Presentation is loading. Please wait.

Presentation is loading. Please wait.

Click to edit section. Needs for a Stormwater Management Program NFIP/CRS Emergency Response Flood Protection TMDLs Water Quality NPDES Development Review.

Similar presentations


Presentation on theme: "Click to edit section. Needs for a Stormwater Management Program NFIP/CRS Emergency Response Flood Protection TMDLs Water Quality NPDES Development Review."— Presentation transcript:

1 Click to edit section

2 Needs for a Stormwater Management Program NFIP/CRS Emergency Response Flood Protection TMDLs Water Quality NPDES Development Review RegulatoryOperation and MaintenancePlanning and Monitoring

3 Click to edit section Stormwater Funding Options Comparison Funding OptionSufficientDedicated Not Limited Fair / EquitableRecurring Ad Valorem Taxes Gas Tax Sales Tax MSTU MSBU Stormwater Assessment Fee Stormwater Utility General Obligation Bond Grants and Appropriations Loans Impact Fees

4 Click to edit section Stormwater Utilities in Florida 403.0893, F.S. authorizes implementation of a stormwater utility Approximately 175 in Florida Formerly Florida Association of Stormwater Utilities Implementation Manual Education and advocacy Florida Stormwater Association

5 Click to edit section Benefits of a Stormwater Utility Users pay based on the degree to which they use the stormwater system or derive benefit Improves planning and operations Dedicated funding source Increased grant funding and bonding opportunities Improved Community Rating System

6 Click to edit section Stormwater Grants Hazard Mitigation Grant Program Pre-Disaster Mitigation Flood Mitigation Assistance Others Federal Emergency Management Agency HMPG requires major disaster declarationRelates to flood protection onlyHighly competitive

7 Click to edit section Stormwater Grants Stormwater Alternative water supply Water conservation SFWMD Cooperative Funding Program Two-part application process50-60% match usually requiredDesigns and studies are eligibleNot for flood protection onlyOther grants come off the topBreak into yearly phases

8 Click to edit section Stormwater Grants SFWMD Cooperative Funding Program District Strategic Plan Priorities and Regional Water Supply Plan Strategies Environmental, resource, and/or community benefitsCost effectivenessProject readinessInnovationContinuation phase of a previously funded projectPast performance

9 Click to edit section Stormwater Grants SFWMD Cooperative Funding Program Areas discharging to an impaired water body (includes TMDLs and BMAPS) Areas within a Surface Water Improvement and Management Plan Areas identified within another regional plan or appropriate management plan Projects identified in a local government stormwater master plan Projects that have major watershed benefits such as regional solutions

10 Click to edit section Stormwater Grants Section 319 and TMDL Grants Impaired watersAt least at the 60% design phase Permitted or the permit has been scheduled for approval at the next meeting Includes storm event monitoring to determine the actual load reduction Construction completed within 3 years Minimum of 50% match, with at least 25% by the local government. Used for construction

11 Click to edit section Stormwater Grants Section 319 and TMDL Grants Impairment statusEstimated load reductionPercentage of local matching funds Cost effectiveness based on the cost per pound of nutrient removed Inclusion of a robust educational component Dedicated funding source for stormwater management, such as a stormwater utility fee

12 Click to edit section Questions


Download ppt "Click to edit section. Needs for a Stormwater Management Program NFIP/CRS Emergency Response Flood Protection TMDLs Water Quality NPDES Development Review."

Similar presentations


Ads by Google