Presentation is loading. Please wait.

Presentation is loading. Please wait.

© 2002 Eaton Corporation. All rights reserved. …electrical distribution system design for reliable and cost effective operation Airport Facility Electrical.

Similar presentations


Presentation on theme: "© 2002 Eaton Corporation. All rights reserved. …electrical distribution system design for reliable and cost effective operation Airport Facility Electrical."— Presentation transcript:

1 © 2002 Eaton Corporation. All rights reserved. …electrical distribution system design for reliable and cost effective operation Airport Facility Electrical Design and Management

2 Airport PowerNet Systems l Chicago l Denver l San Francisco International l New York JFK l Seattle-Tacoma l Philadelphia l Pittsburgh l … plus 13 other airports

3 Overview l Chicago (busiest airport in US) n 57 million passengers (2002) (72 million 2000) n 7 active runways l Denver International n 36 million passengers (2002) l San Francisco International n 31 million passengers (2002) (34 million 2001) l JFK (New York) n 29 million passengers (2002) (32 million 2000) l Seattle/Tacoma (SeaTac) n 27 million passengers (2001) l Boston Logan n 24 million passengers (2002) l Philadelphia n 23 million passengers (2002)

4 More Airports with and C-H l Austin – Bergstrom Intl l Baltimore Washington l Boston Logan l Buffalo Niagra International l Chicago Midway l Cleveland Hopkins International l Detroit Wayne County l Houston Intercontinental l Las Vegas McCarran Intl l Memphis International l Miami International l Minneapolis St. Paul Intl l Orlando International l Ronald Regan Washington National l St. Louis Lambert International l Salt Lake City International l Syracuse Hancock Intl l Tampa International l Tulsa International l Washington Dulles Intl


Download ppt "© 2002 Eaton Corporation. All rights reserved. …electrical distribution system design for reliable and cost effective operation Airport Facility Electrical."

Similar presentations


Ads by Google