Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status of UTA IAC + RAC Jae Yu 3 rd DØSAR Workshop Apr. 7 – 9, 2004 Louisiana Tech. University.

Similar presentations


Presentation on theme: "Status of UTA IAC + RAC Jae Yu 3 rd DØSAR Workshop Apr. 7 – 9, 2004 Louisiana Tech. University."— Presentation transcript:

1 Status of UTA IAC + RAC Jae Yu 3 rd DØSAR Workshop Apr. 7 – 9, 2004 Louisiana Tech. University

2 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 2 UTA IAC MC Farm and Analysis Resources Have two independent farms –Swift farm (HEP) 22 dual P3 900MHz 250Mbyte/cpu A total of.6TB disk space Generated a total of 3.6M events w/ mcp14 –CSE Farm 10 P3 900MHz cpu’s w/ 128M memory Retired  Split into two separate farms for CSE Grid computing project Generated ~1M events w/ mcp14 Analysis Machines –Four desktop machines of ~2GHz + 0.5GB each –Storage space ~0.4TB

3 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 3 The UTA-DØ Grid Team We’ve been working well with CSE colleagues Faculty: 2 HEP + 1 CSE Senior Research Associate: 0.1 FTE Research Associate: 1 FTE at FNAL Software Program Consultant: ½ FTE Engineering MS Students: 1 Physics Undergraduate Student: 2

4 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 4 UTA Software Products McFarm Job control (Drew Meyer) –As of this workshop, McFarmDST’s re-processed output are certified Ganglia resource monitoring (D. Jenkins) –Contains 7 farms (>350 CPU’s), including Tata institute, India McFarmGraph: Simulation production job monitoring system using gridftp (Aditya Nishanda, Sankalp Jain) –Provides detailed information for a MC request McPerM: MC Farm Performance Monitoring –Langston took this over Job Manager McFarm (JMM) for SAM/Grid interface (HyunWoo Kim)

5 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 5 UTA – RAC 100 P4 Xeon 2.6GHz CPU = 260 GHz 64TB of Disk space 84 P4 Xeon 2.4GHz CPU = 202 GHz 7.5TB of Disk space Total CPU: 462 GHz Total disk: 73TB Total Memory: 168Gbyte Network bandwidth: 68Gb/sec

6 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 6 UTA – RAC Joint HEP and CSE project –HEP DØ Regional Analysis Center –ATLAS DC Production –Grid 2003 test bed –Video streaming –Database research –Skin resin image database Brought online at the end of October, 2003 DØ MC Production begun at the end of Nov. 2003 Generated and delivered over 7M events  1.75M/Mo (Double the DØ capacity in 2003)

7 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 7 Future Projects Through the end of May: Participate in TMBfix #2 –20% of the total will be fixed at DPCC –First step toward the analysis at UTA – RAC –The fixed TMB will be 100% stored at UTA McFarm (Meyer + Jenkins) –Incorporate TMB fix –Test RAW reprocessing in the summer –Improve performances –Develop utilities

8 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 8 Future Projects Inclusion of JMM into SAM/Grid regular release Installation of calibration database proxy at UTA Participate in DØSAR grid MC production MySQL McFarm Monitoring Database for both McFramGraph and McPerM (Jenkins) Automated MC Request download and production Storage and refreshment of TMB data at RAC Prepare for regional analysis

9 Apr. 7, 2004UTA Status, J. Yu 3 rd DØSAR Workshop, LTU 9 Conclusions DØSAR has been the driving force for the great progress last 6 mo McFarm improvement is in its mature state –Ready to participate in any DØ activities SAM/Grid and McFarm are interfaced –Official request is being processed Some analyses have been performed at UTA IAC + RAC UTA – RAC has been online for the past four months  Immediately doubled the entire DØ 2003 capacity We are ready for grid based MC production First proposal (PHANTOM) as the collaborative effort went in  Must try for more


Download ppt "Status of UTA IAC + RAC Jae Yu 3 rd DØSAR Workshop Apr. 7 – 9, 2004 Louisiana Tech. University."

Similar presentations


Ads by Google