Presentation is loading. Please wait.

Presentation is loading. Please wait.

AQUAINT Program Programmatics Dr. John D. Prange AQUAINT Program Director 301-688-7092 5 December 2001.

Similar presentations


Presentation on theme: "AQUAINT Program Programmatics Dr. John D. Prange AQUAINT Program Director 301-688-7092 5 December 2001."— Presentation transcript:

1 AQUAINT Program Programmatics Dr. John D. Prange AQUAINT Program Director JPrange@nsa.gov 301-688-7092 http://www.ic-arda.org 5 December 2001

2 AQUAINT Kickoff – 5 December 2001 2 ARDA Program Guidelines ARDA requests that government and contractor principal investigators (PI) do the following: 1. Acknowledge ARDA support - –(a) by including the some type of acknowledgement statement in all reports and publications. For example: "This work was supported in part (full) by the Advanced Research and Development Activity (ARDA)’s Advanced Question Answering for Intelligence (AQUAINT) Program under contract number XXXXXX-XX-X-XXXX" –(b) by including the ARDA logo (downloadable from ARDA web-site) on all viewgraphs or electronic presentations (e.g. PowerPoint).

3 AQUAINT Kickoff – 5 December 2001 3

4 4 ARDA Program Guidelines ARDA requests that government and contractor principal investigators (PI) do the following: 1. Acknowledge ARDA support - –(a) by including the some type of acknowledgement statement in all reports and publications. For example: "This work was supported in part (full) by the Advanced Research and Development Activity (ARDA) under contract number XXXXXX-XX-X-XXXX" –(b) by including the ARDA logo (downloadable from ARDA web-site) on all viewgraphs or electronic presentations (e.g. PowerPoint). 2. Provide measurable milestones and schedules for all contracts.

5 AQUAINT Kickoff – 5 December 2001 5 ARDA Program Guidelines ARDA requests that government and contractor principal investigators (PI) do the following: 3. Inform ARDA directly of all significant events (discoveries, successes, or failures) in a timely manner, not waiting for next scheduled reporting cycle. This includes all publications and press releases at the time of publication or release. 4. Provide a quad chart for each activity, following the sample format provided on the ARDA web-site. This quad chart shall be provided at the start of the contract and updated at each review.

6 AQUAINT Kickoff – 5 December 2001 6

7 7 ARDA Program Guidelines ARDA requests that government and contractor principal investigators (PI) do the following: 5. Respond to ARDA data calls through the contracting officer's technical representative (COTR) as needed. 6. Send copies of all contract data items, unless specifically excluded by ARDA, in timely fashion directly to the ARDA office, preferably in softcopy form (HTML preferred), to include: (a) Progress reports(d) Final report, (b) Technical reports(e) Publications (c) Financial reports(f) Patents

8 AQUAINT Kickoff – 5 December 2001 8 ARDA Program Guidelines ARDA requests that it’s Government COTRs do the following: 1. Provide ARDA with a copy of all contracts and grants that they establish under ARDA sponsorship. 2. Invite ARDA to observe contractor site visits, reviews, and meetings. 3. Provide timely financial tracking information to ARDA, as required, and especially to keep ARDA apprised of any significant variances.

9 AQUAINT Kickoff – 5 December 2001 9 ARDA Program Guidelines ARDA requests that it’s Government COTRs do the following: 4. Provide ARDA with the following contact information: (a) Project name, firm, firm's PI, PI's title, along with contact information (to include all subcontractors); (b) C0TR, title, and organization along with contact information; (c) Government Financial and Contracting POC’s along with contact information; (d) Intelligence Community "Champion(s)” for project results

10 AQUAINT Kickoff – 5 December 2001 10 ARDA Program Guidelines ARDA requests that it’s Government COTRs do the following: 5. Level of funding for current fiscal year and estimates for out-years (identify sources and amounts for all other sources of funding for activity for current and out years); and 6. Anticipated initiation, commitment, and obligation dates for ARDA provided funding.

11 AQUAINT Kickoff – 5 December 2001 11 AQUAINT Program Web Sites ARDA plans to maintain 2 different Web Sites for the AQUAINT Program: –Internet: Accessible from www.ic-arda.org Open access: Public information -- e.g. Project Summaries, quad charts, Workshop information, Evaluation Plans, and selected publications, program briefings Password Protected: Access limited to AQUAINT program participants; More detailed Internal Program information, materials, and other data; Contact Information –Internal IC Web Site Open access: duplication of public information Password Protected: Access limited to AQUAINT Program Committee and other selected government/SETA personnel -- e.g. Progress Report; Technical Reports; Final Reports

12 AQUAINT Kickoff – 5 December 2001 12 AQUAINT Program Workshops ARDA anticipates holding AQUAINT Program Workshops every 6-months –Kick-off and two Annual Workshops will be held in Washington DC area; West Coast location likely for the two mid-year Workshops –Tentative Schedule for Future Phase I Workshops May/June 2002West Coast Site Dec 2002 Washington DC Area May/June 2003 West Coast Site Dec 2003 Washington DC Area –Workshops will be approximately 3 days in length; Opportunity for open discussions/sharing among AQUAINT contractors and government team concerning program progress, evaluation results, future directions, etc. Focus on technical issues at the Program level. ARDA anticipates holding Project Reviews/Technical Site Visits to each AQUAINT Project at least once between each workshop. Schedule/Agenda arranged by each project COTR. All AQUAINT Program Government Panel members invited to attend.

13 AQUAINT Kickoff – 5 December 2001 13 AQUAINT Program Panel Principal Contact List ARDA: –John Prangejprange@nsa.gov301-688-7092 (AQUAINT Program Director) –Paul Matthewspmmatth@nsa.gov301-688-7092 (ARDA SETA) NSA: –Carol Van Ess-Dykema cjvanes@afterlife.ncsc.mil301-688-1548 –J. K. Davisjkdavis@afterlife.ncsc.mil301-688-0303 CIA: –John Donelanjohnfdo@ucia.gov703-613-8761 –Steve Maioranostevejm@ucia.gov703-613-8755 DIA: –Kelcy AllweinAfallkm@dia.osis.gov202-231-5958 –John-Josef Costandi john-josef.costandi@dia.mil202-231-3533


Download ppt "AQUAINT Program Programmatics Dr. John D. Prange AQUAINT Program Director 301-688-7092 5 December 2001."

Similar presentations


Ads by Google