2 nd Quarter SFY 14 1 PDLT Measures & Information October - December 2013.

Similar presentations


Presentation on theme: "2 nd Quarter SFY 14 1 PDLT Measures & Information October - December 2013."— Presentation transcript:

1 2 nd Quarter SFY 14 1 PDLT Measures & Information October - December 2013

2 2 nd Quarter SFY 14 2 OTIA III State Bridge Delivery Program Construction Progress Summary

3 2 nd Quarter SFY 14 3 State Radio Project Budget & Expended

4 2 nd Quarter SFY 14 4 Project Delivery Dashboard: State & Local Projects Note: New dashboard (2.0) is not yet operational Dundas Dashboard (PDLT)  Right click to open hyperlink:

5 2 nd Quarter SFY 14 5 Project Delivery Dashboard: State Projects (SFY 2014) Note: Data not accurate. Dashboard not operational till week of Feb. 3

6 2 nd Quarter SFY 14 6 % of Projects On Time for PS&E Acceptance (State/Local Comparison) Metric Definition: Project no greater than 90 days over the target PS&E Acceptance date. Target PS&E acceptance date is currently defined as the target bid let date minus 45 days.

7 2 nd Quarter SFY 14 7 To Construction Timeliness (State/Local Comparison) Metric Definition: % of projects reaching NTP before deadline. Deadline = PS&E Accept date + Advt Length + FHWA Review weeks + 27 days of OPD’s activities + 57 days for contract time between bid and NTP.

8 2 nd Quarter SFY 14 8 % Preliminary Engineering (PE) (State/Local Comparison) Metric Definition: Percentage of Preliminary Engineering = Design Cost divided by Total Project Cost

9 2 nd Quarter SFY 14 9 % of Design Outsourced Metric Definition: Percent of Design Outsourced for State Projects

10 2 nd Quarter SFY 14 10 Region 1 % of Design Outsourced (Region Details) Region 2

11 2 nd Quarter SFY 14 11 % Construction Engineering (CE) (State/Local Comparison) Metric Definition: Percentage of Construction Engineering = Engineering Performed divided by Construction Costs

12 2 nd Quarter SFY 14 12 % of Projects Awarded Within Engineering Estimate (State/Local Comparison) Metric Definition: % of Projects awarded at no greater than or less than 10% of the Engineering Estimate. ODOT CONFIDENTAL DATA. DO NOT DISTRIBUTE.

13 2 nd Quarter SFY 14 13 Metric Definition: % of Projects awarded at no greater than or less than 10% of the Engineering Estimate. % of Projects Awarded Within Engineering Estimate (State Only) ODOT CONFIDENTAL DATA. DO NOT DISTRIBUTE.

14 2 nd Quarter SFY 14 14 Number of Bids per SFY Qtr (Statewide) Metric Definition: Number of bids per SFY Qtr

15 2 nd Quarter SFY 14 15 On Budget: % of Original Const. Auth. Spent (State/Local Comparison) Metric Definition: % of Original Construction Authorization spent

16 2 nd Quarter SFY 14 16 Financial Plan Snapshot 2012-2015 (1st Qtr FFY 14) Metric Definition: 4-Year Cumulative Ending Balances for the Financial Plan broken down by Regions and Programs

17 2 nd Quarter SFY 14 17 Federal Funds Obligated (FFY) Metric Definition: Percentage of Federal Funds Obligated

18 2 nd Quarter SFY 14 18 Local Program Funds Obligated (1st Qtr FFY 14) Metric Definition: Percent of Local Program Funds Obligated $ Amount

19 2 nd Quarter SFY 14 19 % of Contractor Evaluations Completed (For evaluations due between 7/1/2012 and 6/30/2013) Metric Definition: Percent of Prime Contractor Evaluations completed before 90 days past the due date

20 2 nd Quarter SFY 14 20 PDLT Recent Accomplishments Completed revised PDLT charter for ILT approval, incorporating intermodal aspects Completed membership changes Developed strategies to improve PDLT communication –All Area Managers & Tech Center Managers have a seat at meetings –All Area Managers & Tech Center Managers will be copied on agendas and meeting materials Completed sub-team review –Role based teams do not need to be chartered (AMT, PMST, PDST) –PDST & PMST will continue to be sponsored by AMT and the AMT sponsors now have a seat at PDLT to raise issues directly

21 2 nd Quarter SFY 14 21 PDLT Current Initiatives PBLT/SSLT/PDLT collaboration and integration Intermodal Oregon Integration –Rail Safety Crossing project – future process improvement Local/State Integration of guidance, processes, tools Annual Project Delivery resource planning process Biannual PDLT work plan development ILT High Priority #5: Project Initiation Improvement ILT High Priority #6: Technical “mode” training for project delivery staff