Presentation is loading. Please wait.

Presentation is loading. Please wait.

COLOMBIA AIMS. Título Capítulo Background Disbursment – 1998 ODA System – 2000 Cooperation Map – 2005 Non traditional donors – 2007 SSC – 2010 New Agency.

Similar presentations


Presentation on theme: "COLOMBIA AIMS. Título Capítulo Background Disbursment – 1998 ODA System – 2000 Cooperation Map – 2005 Non traditional donors – 2007 SSC – 2010 New Agency."— Presentation transcript:

1 COLOMBIA AIMS

2 Título Capítulo

3 Background Disbursment – 1998 ODA System – 2000 Cooperation Map – 2005 Non traditional donors – 2007 SSC – 2010 New Agency – New Challenges - 2011

4 Demand Map Information by: 1.Donor 2.Theme 3.National Estrategy Areas

5 Subnational Demand Map

6 SSC 1. Bilateral 2.Regional Estrategies 3.Regional Dialogue Mechanism

7 1.Colombia - High Medium Rent Country – Second receptor of cooperation in Latin America and Caribbean. 2.Colombia like donor in SSC and Triangular. 3.Colombia recognize the different partners and actors – National Estrategy. 4.The new development vision require a better system. ACTUAL SITUATION

8 1.Improve coordination between national and subnational institutions, NGOs and APC Colombia. 2.Improve regional distribution. 3.Strengthen capacities. 4.Strengthen SSC. 5.Produce better information. 6.M&E based on results. 7.Mutual accountability. CHALLENGES

9 SYSTEM REQUIREMENTS ODA Other Donors SSC & T APC Budget BSC WEB APC COLOMBIADONORS NATIONAL & SUBNATIONAL INSTITUTIONS NGOs, PRIVATE SECTOR, ACADEMY

10 1.Results information – ODA and SSC (knowledge cost ) 2.Detailed information by region and beneficiaries 3.Disbursement by proyect and region 4.Paris (Busan) Indicators. 5.Match national indicators information with International cooperation. 6.Align with donor system. 7.Match SSC information with the beneficiaries 8.Obtain an share information with other partners. 9.Share the system with national and subnational institutions. SYSTEM CHALLENGES

11 1.IATI Support – Standard, Learn Lections, Good experiences. 2.Share Knowledge about technology builded for IATI 3.System Diagnostic – what the country need?. 4.New system architecture – Software and hardware 5.Implementation WHAT WE NEED

12 MUCHAS GRACIAS www.apccolombia.gov.co


Download ppt "COLOMBIA AIMS. Título Capítulo Background Disbursment – 1998 ODA System – 2000 Cooperation Map – 2005 Non traditional donors – 2007 SSC – 2010 New Agency."

Similar presentations


Ads by Google