Presentation is loading. Please wait.

Presentation is loading. Please wait.

3 RIP thematic categories: 11th Sept 2014, Varna (BG) I.Eco-Voucher schemes to foster eco- management and eco-innovation Speakers: PL, CZ II. Cluster development.

Similar presentations


Presentation on theme: "3 RIP thematic categories: 11th Sept 2014, Varna (BG) I.Eco-Voucher schemes to foster eco- management and eco-innovation Speakers: PL, CZ II. Cluster development."— Presentation transcript:

1 3 RIP thematic categories: 11th Sept 2014, Varna (BG) I.Eco-Voucher schemes to foster eco- management and eco-innovation Speakers: PL, CZ II. Cluster development for eco-innovation & eco- management Speakers: UK, SI III. Stakeholder platform for eco-innovation & eco- management Speakers: EE, AT Regional Implementation Plans

2 I. Eco-Voucher schemes to foster eco-management and eco-innovation Improvement of existing voucher schemes by Kujawsko-Pomorskie Region Rafał Modrzewski (PL, PP 02) 11th Sept 2014, Varna (BG) RIP themes

3 * The Polish RIP THEME visualised * A picture says more than 1.000 words 311th Sept 2014, Varna (BG)

4 I. WHY The need for:  co-operation  innovation  knowledge transfer 411th Sept 2014, Varna (BG)

5 II. OUR SOLUTION (= our RIP measure)  Promoting regional R&D potential  Open for external SMEs  Pro-ecological services and products 511th Sept 2014, Varna (BG)

6 III. Inspired by RECOMMEND  good practice from the South Moravian Innovation Center  Study visits and meetings with experts  Thematic talks with regional stakeholders 611th Sept 2014, Varna (BG)

7 IV. STATUS QUO of our RIP implementation  final version accepted  key stakeholders engaged  possible financing from regional and national programmes 711th Sept 2014, Varna (BG)

8 V. Next steps in implementing our RIP  ROP manual – more specific info  Elaboration of criteria  Contest for operator 811th Sept 2014, Varna (BG)

9 * The Polish RIP THEME visualised * A picture says more than 1.000 words 911th Sept 2014, Varna (BG)

10 I. Eco-Voucher schemes to foster eco-management and eco-innovation Business Voucher scheme by Ekoport Jan Jareš (CZ, PP 04) 11th Sept 2014, Varna (BG) RIP themes

11 * The Czech RIP THEME visualised * A picture says more than 1.000 words 1111th Sept 2014, Varna (BG)

12 I. WHY  lack of collaboration between R&D and industry  no tool / incentive available  level of transferability / simplicity  allready existing in other CZ regions 1211th Sept 2014, Varna (BG)

13 II. OUR SOLUTION (= our RIP measure)  RIP describes current situation and future goals  including concrete measures (voucher schemes)  best practices examples from other CZ regions  action plan and management  „eco“ enhancements possibilities  risk analysis  sustainability 1311th Sept 2014, Varna (BG)

14 III. Inspired by RECOMMEND  by initial monitoring of available tools (Greenovate!)  by other regions in CZ – workshop in Brno 1411th Sept 2014, Varna (BG)

15 IV. STATUS QUO of our RIP implementation  just finalised document (study)  elaborated by external expert (Subsidia)  Regional Authority and Council have approved and allocated ca 50k eur for the first call (October 2014)  RECOMMEND helped to initiate, establish and launch pilot voucher scheme in South Bohemia (www.inovoucher.cz) 1511th Sept 2014, Varna (BG)

16 V. Next steps in implementing our RIP  evaluation of the first call (2014)  monitoring of project implementations (2014 / 2015)  preparation of the second call (2015)  eco-enhancement (2015) 1611th Sept 2014, Varna (BG)

17 * The Czech RIP THEME visualised * A picture says more than 1.000 words 1711th Sept 2014, Varna (BG)

18 II. Eco-Cluster development for eco-management & eco-innovation Eco-management Cluster by Opportunity Peterborough Rod Gilchrist (UK, PP 09) 11th Sept 2014, Varna (BG) RIP themes

19 * The British RIP THEME visualised * A picture says more than 1.000 words 1911th Sept 2014, Varna (BG)

20 I. WHY Lack of SME advice and support  Need to stimulate eco innovation and efficiency  Need to improve networking and share good practice 2011th Sept 2014, Varna (BG)

21 II. OUR SOLUTION (= our RIP measure)  Improve SME networking via Future City Demonstrator project  Provide additional advice support to SMEs via 2014-20 LEADER or ESF/ERDF funding  Utilise domestic/EU funding streams to stimulate eco innovation and efficiency 2111th Sept 2014, Varna (BG)

22 III. Inspired by RECOMMEND  Advice, presentations and good practice shared by Lead partner  Partner visits during Working Summits  Field mission to Estonia showed what can be acheved through partnership 2211th Sept 2014, Varna (BG)

23 IV. STATUS QUO of our RIP implementation  Local Enterprise Partnership involved  Future City Demonstrator project to progress work  Recommend is informing LEADER bid 2311th Sept 2014, Varna (BG)

24 V. Next steps in implementing our RIP  Future City Demonstrator Project  LEADER Programme  Local Enterprise Partnership 2411th Sept 2014, Varna (BG)

25 * The British RIP THEME visualised * A picture says more than 1.000 words 2511th Sept 2014, Varna (BG)

26 II. Eco-Cluster development for eco-management & eco-innovation Eco-Innovation Cluster (Bionics) by LEA Spodnje Podravje Uroš Majerič (SI, PP 05) 11th Sept 2014, Varna (BG) RIP themes

27 * The Slovenian RIP THEME visualised * A picture says more than 1.000 words 2711th Sept 2014, Varna (BG)

28 I. WHY  Lack of activities in the eco innovation field  Insufficient support enviroment  Small number of eco innovative SME’s  Not appropriate funding for eco innovation 2811th Sept 2014, Varna (BG)

29 II. OUR SOLUTION (= our RIP measure)  Establishment of Bionics Cluster  Target groups: - Educational institutions in the field of Bionics - Local SME’s 2911th Sept 2014, Varna (BG)

30 III. Inspired by RECOMMEND  Discussed best practice examples regarding establishment of Cluster networks in the UK 3011th Sept 2014, Varna (BG)

31 IV. STATUS QUO of our RIP implementation  Finalizing the RIP  Evaluating the final draft of the RIP with corresponding stakeholders 3111th Sept 2014, Varna (BG)

32 V. Next steps in implementing our RIP  Establishment of the Bionics Cluster  Development of 5 year long term strategy for the Cluster  Joint development of eco innovation with different members of the Cluster  Providing funds for the realization of Cluster activities 3211th Sept 2014, Varna (BG)

33 * The Slovenian RIP THEME visualised * A picture says more than 1.000 words 3311th Sept 2014, Varna (BG)

34 III. Eco-Stakeholder platform for eco-management & eco-innovation Contest “eco-friendly company of the year” by Tartu Regional Energy Agency Martin Kikas (EE, PP 06) 11th Sept 2014, Varna (BG) RIP themes

35 * The Estonian RIP THEME visualised * A picture says more than 1.000 words 3511th Sept 2014, Varna (BG)

36 I. WHY  Low awareness  Low initiative on environmental friendly measures 3611th Sept 2014, Varna (BG)

37 II. OUR SOLUTION (= our RIP measure)  Contest „Eco-friendly company of the year“  To motivate companies to deal with eco- innovation and environmentally friendly measures  Recognition of good examples 3711th Sept 2014, Varna (BG)

38 III. Inspired by RECOMMEND  Mapping of best practices  ÖkoManagement Lower Austria + recognition ceremony  Seminar about Ökomanagement Lower- Austria program in detail and implementation of energy management and environmental management systems in Austria 3811th Sept 2014, Varna (BG)

39 IV. STATUS QUO of our RIP implementation  Terms and conditions of the contest are worked out  The contest is announced together with City of Tartu  Recognition event will take place on 3rd of October 3911th Sept 2014, Varna (BG)

40 V. Next steps in implementing our RIP  Publication of good practices sent to the award contest  Encouragement to take part on the national „Environmental friendly company“ contest and „Europen Business Award for the Environment“  Together with City of Tartu we plan to make it a yearly contest 4011th Sept 2014, Varna (BG)

41 * The Estonian RIP THEME visualised * A picture says more than 1.000 words 4111th Sept 2014, Varna (BG)

42 III. Eco-Stakeholder platform for eco-management & eco-innovation My eco-expert by Regional Government of Lower Austria (RECOMMEND Lead Partner) Benjamin Kuscher (AT, PP 01) 11th Sept 2014, Varna (BG) RIP themes

43 * The Austrian RIP THEME visualised * A picture says more than 1.000 words 4311th Sept 2014, Varna (BG)

44 I. WHY  defragmentation of eco-consultancy programmes  Lack of cooperation between the institutions supporting eco-management and eco- innovation  Lack of transparent selection criteria for eco-consultants 4411th Sept 2014, Varna (BG)

45 II. OUR SOLUTION (= our RIP measure)  One single selection tool for all eco-consultants  More transparent information about all eco- consultants  Awareness raising to inform about the selection tool 4511th Sept 2014, Varna (BG)

46 III. Inspired by RECOMMEND  e-mobility  Crowdfunding for energy  Eco-procurement 4611th Sept 2014, Varna (BG)

47 IV. STATUS QUO of our RIP implementation  Online tool ready  Data entered  Graphic design ready 4711th Sept 2014, Varna (BG)

48 V. Next steps in implementing our RIP  Awareness raising  Ongoing hosting  Pool of experts for any eco-consultancy 4811th Sept 2014, Varna (BG)

49 * The Austrian RIP THEME visualised * A picture says more than 1.000 words 4911th Sept 2014, Varna (BG)

50 On behalf of the Lead Partner we wish all RECOMMEND partners a successful implementation of their RIPS! Thank you for your work & commitment 11th Sept 2014, Varna (BG) Regional Implementation Plans


Download ppt "3 RIP thematic categories: 11th Sept 2014, Varna (BG) I.Eco-Voucher schemes to foster eco- management and eco-innovation Speakers: PL, CZ II. Cluster development."

Similar presentations


Ads by Google