvoter 7Mr. Dave Carlson (Dave)voter 8Mr. Harshal Chhaya (Harshal)voter 9Mr. Wm. Caldwell Crosswyvoter 10Mr. William Cruz (Bill)voter 11Mr. Richard Ditch (Rich)voter 12Mr. Richard Eckard (Dick)voter 13Mr. Kurt Fischer (Kurt)voter 14Mr. Matthias Frank (Matthias)voter 15Mr. Ian Gifford (Ian)voter 16Ms. Nada Golmie (Nada)voter 17Mr. Allen Heberling (Allen)voter 18Mr. Robert Heile (Bob)voter 19Mr. John Paul Jones (John)voter 20Dr. Srinivas Kandalavoter 21Dr. Parviz Kermani (Parviz)voter 22Mr. Stuart Kerry (Stuart)voter 23Mr. Patrick Kinney (Pat)voter 24Mr. Bruce P. Kraemer (Bruce)voter 25Dr. Yunxin Li (Yunxin)voter 26Mr. Daniel R. McGlynnvoter 27Mr. Michael D. McInnis (Mike)voter 28Dr. Akira Miura (Akira)voter 29Dr.Thomas Müller (Thomas)voter 30Mr. Peter Murray (Peter)voter 31Mr. Erwin R. Noble (Erwin)voter 32Mr. Mike Paczonay (Mike)voter 33Mr. Arto Palin (Arto)voter 34Dr. Davis Pan (Davis)voter 35Mr. Ivan Reede (Ivan)voter 36Mr. Carlos A. Rios (Carlos)voter 37Mr. Brian E. Roan (Brian)voter 38Mr. Karlheinz Schwarz voter 39Dr. Stephen J. Shellhammervoter 40Mr. Thomas Siep (Tom)voter 41Mr. Nick Stapleton (Nick)voter 42Mr. Steve Torp (Steve)voter 43Dr. Fujio Watanabe (Fujio)voter 44Mr. Todor Cooklev (Todor)Voter = Resignation prior to the LB #1 Start

11 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 11 23Feb00 the P802.15 Working Group was comprised of 15 non members: Nearly Voter 43 Mr. David Cypher (Dave)Voter 44 Mr. Rajesh Jarang (Rajesh)Voter 45 Mr. Kevin Marquess (Kevin)Voter 46 Mr. Richard Wilson (Dick)Voter Aspirant 47 Mr. Richard Alfvin (Rick)Voter 48 Mr. James Allen (Jim)Voter 49 Mr. Thomas Baker (Tom)Voter 50 Dr. Victor Bahl (Vic)Voter 51 Mr. William Bailey (Bill)Voter 52 Mr. Timothy J. Blaney (Tim)Voter 53 Mr. Masaki Hoshina (Masaki)Voter 54 Mr. Gary McCoy (Gary)Voter 55 Mr. Anand R. Prasad (Anand)Voter 56 Mr. Matthew Sherman (Mat)Voter 57 Mr. Hirohisa Wakai (Hirohisa)Voter

12 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 12 LB2 Results - Overview 43 Total Voting Members 37 Total Votes (34/1/2) 6 Total Failed to vote

13 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 13 LB2 Results - Detail

14 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 14 LB2 Results - Detail a = Abstain n = Do Not Approve (Negative) y = Approve (Affirmative) /c = with Comments w/o = with out Comments y = failed to respond Red = dropped from Membership

15 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 15 IEEE P802.15 Working Group for Wireless Personal Area Networks Sponsor Balloting Pool Status

16 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 16 P802.11 Sponsor Balloting Pool as of 16Feb00 WG Membership 43 Voting 7 Nearly Voting 16 Aspirant LAN/MAN 802.15 54? P802.16 66 1579+9 ? ? ? ?

17 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 17 Sponsor Balloting Pool as of 16Feb00 (cont.)

18 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 18 Sponsor Balloting Pool as of 16Feb00 (cont.)

19 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 19 Sponsor Balloting Pool Planning Schedule - Overview The LAN/MAN 802.15 Balloting Pool needs to filled before the May00 Interim Meeting. We need to send requests to join in Mar00. 2000 2001 LB1 43D LB(3) 40D May00Jul00 LB2 10D Mar00 Working Group Sponsor Balloting Group Invitation Balance Form Balloting Group Preliminary Balloting Pool (3 Months)

20 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 20 Sponsor Balloting Pool Planning Schedule - Detail

21 doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 21 Next Steps More Request to join via e-mails? The MC will craft a generic letter to help promote and explain the Balloting Pool - 00/056r0 Contact? –802 Secretary to advertise –P802.11,.16 Chairs to advertise –Liaison Mailing List New Link on.15 Web Site? Other?


Download ppt "Doc.: IEEE 802.15-00/052r0 Submission March 2000 Ian Gifford, M/A-COM, Inc.Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks."

Similar presentations


Ads by Google